Back to bathroom remodel contractors
Mcmahon Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2009 to Sep 2026
- Last 24 months
- 14 permits filed
172 permits since 2000: 125 completed, 14 in progress, 28 never finaled, 5 expired or cancelled.
Of the 28 never-finaled permits, 7 are 3 to 5 years old, 8 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
64 bathroom remodel permits: 48 completed, 6 in progress, 9 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2026 | In progress issued Jun 2026 | 370 Lexington St | pursuant to planning approval 2025-002290prj, front facade improvements, demolition of (e) rear horizontal addition, replacement with (n) rear horizontal addition inluding (n) bedroom, (n) bath, (n) laundry room.Details
pursuant to planning approval 2025-002290prj, front facade improvements, demolition of (e) rear horizontal addition, replacement with (n) rear horizontal addition inluding (n) bedroom, (n) bath, (n) laundry room. | $80,000 |
| May 1, 2026 | In progress issued May 2026 | 2221 Scott St | remodel (e) attic bathroom in kind. new plumbing fixtures, tile in (e) locations. (attic bathroom previously permitted under pa# 254499, dated 08/30/1961. approx 50 sq ft.Details
remodel (e) attic bathroom in kind. new plumbing fixtures, tile in (e) locations. (attic bathroom previously permitted under pa# 254499, dated 08/30/1961. approx 50 sq ft. | $15,000 |
| Jan 23, 2026 | Completed final sign-off Aug 2026 | 2019 Green St | demo fixtures and finishes in 2 existing bathrooms. install new fixtures and finishes in 2 existing bathrooms. fixtures to be replace to current locations. no structural work. demo kitchen countertops and backsplash and replace . all in kindDetails
demo fixtures and finishes in 2 existing bathrooms. install new fixtures and finishes in 2 existing bathrooms. fixtures to be replace to current locations. no structural work. demo kitchen countertops and backsplash and replace . all in kind | $166,000 |
| Sep 30, 2025 | In progress issued Sep 2025 | 636 Hyde St | unit #201: remodel bathroom: partial demo on drywall, remove and replace, remove all finishes. install tile flooring, new plumbing fixture, and paint. remodel in-kind.Details
unit #201: remodel bathroom: partial demo on drywall, remove and replace, remove all finishes. install tile flooring, new plumbing fixture, and paint. remodel in-kind. | $28,221 |
| Apr 9, 2025 | In progress issued Apr 2025 | 233 Parker Av | to comply with nov# 202428823: do repairs in units 203, 204, 303, 304, & 400 due to fire damage. repairs kitchen and bathrooms in-kind.Details
to comply with nov# 202428823: do repairs in units 203, 204, 303, 304, & 400 due to fire damage. repairs kitchen and bathrooms in-kind. | $250,000 |
| Jan 30, 2025 | In progress issued Jan 2025 | 135 Cerritos Av | remove drywall and insluation from primary bathroom ceiling, remove deck tile above to expose roofing membrane make neccessary repairs to stop leak. install (n) drywall, insulation, and paint ceiling. not visible from street.Details
remove drywall and insluation from primary bathroom ceiling, remove deck tile above to expose roofing membrane make neccessary repairs to stop leak. install (n) drywall, insulation, and paint ceiling. not visible from street. | $15,000 |
| Apr 3, 2024 | Completed final sign-off Feb 2025 | 840 Lake St | unit 3 - remodel bathroom, new kitchen countertops, tile backsplash and drawer/door fronts. refinish hardwood floors and paint unit interior. all in kindDetails
unit 3 - remodel bathroom, new kitchen countertops, tile backsplash and drawer/door fronts. refinish hardwood floors and paint unit interior. all in kind | $130,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2026 | 100 Judah St | expansion and remodel of basement: new powder room, gym, storage, mech room & laundry closet. 1 nw window, 1st floor kitchen remodel, demo & rebuild of extg sunrm & utility rooms, new powder room & pantry. 1 nw window. 2nd fl: remodel, 2 nw full bathrooms, 3rd fl remodel: 2 nw full baths & laundryDetails
expansion and remodel of basement: new powder room, gym, storage, mech room & laundry closet. 1 nw window, 1st floor kitchen remodel, demo & rebuild of extg sunrm & utility rooms, new powder room & pantry. 1 nw window. 2nd fl: remodel, 2 nw full bathrooms, 3rd fl remodel: 2 nw full baths & laundry | $450,000 |
| Feb 14, 2024 | In progress issued Feb 2024 | 883 42nd Av | in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s). | $11,000 |
| Jul 25, 2023 | Never finaled issued Jul 2023, no final | 200 Seacliff Av | remodel basement bathroom, new sheetrock, tile, plumbing fixtures, light fixtures, paint. new hardwood floors, doors, trim & tile bathroom on top level, patch sheetrock and paint. no new fixtures added. all work in kind.Details
remodel basement bathroom, new sheetrock, tile, plumbing fixtures, light fixtures, paint. new hardwood floors, doors, trim & tile bathroom on top level, patch sheetrock and paint. no new fixtures added. all work in kind. | $150,000 |
| Apr 10, 2023 | Completed final sign-off Feb 2024 | 601 Fell St | water damage repair and resolution of nov 202171894. remove and replace damaged drywall, insulation, finishes, etc. reconfigure flr plan at 3/f bathroom. replace damaged electrical wiring to panel. replace (e) plumbing fixtures. remove (e) wooden portion of fence to meet 3' max height.Details
water damage repair and resolution of nov 202171894. remove and replace damaged drywall, insulation, finishes, etc. reconfigure flr plan at 3/f bathroom. replace damaged electrical wiring to panel. replace (e) plumbing fixtures. remove (e) wooden portion of fence to meet 3' max height. | $211,000 |
| Mar 8, 2023 | Completed final sign-off Apr 2024 | 883 42nd Av | remove 8 sashes at front and replace in-kind. remove 2 sashes and 1 picture window from top flr bathroom located at side of house. apply finish paint after window and sash installation. picture window replaced is same size and location.Details
remove 8 sashes at front and replace in-kind. remove 2 sashes and 1 picture window from top flr bathroom located at side of house. apply finish paint after window and sash installation. picture window replaced is same size and location. | $43,000 |
| May 25, 2022 | Never finaled issued May 2022, no final | 200 Seacliff Av | remodel exisitng top floor primary bathroom, strip walls (less than 50% repair), ceiling and floor to sub strate. new electrical, plumbing, drywall, tile, trim and paint. (no work)Details
remodel exisitng top floor primary bathroom, strip walls (less than 50% repair), ceiling and floor to sub strate. new electrical, plumbing, drywall, tile, trim and paint. (no work) | $60,000 |
| Mar 25, 2022 | Completed final sign-off Sep 2022 | 1642 44th Av | replace interior doors, change light fixtures, refinish floors, paint interior of house- clean bathroom tile and tubs.Details
replace interior doors, change light fixtures, refinish floors, paint interior of house- clean bathroom tile and tubs. | $15,000 |
| Mar 17, 2022 | Completed final sign-off Apr 2024 | 254 28th Av | remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace.Details
remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace. | $300,000 |
| Oct 8, 2021 | Completed final sign-off Sep 2022 | 1741 16th Av | remove finishes in one primarty bathroom down to the studs & substrate. install new finishes, plumbing, fixtures and faucets. no walls to be removed or modified. no strutural work.Details
remove finishes in one primarty bathroom down to the studs & substrate. install new finishes, plumbing, fixtures and faucets. no walls to be removed or modified. no strutural work. | $80,000 |
| Sep 29, 2021 | Never finaled issued Feb 2022, no final | 634 27th Av | interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet.Details
interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet. | $425,000 |
| Aug 24, 2021 | Never finaled issued Aug 2021, no final | 245 Hartford St | remove extg brick fire place facade. repair wall and drywall, patch hardwood floor and refinish. install baseboard, paint bath rooms and closet.Details
remove extg brick fire place facade. repair wall and drywall, patch hardwood floor and refinish. install baseboard, paint bath rooms and closet. | $50,000 |
| May 26, 2021 | Completed final sign-off Oct 2022 | 4021 Mission St | remodel bath on 2nd floor. convert 1st floor space to living space containing bedroom. replace wood siding at rear wall.Details
remodel bath on 2nd floor. convert 1st floor space to living space containing bedroom. replace wood siding at rear wall. | $75,000 |
| Feb 5, 2021 | Completed final sign-off Jul 2023 | 2361 Bryant St | interior remodels on 2/f & 3/f: remodel kitchens, remove wall between ktichen & living room; remodel bathrooms add 3/4 bathrooms. new skylights.Details
interior remodels on 2/f & 3/f: remodel kitchens, remove wall between ktichen & living room; remodel bathrooms add 3/4 bathrooms. new skylights. | $75,000 |
| Jun 19, 2020 | Completed final sign-off May 2023 | 725 Florida St | unit 2 e aka #10 - remodel two existing bathrooms & kitchen like for like. paint entire unit. the downstairs bathroom is approximately 10¿ x 8¿ on the upstairs bathroom is approximately 8¿ 6¿ x 8¿. no plans. must comply with sffc sec 1103.7.6.1 fire alarm under sep permit.Details
unit 2 e aka #10 - remodel two existing bathrooms & kitchen like for like. paint entire unit. the downstairs bathroom is approximately 10¿ x 8¿ on the upstairs bathroom is approximately 8¿ 6¿ x 8¿. no plans. must comply with sffc sec 1103.7.6.1 fire alarm under sep permit. | $300,000 |
| Jan 24, 2019 | Completed final sign-off Oct 2020 | 2409 Scott St | unit #1: remodel existing bathroom, add a powder room with washer & dryer.Details
unit #1: remodel existing bathroom, add a powder room with washer & dryer. | $25,000 |
| Oct 18, 2018 | Completed final sign-off Jan 2020 | 1443 Francisco St | 3rd floor: relocate kitchen, remodel bathroom, and add new bathroom.Details
3rd floor: relocate kitchen, remodel bathroom, and add new bathroom. | $46,000 |
| Aug 14, 2018 | Completed final sign-off Sep 2019 | 257 Brentwood Av | remodel basement: rebuild the stairs between basement and first floor. add bedroom, bath, and living spaceDetails
remodel basement: rebuild the stairs between basement and first floor. add bedroom, bath, and living space | $45,000 |
| Jun 5, 2018 | Completed final sign-off Dec 2018 | 3236 Sacramento St | revision to 201805098619 create a new bathroom at second flrDetails
revision to 201805098619 create a new bathroom at second flr | $10,000 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 3236 Sacramento St | remodel 3 bathrooms on 2/f. change tile, plumbing fiturs, shower doors, vaniies and paint. no structural work to be completed. no walls to be moved.size approx 8x8, 6x6,12x16, lighting per cenc 150.0(k).Details
remodel 3 bathrooms on 2/f. change tile, plumbing fiturs, shower doors, vaniies and paint. no structural work to be completed. no walls to be moved.size approx 8x8, 6x6,12x16, lighting per cenc 150.0(k). | $45,000 |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 2215 Lake St | remodel 2 bathrooms at 3rd floor; lightwell infill at 3/f; 2 new skylights.Details
remodel 2 bathrooms at 3rd floor; lightwell infill at 3/f; 2 new skylights. | $20,000 |
| Jul 25, 2017 | Completed final sign-off Feb 2018 | 23 Alta St | new bedroom, add (n) en suite bath on 2/f, (n) partition wall at guest bedroom closet. (n) desk in guest bedroom & (n) pemko drop seal door at guest bedroom. (n) shelving in new bedroom.Details
new bedroom, add (n) en suite bath on 2/f, (n) partition wall at guest bedroom closet. (n) desk in guest bedroom & (n) pemko drop seal door at guest bedroom. (n) shelving in new bedroom. | $30,000 |
| Jun 14, 2017 | Completed final sign-off Jul 2018 | 190 Seacliff Av | renovate 2 existing master bathrooms. new finishes throughout both bathrooms. no structural workDetails
renovate 2 existing master bathrooms. new finishes throughout both bathrooms. no structural work | $80,000 |
| May 23, 2017 | Completed final sign-off Feb 2018 | 39 Delmar St | remodel bathroom and laundry area within new plumbing fixtures, new drywall, new tile, new interior doors & trim, paint area that have been remodeled. no structural work.Details
remodel bathroom and laundry area within new plumbing fixtures, new drywall, new tile, new interior doors & trim, paint area that have been remodeled. no structural work. | $52,000 |
| Apr 18, 2017 | Completed final sign-off Sep 2017 | 234 Gates St | renovate existing full bath and install new full bath at 2nd flDetails
renovate existing full bath and install new full bath at 2nd fl | $40,000 |
| Mar 23, 2017 | Completed final sign-off Mar 2018 | 722 31st Av | reconfigure habitable space & stair @ (e) 1st floor including a bedroom, bath, powder room, family room, laundry & storage area. add new skylight.Details
reconfigure habitable space & stair @ (e) 1st floor including a bedroom, bath, powder room, family room, laundry & storage area. add new skylight. | $91,000 |
| Mar 8, 2017 | Completed final sign-off Nov 2017 | 210 Magellan Av | remodel master bathroom, 1 new fixture, faucets, cabinets, tile, stone and paint. replace kitchen cabinets and new tile, re-finish 1st floor hardwood floors. new cabinets in dining room. paint interior of house. no structural work.Details
remodel master bathroom, 1 new fixture, faucets, cabinets, tile, stone and paint. replace kitchen cabinets and new tile, re-finish 1st floor hardwood floors. new cabinets in dining room. paint interior of house. no structural work. | $60,000 |
| Feb 24, 2017 | Expired or cancelled expired Mar 2026 | 315 Mississippi St | interior remodel of kitchen & bath in single family home, no new square footage, new windows & french door in remodeled rooms only, structural repair in crawl spaceDetails
interior remodel of kitchen & bath in single family home, no new square footage, new windows & french door in remodeled rooms only, structural repair in crawl space | $75,000 |
| Nov 10, 2016 | Never finaled issued Nov 2016, no final | 524 27th Av | remodel existing bathroom(1) - remove existing finishes & fixtures, install new drywall, tile, trim, plumbing fixtures & faucets and paint. no walls to be moved and no structural to be performed.Details
remodel existing bathroom(1) - remove existing finishes & fixtures, install new drywall, tile, trim, plumbing fixtures & faucets and paint. no walls to be moved and no structural to be performed. | $30,000 |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 1031 Jones St | interior renovation of master bathroom, cosmetic upgrades to (e) wood burning fireplaces, electrical upgrade throughout, new lighting in select areas and 8 sq ft addition to bathroom on north side of propertyDetails
interior renovation of master bathroom, cosmetic upgrades to (e) wood burning fireplaces, electrical upgrade throughout, new lighting in select areas and 8 sq ft addition to bathroom on north side of property | $90,000 |
| May 25, 2016 | Completed final sign-off Aug 2016 | 2030 03rd St | remove floor tile plumbing fixtures & cabinets in 1 bedroom & replace w/ new. remove & replace peninsula floor tile. reinstall (e) sink, faucet & dishwasher. paint kitchen & bathroom & install new cabinet hardware work in unit #12 only. light, hood to remain. n/a for maher.Details
remove floor tile plumbing fixtures & cabinets in 1 bedroom & replace w/ new. remove & replace peninsula floor tile. reinstall (e) sink, faucet & dishwasher. paint kitchen & bathroom & install new cabinet hardware work in unit #12 only. light, hood to remain. n/a for maher. | $40,000 |
| Jan 28, 2016 | Completed final sign-off Jul 2019 | 1330 11th Av | rear yard add to (e)2 unit res. addition & renovation to add 1 bedroom and half bath on ground level, addition of (1)bedrm & (1)bath to each (e) d.u. seismic upgrade & (n)interior renovation @ all levels as req'd. outdoor decks/stairs add to rear of bldg. result:2 units over a garageDetails
rear yard add to (e)2 unit res. addition & renovation to add 1 bedroom and half bath on ground level, addition of (1)bedrm & (1)bath to each (e) d.u. seismic upgrade & (n)interior renovation @ all levels as req'd. outdoor decks/stairs add to rear of bldg. result:2 units over a garage | $215,400 |
| Nov 23, 2015 | Completed final sign-off Aug 2016 | 301 Mission St | install new cabinets in living room, master bahroom and retrofit closets. change out master bathroom vanity top, install mirrors, add dimmers and replace track lighting with new upgraded track lighting.Details
install new cabinets in living room, master bahroom and retrofit closets. change out master bathroom vanity top, install mirrors, add dimmers and replace track lighting with new upgraded track lighting. | $80,000 |
| Nov 3, 2015 | Completed final sign-off Jan 2017 | 370 Lexington St | remodel kitchen on 1st fl and bedroom/bath on 2nd fl. add access stair to garage. replace window sashes.Details
remodel kitchen on 1st fl and bedroom/bath on 2nd fl. add access stair to garage. replace window sashes. | $60,000 |
| Oct 28, 2015 | Completed final sign-off Oct 2017 | 150 02nd Av | addition and remodel at rear of building. 1st fl, remodel bathroom and add family room. 2nd fl, add bedroom and full bath. 3rd fl, add roof deck.Details
addition and remodel at rear of building. 1st fl, remodel bathroom and add family room. 2nd fl, add bedroom and full bath. 3rd fl, add roof deck. | $85,000 |
| Jun 10, 2015 | Completed final sign-off Mar 2016 | 460 Ellsworth St | interior remodel/renovation including removal of selected partition walls, remodel/enlarge bathroom, at 1st floor level, remodel enlarge bedroom at 1st floor level. new kitchen cabinets and fixtures. no exterior work.Details
interior remodel/renovation including removal of selected partition walls, remodel/enlarge bathroom, at 1st floor level, remodel enlarge bedroom at 1st floor level. new kitchen cabinets and fixtures. no exterior work. | $60,000 |
| Jun 1, 2015 | Completed final sign-off Aug 2016 | 832 Diamond St | convert the (e) unconditioned space on the ground floor into a new bathroom, family room and utility area.Details
convert the (e) unconditioned space on the ground floor into a new bathroom, family room and utility area. | $225,000 |
| Apr 13, 2015 | Completed final sign-off Dec 2015 | 2123 33rd Av | remodel (1) bathroom, demo to studs, new electrical new plumbing/fixtures/faucets, new drywall, new tile, paint, vanity. no structural work to be performed. size approx. 50 sq. ft.Details
remodel (1) bathroom, demo to studs, new electrical new plumbing/fixtures/faucets, new drywall, new tile, paint, vanity. no structural work to be performed. size approx. 50 sq. ft. | $25,000 |
| Mar 27, 2015 | Completed final sign-off May 2016 | 113 Gates St | interior renovation. remove plaster & select partition walls. add & remove ext bathrooms, relocate windows.nw dormers. reroof. repair extg decks & stairs. repair/restucco & reside exterior walls. violations correc. to comply with ces nov #200452883 dryrot. ces nov 200448162 to legalize dormers.Details
interior renovation. remove plaster & select partition walls. add & remove ext bathrooms, relocate windows.nw dormers. reroof. repair extg decks & stairs. repair/restucco & reside exterior walls. violations correc. to comply with ces nov #200452883 dryrot. ces nov 200448162 to legalize dormers. | $300,000 |
| Jul 15, 2014 | Completed final sign-off Aug 2014 | 152 Lombard St | paint entire unit, remove existing carpet and install new carpet, install 2 new toilets, and smoke and carbon/smoke detectors. add faucet in master bath. no changes to door or windows. unit 302 onlyDetails
paint entire unit, remove existing carpet and install new carpet, install 2 new toilets, and smoke and carbon/smoke detectors. add faucet in master bath. no changes to door or windows. unit 302 only | $2,000 |
| Jul 15, 2014 | Completed final sign-off Dec 2014 | 2752 Baker St | remodel 2 baths on the 2nd fl. new tile, vanities, plumbing fixtures and faucets, paint. no structural work to be performed. new drywallDetails
remodel 2 baths on the 2nd fl. new tile, vanities, plumbing fixtures and faucets, paint. no structural work to be performed. new drywall | $50,000 |
| Jul 3, 2014 | Completed final sign-off Oct 2014 | 3453 18th St | move sink & toilet in existing bathroom, patch floor & tile, install plumbing fixtures.Details
move sink & toilet in existing bathroom, patch floor & tile, install plumbing fixtures. | $10,000 |
| Jul 1, 2014 | Never finaled issued Jul 2014, no final | 30 Santa Rita Av | remodel kitchen, bathrooms and deck. fill in recess at rear 1st flr. replace window & door on west facade and install french door on north facadeDetails
remodel kitchen, bathrooms and deck. fill in recess at rear 1st flr. replace window & door on west facade and install french door on north facade | $50,000 |
| Jun 18, 2014 | Never finaled issued Jun 2014, no final | 30 Santa Rita Av | re-finish & re-fixture 2/f 3/4 bath; to comply with cec150(k)10Details
re-finish & re-fixture 2/f 3/4 bath; to comply with cec150(k)10 | $4,000 |
| May 28, 2014 | Completed final sign-off Jun 2016 | 376 Lexington St | horizontal addition rebuild main floor annex, remodel hall bathroom & master bedroom, add master bath on 2nd floor. add roof deck on 2nd floor over annex. add new hall on 2nd floor. add laundry closet & master closet on 2nd floor. ** maher: compliance with ordinance no# 155-13 not required **Details
horizontal addition rebuild main floor annex, remodel hall bathroom & master bedroom, add master bath on 2nd floor. add roof deck on 2nd floor over annex. add new hall on 2nd floor. add laundry closet & master closet on 2nd floor. ** maher: compliance with ordinance no# 155-13 not required ** | $39,500 |
| Apr 25, 2014 | Completed final sign-off Jun 2014 | 1750 Divisadero St | interior renovation of an extg restaurant space with the exception of painting the west & north facade. extended bar renovation & bath renovation(ceiling wall floor). fully ada compliant.Details
interior renovation of an extg restaurant space with the exception of painting the west & north facade. extended bar renovation & bath renovation(ceiling wall floor). fully ada compliant. | $88,230 |
| Jan 23, 2014 | Completed final sign-off Apr 2014 | 1109 Stanyan St | remodel 1 bathroom, remove tile and fixtures in shower stall and floor, add new tile and fixtures, patch drywall and paint bahtroom, add 2 can lights, led or flourescent, exh. fan to remain.Details
remodel 1 bathroom, remove tile and fixtures in shower stall and floor, add new tile and fixtures, patch drywall and paint bahtroom, add 2 can lights, led or flourescent, exh. fan to remain. | $12,500 |
| Oct 24, 2013 | Completed final sign-off Mar 2014 | 131 Caselli Av | revision to 201308093972. change steel joists at bath floor from channel to tube. install new beams at bay window in family room. existing beam was sagging, supported at same postsDetails
revision to 201308093972. change steel joists at bath floor from channel to tube. install new beams at bay window in family room. existing beam was sagging, supported at same posts | $500 |
| Sep 5, 2013 | Completed final sign-off Feb 2014 | 4757 25th St | remodel existing bath,new drywall,electrical,plumbing fixtures,tile,trim, cabinets,paint.also replace existing vinyl windows with new marvin wood clad windows with low e glass and paint,7 windows total. no structural work to be preformed. all windws face street to be aluminum clad wood, tdl 2" recesDetails
remodel existing bath,new drywall,electrical,plumbing fixtures,tile,trim, cabinets,paint.also replace existing vinyl windows with new marvin wood clad windows with low e glass and paint,7 windows total. no structural work to be preformed. all windws face street to be aluminum clad wood, tdl 2" reces | $30,000 |
| Jun 7, 2013 | Completed final sign-off Aug 2013 | 3743 Fillmore St | demo (e) bathroom & kitchen down to studs & remodel bathroom, new cabinets, countertops, plumbing, electrical, tile work, trim & paint.Details
demo (e) bathroom & kitchen down to studs & remodel bathroom, new cabinets, countertops, plumbing, electrical, tile work, trim & paint. | $50,000 |
| Feb 4, 2013 | Completed final sign-off May 2013 | 30 Jersey St | demo existing bathroom to studs and remodel new plumbing. add 3 new skylights (electrical, tilework trimp and paint)Details
demo existing bathroom to studs and remodel new plumbing. add 3 new skylights (electrical, tilework trimp and paint) | $60,000 |
| Jan 15, 2013 | Completed final sign-off May 2013 | 950 Monterey Bl | reconfigure & remodel baths, add one new bath, remodel kitchen, rebuild (e) interior stair, replace wood windows, not visible from street. new skylight on flat roof.Details
reconfigure & remodel baths, add one new bath, remodel kitchen, rebuild (e) interior stair, replace wood windows, not visible from street. new skylight on flat roof. | $75,000 |
| Jan 9, 2013 | Completed final sign-off Jun 2015 | 1640 Fulton St | demolish non-complying rear addition & replace w/(n)terraced addition consisting of family rm, kitchen, master suite & playrm. raise rear portion of roof to legalize 4th fl & add(n)connecting stair. add(n)bath @ 4th fl. (n)roof decks, exterior rear stair & green roof. update foundation. fully sprinkDetails
demolish non-complying rear addition & replace w/(n)terraced addition consisting of family rm, kitchen, master suite & playrm. raise rear portion of roof to legalize 4th fl & add(n)connecting stair. add(n)bath @ 4th fl. (n)roof decks, exterior rear stair & green roof. update foundation. fully sprink | $100,000 |
| Oct 4, 2012 | Completed final sign-off Jan 2013 | 1760 Greenwich St | remodel kitchen: new cabients, countertops, add cans to ceilings, refinish hardwood floors, paint entire unit, replace tiles in bathroom.Details
remodel kitchen: new cabients, countertops, add cans to ceilings, refinish hardwood floors, paint entire unit, replace tiles in bathroom. | $35,000 |
| Apr 11, 2012 | Never finaled issued Apr 2012, no final | 141 Hampshire St | install new tile in 3 bathrooms, new countertop in kitchen, replace existing hardwood floors on 2nd level and refinish on 1/f. install new baseboard, new book case, paint all new work, no structural work.Details
install new tile in 3 bathrooms, new countertop in kitchen, replace existing hardwood floors on 2nd level and refinish on 1/f. install new baseboard, new book case, paint all new work, no structural work. | $60,000 |
| Nov 1, 2011 | Completed final sign-off Oct 2012 | 131 San Aleso Av | remodel (e) kitchen and adjacent bath & stair areas to include new kitchen, laundry and power room. add new exterior door landing and stair to grade. remodel master bath.Details
remodel (e) kitchen and adjacent bath & stair areas to include new kitchen, laundry and power room. add new exterior door landing and stair to grade. remodel master bath. | $80,000 |
| May 9, 2011 | Completed final sign-off Aug 2011 | 152 Lombard St | remodel 2 baths, 1 kitchen. new tile in baths, 2 counters in kitchen trim package, plumbing fixt, hardwood floors, paint interior walls and trim, new wall light sconces. wall trim and baseboard. no change in wall and opening layout. comply with cfc 150 k lighting req.Details
remodel 2 baths, 1 kitchen. new tile in baths, 2 counters in kitchen trim package, plumbing fixt, hardwood floors, paint interior walls and trim, new wall light sconces. wall trim and baseboard. no change in wall and opening layout. comply with cfc 150 k lighting req. | $60,000 |
| Mar 15, 2011 | Completed final sign-off May 2011 | 2425 Market St | demo 1 bathroom, replace plumbing fixtures, replace electrical fixtures plus add one light, sheetrock, tile and paint. lighting to comply with cec 150(k) no change to walls, windows, doors.Details
demo 1 bathroom, replace plumbing fixtures, replace electrical fixtures plus add one light, sheetrock, tile and paint. lighting to comply with cec 150(k) no change to walls, windows, doors. | $7,000 |