Mcmahon Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2009 to Sep 2026
- Last 24 months
- 14 permits filed
172 permits since 2000: 125 completed, 14 in progress, 28 never finaled, 5 expired or cancelled.
Of the 28 never-finaled permits, 7 are 3 to 5 years old, 8 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
18 stairs permits: 13 completed, 1 in progress, 3 never finaled, 1 expired or cancelled. Typically 45 days from filing to permit and 353 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 24 Presidio Av | unit 24: remove kitchen countertop & replace, paint kitchen cabinets, refinish upper floor hardwood floors & stairs, install new can lighting & switches, patch a finish drywall, paint entire unit, no structural work or removing walls.Details
unit 24: remove kitchen countertop & replace, paint kitchen cabinets, refinish upper floor hardwood floors & stairs, install new can lighting & switches, patch a finish drywall, paint entire unit, no structural work or removing walls. | $170,000 |
| Sep 23, 2022 | Completed final sign-off Sep 2023 | 1336 Shrader St | replace rear deck and stairs in kind.Details
replace rear deck and stairs in kind. | $25,000 |
| Mar 17, 2022 | Completed final sign-off Apr 2024 | 254 28th Av | remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace.Details
remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace. | $300,000 |
| Sep 29, 2021 | Never finaled issued Feb 2022, no final | 634 27th Av | interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet.Details
interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet. | $425,000 |
| Aug 14, 2018 | Completed final sign-off Sep 2019 | 257 Brentwood Av | remodel basement: rebuild the stairs between basement and first floor. add bedroom, bath, and living spaceDetails
remodel basement: rebuild the stairs between basement and first floor. add bedroom, bath, and living space | $45,000 |
| Mar 23, 2017 | Completed final sign-off Mar 2018 | 722 31st Av | reconfigure habitable space & stair @ (e) 1st floor including a bedroom, bath, powder room, family room, laundry & storage area. add new skylight.Details
reconfigure habitable space & stair @ (e) 1st floor including a bedroom, bath, powder room, family room, laundry & storage area. add new skylight. | $91,000 |
| Nov 10, 2016 | Expired or cancelled cancelled Feb 2020 | 113 Gates St | replce stair, deck & landing at rear of building, route with var 2015009598 (kimberly durandet)Details
replce stair, deck & landing at rear of building, route with var 2015009598 (kimberly durandet) | $8,000 |
| Jan 28, 2016 | Completed final sign-off Jul 2019 | 1330 11th Av | rear yard add to (e)2 unit res. addition & renovation to add 1 bedroom and half bath on ground level, addition of (1)bedrm & (1)bath to each (e) d.u. seismic upgrade & (n)interior renovation @ all levels as req'd. outdoor decks/stairs add to rear of bldg. result:2 units over a garageDetails
rear yard add to (e)2 unit res. addition & renovation to add 1 bedroom and half bath on ground level, addition of (1)bedrm & (1)bath to each (e) d.u. seismic upgrade & (n)interior renovation @ all levels as req'd. outdoor decks/stairs add to rear of bldg. result:2 units over a garage | $215,400 |
| Nov 3, 2015 | Completed final sign-off Jan 2017 | 370 Lexington St | remodel kitchen on 1st fl and bedroom/bath on 2nd fl. add access stair to garage. replace window sashes.Details
remodel kitchen on 1st fl and bedroom/bath on 2nd fl. add access stair to garage. replace window sashes. | $60,000 |
| Mar 27, 2015 | Completed final sign-off May 2016 | 113 Gates St | interior renovation. remove plaster & select partition walls. add & remove ext bathrooms, relocate windows.nw dormers. reroof. repair extg decks & stairs. repair/restucco & reside exterior walls. violations correc. to comply with ces nov #200452883 dryrot. ces nov 200448162 to legalize dormers.Details
interior renovation. remove plaster & select partition walls. add & remove ext bathrooms, relocate windows.nw dormers. reroof. repair extg decks & stairs. repair/restucco & reside exterior walls. violations correc. to comply with ces nov #200452883 dryrot. ces nov 200448162 to legalize dormers. | $300,000 |
| Mar 17, 2014 | Completed final sign-off Aug 2014 | 17 West Clay St | remodel kitchen & add new deck & stair less than 30 " on grade off kitchen.Details
remodel kitchen & add new deck & stair less than 30 " on grade off kitchen. | $20,000 |
| Feb 13, 2014 | Never finaled issued Jan 2015, no final | 409 Clayton St | replace 2nd floor deck & stairs. infill (n) room at 3rd floor & (n) deck over on the 4th floor. ** maher: compliance with ordinance no# 155-13 not required **Details
replace 2nd floor deck & stairs. infill (n) room at 3rd floor & (n) deck over on the 4th floor. ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 |
| May 28, 2013 | Completed final sign-off Jun 2015 | 1640 Fulton St | in-fill 2-story add at passageway on sw side of subj prop. raise roof on sw side to create add'l front facing bedrm. remove non-original stucco front facade & replace w/ approp siding/detailing & front entry stair. replace front windows. fully sprinkled. no change to rear facade. (ref #201301097570)Details
in-fill 2-story add at passageway on sw side of subj prop. raise roof on sw side to create add'l front facing bedrm. remove non-original stucco front facade & replace w/ approp siding/detailing & front entry stair. replace front windows. fully sprinkled. no change to rear facade. (ref #201301097570) | $10,000 |
| Jan 15, 2013 | Completed final sign-off May 2013 | 950 Monterey Bl | reconfigure & remodel baths, add one new bath, remodel kitchen, rebuild (e) interior stair, replace wood windows, not visible from street. new skylight on flat roof.Details
reconfigure & remodel baths, add one new bath, remodel kitchen, rebuild (e) interior stair, replace wood windows, not visible from street. new skylight on flat roof. | $75,000 |
| Jan 9, 2013 | Completed final sign-off Jun 2015 | 1640 Fulton St | demolish non-complying rear addition & replace w/(n)terraced addition consisting of family rm, kitchen, master suite & playrm. raise rear portion of roof to legalize 4th fl & add(n)connecting stair. add(n)bath @ 4th fl. (n)roof decks, exterior rear stair & green roof. update foundation. fully sprinkDetails
demolish non-complying rear addition & replace w/(n)terraced addition consisting of family rm, kitchen, master suite & playrm. raise rear portion of roof to legalize 4th fl & add(n)connecting stair. add(n)bath @ 4th fl. (n)roof decks, exterior rear stair & green roof. update foundation. fully sprink | $100,000 |
| Jul 5, 2012 | Never finaled issued Jul 2012, no final | 18 Lansing St | remove (e) air conditioning unit. remove (e) 36" hgt steel guardrails and install (n) 42" guardrails. construct new closet at entry. install new 36" wide steel stair to exiting loft level.Details
remove (e) air conditioning unit. remove (e) 36" hgt steel guardrails and install (n) 42" guardrails. construct new closet at entry. install new 36" wide steel stair to exiting loft level. | $17,000 |
| Jan 12, 2012 | Completed final sign-off Mar 2012 | 2207 Pine St | replace in kind rear deck & stairs.Details
replace in kind rear deck & stairs. | $10,000 |
| Nov 1, 2011 | Completed final sign-off Oct 2012 | 131 San Aleso Av | remodel (e) kitchen and adjacent bath & stair areas to include new kitchen, laundry and power room. add new exterior door landing and stair to grade. remodel master bath.Details
remodel (e) kitchen and adjacent bath & stair areas to include new kitchen, laundry and power room. add new exterior door landing and stair to grade. remodel master bath. | $80,000 |