Mccormack Construction
- Based in
- Alameda
- On San Francisco permits
- Mar 2016 to Jun 2026
- Last 24 months
- 6 permits filed
37 permits since 2000: 30 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 189 days from filing to permit and 421 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2024 | Completed final sign-off Jan 2026 | 1 03rd Av | unit 3-remodel (e) kitchen and primary bath, guest bath, (n) plumbing and light fixtures replace in kind (e) windows in dining room (not visibile from street) update interior stairs to include replace tread and risers and hardrails in kindDetails
unit 3-remodel (e) kitchen and primary bath, guest bath, (n) plumbing and light fixtures replace in kind (e) windows in dining room (not visibile from street) update interior stairs to include replace tread and risers and hardrails in kind | $62,000 |
| Apr 21, 2023 | Completed final sign-off May 2025 | 1326 Guerrero St | replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring.Details
replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring. | $510,000 |
| Jun 9, 2022 | Completed final sign-off Jun 2023 | 179 San Felipe Av | kitchen remodel; remove (e) stairs from 2nd fl to 3rd fl; new window on east and south elevation wood clad to match (e) vif. (e) bathroom on 4/f to be remodeled.Details
kitchen remodel; remove (e) stairs from 2nd fl to 3rd fl; new window on east and south elevation wood clad to match (e) vif. (e) bathroom on 4/f to be remodeled. | $50,000 |
| Aug 27, 2021 | Completed final sign-off Dec 2022 | 518 Funston Av | restoration of orignial shiplap ext siding for rear of bldg. discovered in demo. proposed skylight above stair at rear of bldg, includes fire wall. revision to pa# 201908027805. no additional sq footage.Details
restoration of orignial shiplap ext siding for rear of bldg. discovered in demo. proposed skylight above stair at rear of bldg, includes fire wall. revision to pa# 201908027805. no additional sq footage. | $5,000 |
| May 8, 2017 | Completed final sign-off Jul 2020 | 46 Digby St | add unit per ord 162-16. convert an existing space into an auxillary dwelling unit. remove & replace exisitng side concrete exterior stairs with new . new fence & gate at top of concrete stairs. new canopy at entrance.Details
add unit per ord 162-16. convert an existing space into an auxillary dwelling unit. remove & replace exisitng side concrete exterior stairs with new . new fence & gate at top of concrete stairs. new canopy at entrance. | $90,000 |