Back to bathroom remodel contractors
Mccormack Construction
- Based in
- Alameda
- On San Francisco permits
- Mar 2016 to Jun 2026
- Last 24 months
- 6 permits filed
37 permits since 2000: 30 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 14 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2025 | Completed final sign-off Jun 2026 | 3622 22nd St | fire damage repair from incident on july 4. replace damaged floor, drywall, bathroom shower, roof deck, and roofing in kind like for like. plumbing replace in kind like for like as needed. replace in kind as neededminor framing as needed. to fully abate nov 202540574 (no work visible from street)Details
fire damage repair from incident on july 4. replace damaged floor, drywall, bathroom shower, roof deck, and roofing in kind like for like. plumbing replace in kind like for like as needed. replace in kind as neededminor framing as needed. to fully abate nov 202540574 (no work visible from street) | $452,833 |
| Aug 26, 2024 | Completed final sign-off Jan 2026 | 1 03rd Av | unit 3-remodel (e) kitchen and primary bath, guest bath, (n) plumbing and light fixtures replace in kind (e) windows in dining room (not visibile from street) update interior stairs to include replace tread and risers and hardrails in kindDetails
unit 3-remodel (e) kitchen and primary bath, guest bath, (n) plumbing and light fixtures replace in kind (e) windows in dining room (not visibile from street) update interior stairs to include replace tread and risers and hardrails in kind | $62,000 |
| Apr 21, 2023 | Completed final sign-off May 2025 | 1326 Guerrero St | replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring.Details
replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring. | $510,000 |
| Jun 9, 2022 | Completed final sign-off Jun 2023 | 179 San Felipe Av | kitchen remodel; remove (e) stairs from 2nd fl to 3rd fl; new window on east and south elevation wood clad to match (e) vif. (e) bathroom on 4/f to be remodeled.Details
kitchen remodel; remove (e) stairs from 2nd fl to 3rd fl; new window on east and south elevation wood clad to match (e) vif. (e) bathroom on 4/f to be remodeled. | $50,000 |
| May 24, 2022 | Expired or cancelled cancelled Jan 2026 | 258 28th Av | convert ground fl. storage room to family room, closet and storage lower floor level at front portion of 1st fl. new bathroomDetails
convert ground fl. storage room to family room, closet and storage lower floor level at front portion of 1st fl. new bathroom | $153,017 |
| Oct 13, 2021 | Completed final sign-off Jan 2022 | 122 Clayton St | one kitchen remodel cabinets and counter and floors. reconfigure some elec and add a few cans in hall. disconnect bath fixtures for new tile floorDetails
one kitchen remodel cabinets and counter and floors. reconfigure some elec and add a few cans in hall. disconnect bath fixtures for new tile floor | $40,000 |
| Jun 22, 2021 | Completed final sign-off Jan 2022 | 285 17th Av | 1) master bathroom remodel 2) remove & replace in kind below grade < 4 ft retaining wall in backyard 3) replace deck boards and railing in kind. less than 50%.Details
1) master bathroom remodel 2) remove & replace in kind below grade < 4 ft retaining wall in backyard 3) replace deck boards and railing in kind. less than 50%. | $50,000 |
| Mar 13, 2020 | Completed final sign-off Oct 2020 | 2040 Beach St | three full bathrooms remodel. add lights to living area and master bedroomDetails
three full bathrooms remodel. add lights to living area and master bedroom | $100,000 |
| Oct 2, 2019 | Completed final sign-off Oct 2020 | 2117 Leavenworth St | bathroom remodel, poweder room remoedl, laundry remodel, new floor, sheetrock & trim. layout stays same. no walls to be moved.Details
bathroom remodel, poweder room remoedl, laundry remodel, new floor, sheetrock & trim. layout stays same. no walls to be moved. | $120,000 |
| Jan 28, 2019 | Completed final sign-off Nov 2019 | 714 Chenery St | new kitchen & master bathroom & 2 smaller bathrooms. one structural wall removal, new floors, electrical & plumbing, new closet.Details
new kitchen & master bathroom & 2 smaller bathrooms. one structural wall removal, new floors, electrical & plumbing, new closet. | $200,000 |
| Jun 20, 2018 | Completed final sign-off Oct 2018 | 179 San Felipe Av | master bathroom remodel, no change of (e) fl planDetails
master bathroom remodel, no change of (e) fl plan | $28,000 |
| Jun 8, 2018 | Completed final sign-off Feb 2019 | 1345 Francisco St | bathroom and closet remodel. new bathroom. all work on second floor.Details
bathroom and closet remodel. new bathroom. all work on second floor. | $10,000 |
| Jul 18, 2017 | Completed final sign-off Jan 2018 | 171 Germania St | interior alteration of single condo unit, including bath & kitchen remodel. removal of 2 interior walls, replacement of 1 (e) window & 1 (e) exterior door.Details
interior alteration of single condo unit, including bath & kitchen remodel. removal of 2 interior walls, replacement of 1 (e) window & 1 (e) exterior door. | $80,000 |
| Jun 24, 2016 | Never finaled issued Jun 2016, no final | 415 College Av | new sheetrock throughout, new insulation throughout, kitchen & (1) bathroom remodel, new doors & trim, front/living room windows to be replaced. all work repair in-kind.Details
new sheetrock throughout, new insulation throughout, kitchen & (1) bathroom remodel, new doors & trim, front/living room windows to be replaced. all work repair in-kind. | $70,000 |
| May 18, 2016 | Completed final sign-off Jul 2016 | 651 Hearst Av | bathroom remodel, new plumbing & electrical using closet as part of bathroom. reframe new closet, close of doorway.Details
bathroom remodel, new plumbing & electrical using closet as part of bathroom. reframe new closet, close of doorway. | $25,000 |
| Mar 3, 2016 | Completed final sign-off Jun 2016 | 508 Oak St | add full bath in the space of the (e) closet and hallway nook (28.6 sf)Details
add full bath in the space of the (e) closet and hallway nook (28.6 sf) | $14,665 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 1974 44th Av | 1st flr: divide (e) family room into media room & office, convert portion of garage to bathroom, 2nd flr no work. no expansion ,no frame workDetails
1st flr: divide (e) family room into media room & office, convert portion of garage to bathroom, 2nd flr no work. no expansion ,no frame work | $46,875 |