Mccormack Construction
- Based in
- Alameda
- On San Francisco permits
- Mar 2016 to Jun 2026
- Last 24 months
- 6 permits filed
37 permits since 2000: 30 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 80 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2021 | Completed final sign-off Jan 2022 | 285 17th Av | 1) master bathroom remodel 2) remove & replace in kind below grade < 4 ft retaining wall in backyard 3) replace deck boards and railing in kind. less than 50%.Details
1) master bathroom remodel 2) remove & replace in kind below grade < 4 ft retaining wall in backyard 3) replace deck boards and railing in kind. less than 50%. | $50,000 |
| Aug 2, 2019 | Completed final sign-off Dec 2022 | 518 Funston Av | horizontal rear (2) story addition; (n) first level deck; relocate kitchen & powder room & laundry; window replacemtn at rear as needed.Details
horizontal rear (2) story addition; (n) first level deck; relocate kitchen & powder room & laundry; window replacemtn at rear as needed. | $437,000 |
| Jul 2, 2019 | Completed final sign-off Dec 2019 | 46 Digby St | woodrot repair existing 7'x39' rear deck at street/upper level. replace joists, ledger, railing, spaced boards on underside of deck. code required improvements: raise rail height, add deck ties <50%. no other work.same size same location. 42" max. partial repair only.Details
woodrot repair existing 7'x39' rear deck at street/upper level. replace joists, ledger, railing, spaced boards on underside of deck. code required improvements: raise rail height, add deck ties <50%. no other work.same size same location. 42" max. partial repair only. | $5,000 |