Back to kitchen remodel contractors
Mccormack Construction
- Based in
- Alameda
- On San Francisco permits
- Mar 2016 to Jun 2026
- Last 24 months
- 6 permits filed
37 permits since 2000: 30 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 13 completed, 1 in progress, 1 never finaled. Typically 2 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2025 | In progress issued Jan 2026 | 210 Lake St | construct (n) garage addition above grade. garage addition matches adjacent neighbors (e) build out. interior remodel to bottom unit#212 kitchen, bathrm & common spaces. remodel includes (n) horizontal addition to unit#212 @ rear of house. (n) patio, door & window for unit#210. provide 2 bicycle..Details
construct (n) garage addition above grade. garage addition matches adjacent neighbors (e) build out. interior remodel to bottom unit#212 kitchen, bathrm & common spaces. remodel includes (n) horizontal addition to unit#212 @ rear of house. (n) patio, door & window for unit#210. provide 2 bicycle.. | $385,000 |
| Aug 26, 2024 | Completed final sign-off Jan 2026 | 1 03rd Av | unit 3-remodel (e) kitchen and primary bath, guest bath, (n) plumbing and light fixtures replace in kind (e) windows in dining room (not visibile from street) update interior stairs to include replace tread and risers and hardrails in kindDetails
unit 3-remodel (e) kitchen and primary bath, guest bath, (n) plumbing and light fixtures replace in kind (e) windows in dining room (not visibile from street) update interior stairs to include replace tread and risers and hardrails in kind | $62,000 |
| Apr 21, 2023 | Completed final sign-off May 2025 | 1326 Guerrero St | replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring.Details
replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring. | $510,000 |
| Jun 9, 2022 | Completed final sign-off Jun 2023 | 179 San Felipe Av | kitchen remodel; remove (e) stairs from 2nd fl to 3rd fl; new window on east and south elevation wood clad to match (e) vif. (e) bathroom on 4/f to be remodeled.Details
kitchen remodel; remove (e) stairs from 2nd fl to 3rd fl; new window on east and south elevation wood clad to match (e) vif. (e) bathroom on 4/f to be remodeled. | $50,000 |
| Oct 13, 2021 | Completed final sign-off Jan 2022 | 122 Clayton St | one kitchen remodel cabinets and counter and floors. reconfigure some elec and add a few cans in hall. disconnect bath fixtures for new tile floorDetails
one kitchen remodel cabinets and counter and floors. reconfigure some elec and add a few cans in hall. disconnect bath fixtures for new tile floor | $40,000 |
| Feb 23, 2021 | Completed final sign-off Jul 2021 | 29 Parker Av | kitchen remodel: replace 6 windows in kind. street facing-3 front 3 sidesDetails
kitchen remodel: replace 6 windows in kind. street facing-3 front 3 sides | $49,000 |
| Oct 27, 2020 | Completed final sign-off Apr 2021 | 1895 Pacific Av | kitchen remodel: plmbign for washing matching & ventless dryer. some new lights.Details
kitchen remodel: plmbign for washing matching & ventless dryer. some new lights. | $50,000 |
| Aug 2, 2019 | Completed final sign-off Dec 2022 | 518 Funston Av | horizontal rear (2) story addition; (n) first level deck; relocate kitchen & powder room & laundry; window replacemtn at rear as needed.Details
horizontal rear (2) story addition; (n) first level deck; relocate kitchen & powder room & laundry; window replacemtn at rear as needed. | $437,000 |
| Jan 28, 2019 | Completed final sign-off Nov 2019 | 714 Chenery St | new kitchen & master bathroom & 2 smaller bathrooms. one structural wall removal, new floors, electrical & plumbing, new closet.Details
new kitchen & master bathroom & 2 smaller bathrooms. one structural wall removal, new floors, electrical & plumbing, new closet. | $200,000 |
| Apr 23, 2018 | Completed final sign-off Oct 2018 | 258 28th Av | 2nd fl - remodel (e) kitchen within the space of the (e) kitchen, study & family room; remove wall between study & family room; 1st fl - new beam/posts @ garage level to bring down loadsDetails
2nd fl - remodel (e) kitchen within the space of the (e) kitchen, study & family room; remove wall between study & family room; 1st fl - new beam/posts @ garage level to bring down loads | $35,000 |
| Aug 31, 2017 | Completed final sign-off May 2018 | 508 Oak St | remodel kitchen in speace of e kitchen and adjacent pantry. replace e windows and door at rear of bldg, not visible from street. voluntary shear panelingDetails
remodel kitchen in speace of e kitchen and adjacent pantry. replace e windows and door at rear of bldg, not visible from street. voluntary shear paneling | $31,187 |
| Jul 28, 2017 | Completed final sign-off Dec 2017 | 2864 Sacramento St | stud bearin gwall between kitchen and dining rm wi w8 x 40. sttel beam in 4th flDetails
stud bearin gwall between kitchen and dining rm wi w8 x 40. sttel beam in 4th fl | $35,000 |
| Jul 18, 2017 | Completed final sign-off Jan 2018 | 171 Germania St | interior alteration of single condo unit, including bath & kitchen remodel. removal of 2 interior walls, replacement of 1 (e) window & 1 (e) exterior door.Details
interior alteration of single condo unit, including bath & kitchen remodel. removal of 2 interior walls, replacement of 1 (e) window & 1 (e) exterior door. | $80,000 |
| Jun 23, 2017 | Completed final sign-off Nov 2017 | 1434 Plymouth Av | kitchen remodel within the space of the extg kitchen, new opening between extg kitchen and extg dinning room. window and door alterations on north facade.Details
kitchen remodel within the space of the extg kitchen, new opening between extg kitchen and extg dinning room. window and door alterations on north facade. | $32,000 |
| Jun 24, 2016 | Never finaled issued Jun 2016, no final | 415 College Av | new sheetrock throughout, new insulation throughout, kitchen & (1) bathroom remodel, new doors & trim, front/living room windows to be replaced. all work repair in-kind.Details
new sheetrock throughout, new insulation throughout, kitchen & (1) bathroom remodel, new doors & trim, front/living room windows to be replaced. all work repair in-kind. | $70,000 |