Marcos Leon Construction,Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to May 2019
- Last 24 months
- 0 permits filed
46 permits since 2000: 28 completed, 12 never finaled, 6 expired or cancelled.
Of the 12 never-finaled permits, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
7 stairs permits: 4 completed, 1 never finaled, 2 expired or cancelled. Typically 23 days from filing to permit and 714 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 29, 2016 | Completed final sign-off May 2020 | 551 37th Av | add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam,Details
add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam, | $275,000 |
| Oct 31, 2016 | Completed final sign-off Feb 2017 | 133 Putnam St | kitchen and bathroom remodel; new rear deck and stairs. see plansDetails
kitchen and bathroom remodel; new rear deck and stairs. see plans | $110,000 |
| Sep 7, 2016 | Completed final sign-off Jun 2021 | 63 Stoneyford Av | horizontal addition of two bedrooms at 1st level,add'l living spaces at 2nd level, new connecting stair, existing ground level rooms to be reconfigured on a new slab, new deck to be built on roof of the new 1st level with access from second level.Details
horizontal addition of two bedrooms at 1st level,add'l living spaces at 2nd level, new connecting stair, existing ground level rooms to be reconfigured on a new slab, new deck to be built on roof of the new 1st level with access from second level. | $175,000 |
| Jun 8, 2016 | Expired or cancelled suspend May 2017 | 617 Gennessee St | replace damaged ledger/beam/joists, deck material from wood to composite, widen (e) opening below deck to 3'& add door, add (n) door on same axis as basement opening. front stairs: replace dryrot wood handrail w/exterior grade wood, widen stairs, relocate electrical panelDetails
replace damaged ledger/beam/joists, deck material from wood to composite, widen (e) opening below deck to 3'& add door, add (n) door on same axis as basement opening. front stairs: replace dryrot wood handrail w/exterior grade wood, widen stairs, relocate electrical panel | $20,000 |
| Oct 6, 2015 | Completed final sign-off Aug 2016 | 447 Laidley St | revision to pa 2015 0820 4874: add n rooms to the grnd flr.- bedrm, family rm and full bathrm. lower foundation under n rooms to create 7'-6" ceiling ht, add n furnace; replace columns & beams and add a grade beam. 2 n windows on grn flr. demo rear door. rear stair more than 50% damage-repair inkindDetails
revision to pa 2015 0820 4874: add n rooms to the grnd flr.- bedrm, family rm and full bathrm. lower foundation under n rooms to create 7'-6" ceiling ht, add n furnace; replace columns & beams and add a grade beam. 2 n windows on grn flr. demo rear door. rear stair more than 50% damage-repair inkind | $80,000 |
| Dec 16, 2014 | Never finaled issued Jan 2015, no final | 1362 Powell St | comply with nov. 201485831 item #2: repair/rebuild wood stairs in the rear of the building in kind.Details
comply with nov. 201485831 item #2: repair/rebuild wood stairs in the rear of the building in kind. | $25,000 |
| Aug 1, 2014 | Expired or cancelled expired Dec 2018 | 3828 26th St | remove (e) metal handrail on entire staircase - street to main entry & replace w/ 1-3/4" square ballisters & newel posts. replace exterior wooden staircase & match (e) treads & risers. waterproof stairway t&g landing.Details
remove (e) metal handrail on entire staircase - street to main entry & replace w/ 1-3/4" square ballisters & newel posts. replace exterior wooden staircase & match (e) treads & risers. waterproof stairway t&g landing. | $21,000 |