Marcos Leon Construction,Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to May 2019
- Last 24 months
- 0 permits filed
46 permits since 2000: 28 completed, 12 never finaled, 6 expired or cancelled.
Of the 12 never-finaled permits, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 expired or cancelled. Typically 23 days from filing to permit and 809 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2016 | Completed final sign-off Feb 2017 | 133 Putnam St | kitchen and bathroom remodel; new rear deck and stairs. see plansDetails
kitchen and bathroom remodel; new rear deck and stairs. see plans | $110,000 |
| Sep 7, 2016 | Completed final sign-off Jun 2021 | 63 Stoneyford Av | horizontal addition of two bedrooms at 1st level,add'l living spaces at 2nd level, new connecting stair, existing ground level rooms to be reconfigured on a new slab, new deck to be built on roof of the new 1st level with access from second level.Details
horizontal addition of two bedrooms at 1st level,add'l living spaces at 2nd level, new connecting stair, existing ground level rooms to be reconfigured on a new slab, new deck to be built on roof of the new 1st level with access from second level. | $175,000 |
| Jun 8, 2016 | Expired or cancelled suspend May 2017 | 617 Gennessee St | replace damaged ledger/beam/joists, deck material from wood to composite, widen (e) opening below deck to 3'& add door, add (n) door on same axis as basement opening. front stairs: replace dryrot wood handrail w/exterior grade wood, widen stairs, relocate electrical panelDetails
replace damaged ledger/beam/joists, deck material from wood to composite, widen (e) opening below deck to 3'& add door, add (n) door on same axis as basement opening. front stairs: replace dryrot wood handrail w/exterior grade wood, widen stairs, relocate electrical panel | $20,000 |