Back to kitchen remodel contractors
Marcos Leon Construction,Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to May 2019
- Last 24 months
- 0 permits filed
46 permits since 2000: 28 completed, 12 never finaled, 6 expired or cancelled.
Of the 12 never-finaled permits, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2019 | Completed final sign-off Feb 2022 | 288 Union St | unti 1: kitchen and bathroom remodel. kitchen: 128 sqft. bathroom: 84 sqft. kitchen: demo amd replace all cabinets. replace electrical range to gas. add (4) outlets. replace sink and faucet. bathroom: demolish bathtub and replace with shower only. new shower pan.Details
unti 1: kitchen and bathroom remodel. kitchen: 128 sqft. bathroom: 84 sqft. kitchen: demo amd replace all cabinets. replace electrical range to gas. add (4) outlets. replace sink and faucet. bathroom: demolish bathtub and replace with shower only. new shower pan. | $15,000 |
| Jun 2, 2017 | Completed final sign-off Dec 2017 | 554 Rockdale Dr | (title 24 for newly installed windows permit 201704214516, roof 201701308177) new plumbing, elec, hvac, refinish floors, remodel e bath and kitchen. gr fl: convert multi use rm to large mster bdrm, walk in closet. new w/d closet, new sw bdrm w closet, n furn and wh closet, 1/2 bath to full, n closetDetails
(title 24 for newly installed windows permit 201704214516, roof 201701308177) new plumbing, elec, hvac, refinish floors, remodel e bath and kitchen. gr fl: convert multi use rm to large mster bdrm, walk in closet. new w/d closet, new sw bdrm w closet, n furn and wh closet, 1/2 bath to full, n closet | $120,000 |
| Nov 29, 2016 | Completed final sign-off May 2020 | 551 37th Av | add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam,Details
add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam, | $275,000 |
| Oct 31, 2016 | Completed final sign-off Feb 2017 | 133 Putnam St | kitchen and bathroom remodel; new rear deck and stairs. see plansDetails
kitchen and bathroom remodel; new rear deck and stairs. see plans | $110,000 |
| Sep 22, 2016 | Completed final sign-off May 2020 | 551 37th Av | kitchen & bathroom remodel: replace cabinets, sheet rock, counter tops, flooring, tile toilet tub & sink, electrical bring up to code, plumbing: p traps & hook up sink/ toilet tub faucet. no walls to be altered.Details
kitchen & bathroom remodel: replace cabinets, sheet rock, counter tops, flooring, tile toilet tub & sink, electrical bring up to code, plumbing: p traps & hook up sink/ toilet tub faucet. no walls to be altered. | $25,000 |
| Aug 20, 2015 | Completed final sign-off Mar 2016 | 447 Laidley St | kitchen & bath remodel-demo kitchens & bath to stud-upgrade plumbing & electrical to code(title 24). replace all plumbing fixitures, toilet, tub, & sinks(2). new cabinets & countertops(tile). replace 3 windows; 2 at back and 1 at front. front window(existing aluminum), to be replaced with wood clad.Details
kitchen & bath remodel-demo kitchens & bath to stud-upgrade plumbing & electrical to code(title 24). replace all plumbing fixitures, toilet, tub, & sinks(2). new cabinets & countertops(tile). replace 3 windows; 2 at back and 1 at front. front window(existing aluminum), to be replaced with wood clad. | $45,000 |
| Jul 22, 2015 | Completed final sign-off Nov 2015 | 1077 Natoma St | unit 6 - remodel kitchen and bath - partial opening at non-bearing for kitchen counter; to comply with cec150.0(k)3 & 5Details
unit 6 - remodel kitchen and bath - partial opening at non-bearing for kitchen counter; to comply with cec150.0(k)3 & 5 | $52,000 |
| Apr 17, 2015 | Completed final sign-off Dec 2015 | 3036 Webster St | lower unit: kitchen & bath remodel. kithcen - new cabinets & floors, upgrade ele, new drywall. remove non-bearing wall. bath - remove (e) bathtub, replace with shower, move plumbing for toilet & shower. upgrade elect throughout entire apt.Details
lower unit: kitchen & bath remodel. kithcen - new cabinets & floors, upgrade ele, new drywall. remove non-bearing wall. bath - remove (e) bathtub, replace with shower, move plumbing for toilet & shower. upgrade elect throughout entire apt. | $50,000 |