Back to kitchen remodel contractors
Maksim Korzhenkov
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Sep 2026
- Last 24 months
- 3 permits filed
35 permits since 2000: 28 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 in progress. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2024 | In progress issued Sep 2024 | 2033 Turk Bl | correct all complaints# 202427872, 202424479: repair weatherproofing on stucco (front) and siding (back). kitchen and bathroom cabinets repair. floor repair (carpet) in kind.Details
correct all complaints# 202427872, 202424479: repair weatherproofing on stucco (front) and siding (back). kitchen and bathroom cabinets repair. floor repair (carpet) in kind. | $500 |
| Sep 9, 2022 | Completed final sign-off Feb 2023 | 494 27th Av | unit 2: kitchen remodel in kind. not moving any walls.Details
unit 2: kitchen remodel in kind. not moving any walls. | $8,000 |
| Jul 8, 2022 | Completed final sign-off Oct 2022 | 494 27th Av | kitchen remodeling unit's 38 and 55. remodel in kind.Details
kitchen remodeling unit's 38 and 55. remodel in kind. | $20,000 |
| Oct 21, 2021 | Completed final sign-off Jul 2023 | 527 03rd Av | 4 bathroom remodeling in kind, 2 kitchen remodeling in kind: no wall layout changesDetails
4 bathroom remodeling in kind, 2 kitchen remodeling in kind: no wall layout changes | $80,000 |
| Oct 19, 2021 | Completed final sign-off Jun 2022 | 195 Precita Av | remodel (2) two kitchensDetails
remodel (2) two kitchens | $20,000 |
| Oct 19, 2021 | Completed final sign-off May 2022 | 1678 35th Av | remodel two bathrooms and kitchen. new toilet, vanity, bath tube, new kitchen. no structrual workDetails
remodel two bathrooms and kitchen. new toilet, vanity, bath tube, new kitchen. no structrual work | $30,000 |
| Mar 29, 2018 | Completed final sign-off Jun 2018 | 494 27th Av | kitchen & bathroom remodel at apt#47, electric upgrade, 4 windows replacement not facing street in same size & location.Details
kitchen & bathroom remodel at apt#47, electric upgrade, 4 windows replacement not facing street in same size & location. | $37,000 |
| Jul 28, 2017 | Completed final sign-off Nov 2017 | 494 27th Av | unit 24: full electrical upgrade, kitchen & bathroom remodel; replacement of 4 windows, 3 on facade, double-hung aluminum wood clad. no other workDetails
unit 24: full electrical upgrade, kitchen & bathroom remodel; replacement of 4 windows, 3 on facade, double-hung aluminum wood clad. no other work | $15,000 |
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 780 Guerrero St | apartment's 4,7,8: (3) bathroom remodel, (3) kitchen remodel, new electricalDetails
apartment's 4,7,8: (3) bathroom remodel, (3) kitchen remodel, new electrical | $45,000 |
| Apr 13, 2017 | Completed final sign-off Jun 2017 | 494 27th Av | unit 21: bathroom & kitchen remodel, upgrade electrical panel, bathroom window replacement.Details
unit 21: bathroom & kitchen remodel, upgrade electrical panel, bathroom window replacement. | $15,000 |
| Mar 16, 2016 | Completed final sign-off Jun 2016 | 7555 Geary Bl | apt 303: kitchen remodeling; electric panel upgrade.Details
apt 303: kitchen remodeling; electric panel upgrade. | $10,000 |
| Feb 11, 2016 | Completed final sign-off Mar 2019 | 715 22nd Av | second story remodel of kitchen, dining, living room, and bathroom.Details
second story remodel of kitchen, dining, living room, and bathroom. | $50,000 |
| Aug 16, 2013 | Completed final sign-off Dec 2013 | 7555 Geary Bl | #103: kitchen relocation, electric panel upgrade, partly rewiring, new walls, convert studio into 1 bdr apt.Details
#103: kitchen relocation, electric panel upgrade, partly rewiring, new walls, convert studio into 1 bdr apt. | $18,000 |