Block 1458, lot 023
494 27th Ave
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 5
- Units
- 41
- Rooms
- 36 bedrooms, 41 bathrooms
- Building
- 27,900 sq ft
- Lot
- 6,000 sq ft
- Zoning
- NC3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 14, 2025 | Completed final sign-off Mar 2025 | 494 27th Av | San Francisco Fire Protection | upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1 | $56,800 |
| Sep 9, 2022 | Completed final sign-off Feb 2023 | 494 27th Av | Maksim Korzhenkov | unit 2: kitchen remodel in kind. not moving any walls.Details
unit 2: kitchen remodel in kind. not moving any walls. | $8,000 |
| Jul 8, 2022 | Completed final sign-off Oct 2022 | 494 27th Av | Maksim Korzhenkov | kitchen remodeling unit's 38 and 55. remodel in kind.Details
kitchen remodeling unit's 38 and 55. remodel in kind. | $20,000 |
| Sep 3, 2021 | Completed final sign-off Nov 2021 | 494 27th Av | City Construction Group | unit #23 kitchen remodelingDetails
unit #23 kitchen remodeling | $8,500 |
| Dec 5, 2018 | Completed final sign-off Mar 2019 | 6260 Geary Bl | Brachi Construction, Yao Star Construction | minor tenant improvement: replace 2 new shampoo sinks, upgrade new electrical panel for the workshop. replace new tile floor. replace new toiliet. replace in-kind & same location. no walls or layout modifications.Details
minor tenant improvement: replace 2 new shampoo sinks, upgrade new electrical panel for the workshop. replace new tile floor. replace new toiliet. replace in-kind & same location. no walls or layout modifications. | $5,000 |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 494 27th Av | street spaceDetails
street space | ||
| Mar 29, 2018 | Completed final sign-off Jun 2018 | 494 27th Av | Maksim Korzhenkov | kitchen & bathroom remodel at apt#47, electric upgrade, 4 windows replacement not facing street in same size & location.Details
kitchen & bathroom remodel at apt#47, electric upgrade, 4 windows replacement not facing street in same size & location. | $37,000 |
| Sep 29, 2017 | Completed final sign-off Jan 2018 | 494 27th Av | Maksim Korzhenkov | unit #33: 11 windows replacement; same size same locaiton. aluminum wood clad, double hung, in kind, visible to street. u=0.32maxDetails
unit #33: 11 windows replacement; same size same locaiton. aluminum wood clad, double hung, in kind, visible to street. u=0.32max | $4,000 |
| Jul 28, 2017 | Completed final sign-off Nov 2017 | 494 27th Av | Maksim Korzhenkov | unit 24: full electrical upgrade, kitchen & bathroom remodel; replacement of 4 windows, 3 on facade, double-hung aluminum wood clad. no other workDetails
unit 24: full electrical upgrade, kitchen & bathroom remodel; replacement of 4 windows, 3 on facade, double-hung aluminum wood clad. no other work | $15,000 |
| May 5, 2017 | Completed final sign-off Jul 2017 | 494 27th Av | Maksim Korzhenkov | apt 37: bathroom remodeling, electrical panel upgrade, 5 windows replacement.no facing street.Details
apt 37: bathroom remodeling, electrical panel upgrade, 5 windows replacement.no facing street. | $9,000 |
| Apr 13, 2017 | Completed final sign-off Jun 2017 | 494 27th Av | Maksim Korzhenkov | unit 21: bathroom & kitchen remodel, upgrade electrical panel, bathroom window replacement.Details
unit 21: bathroom & kitchen remodel, upgrade electrical panel, bathroom window replacement. | $15,000 |
| Feb 8, 2017 | Completed final sign-off Mar 2017 | 494 27th Av | unit#42 existing kitchen remodel. no change in walls.Details
unit#42 existing kitchen remodel. no change in walls. | $12,000 | |
| Jun 16, 2016 | Completed final sign-off Feb 2017 | 494 27th Av | L T Energy Construction Solutions Inc | demo storage area downstairs and install new door.Details
demo storage area downstairs and install new door. | $1,000 |
| Jun 29, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | Eichler Solutions, Inc Dba Window Magic | kitchen and bath remodeling. replace tile in bathroom. windows replacement all windows aluminum sh with wood clad max. u factor .58 rshgc .41. 4 total windows.Details
kitchen and bath remodeling. replace tile in bathroom. windows replacement all windows aluminum sh with wood clad max. u factor .58 rshgc .41. 4 total windows. | $6,000 |
| Jun 24, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | Eichler Solutions, Inc Dba Window Magic | unit 57: windows replacment, update electrical in kitchen & bathroom area. add cabinets in kitchen (not a full kitchen remodel). all windows aluminium single hung with wood clad, max u-factor 0.58 or better.Details
unit 57: windows replacment, update electrical in kitchen & bathroom area. add cabinets in kitchen (not a full kitchen remodel). all windows aluminium single hung with wood clad, max u-factor 0.58 or better. | $4,000 |
| Jun 24, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | Eichler Solutions, Inc Dba Window Magic | unit 45: windows replacment, update electrical in kitchen & bathroom area. add cabinets in kitchen (not a full kitchen remodel). all windows aluminium single hung with wood clad, max u-factor 0.58 or better.Details
unit 45: windows replacment, update electrical in kitchen & bathroom area. add cabinets in kitchen (not a full kitchen remodel). all windows aluminium single hung with wood clad, max u-factor 0.58 or better. | $4,000 |
| Jun 24, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | Eichler Solutions, Inc Dba Window Magic | unit 4: windows replacment, update electrical in kitchen & bathroom area. add cabinets in kitchen (not a full kitchen remodel). all windows aluminium single hung with wood clad, max u-factor 0.58 or better.Details
unit 4: windows replacment, update electrical in kitchen & bathroom area. add cabinets in kitchen (not a full kitchen remodel). all windows aluminium single hung with wood clad, max u-factor 0.58 or better. | $2,000 |
| Jun 24, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | Eichler Solutions, Inc Dba Window Magic | unit 35: windows replacment, update electrical in kitchen & bathroom area. add cabinets in kitchen (not a full kitchen remodel). all windows aluminium single hung with wood clad, max u-factor 0.58 or better.Details
unit 35: windows replacment, update electrical in kitchen & bathroom area. add cabinets in kitchen (not a full kitchen remodel). all windows aluminium single hung with wood clad, max u-factor 0.58 or better. | $4,000 |
| Mar 24, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | Eichler Solutions, Inc Dba Window Magic | kithen remodeling - electrical work. everything in same locationDetails
kithen remodeling - electrical work. everything in same location | $6,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | Eichler Solutions, Inc Dba Window Magic, Alfa Building Solutions Inc | window replacement of 33 (e) aluminum windows. all visible facades with single-hung wood-clad milguard windows and vinyl on non-visible side of lightwell.Details
window replacement of 33 (e) aluminum windows. all visible facades with single-hung wood-clad milguard windows and vinyl on non-visible side of lightwell. | $16,500 |
| Jan 29, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | L T Energy Construction Solutions Inc | kitchen and bathroom remodel, change tile, surface and bathroom walls around tub. no walls to be removed/no structural. finishes only. call districk inspector prior to start work.Details
kitchen and bathroom remodel, change tile, surface and bathroom walls around tub. no walls to be removed/no structural. finishes only. call districk inspector prior to start work. | $2,500 |
| Jan 27, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | L T Energy Construction Solutions Inc | replace garage door in kind to abate complaint # 201519933Details
replace garage door in kind to abate complaint # 201519933 | $1,000 |
| Jan 15, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | L T Energy Construction Solutions Inc | unit#3 remove & install new kitchen cabinets.Details
unit#3 remove & install new kitchen cabinets. | $9,000 |
| Jan 12, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | L T Energy Construction Solutions Inc | unit 1 - bathroom remodel; and kitchen remodel. to comply with cec150.0(k)5Details
unit 1 - bathroom remodel; and kitchen remodel. to comply with cec150.0(k)5 | $2,000 |
| Jan 12, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | L T Energy Construction Solutions Inc | unit 58- install kitchen cabinets and countertop; install new vanity cabinets; to comply with cec150.0(k)5Details
unit 58- install kitchen cabinets and countertop; install new vanity cabinets; to comply with cec150.0(k)5 | $2,000 |
| Jan 6, 2015 | Expired or cancelled cancelled Jan 2015 | 494 27th Av | L T Energy Construction Solutions Inc | apt #1: kitchen remodeling. no structural work. remove kitchen cabinets. install new cabinets, install new counter.Details
apt #1: kitchen remodeling. no structural work. remove kitchen cabinets. install new cabinets, install new counter. | $10,000 |
| Oct 12, 2010 | Never finaled issued Oct 2010, no final | 494 27th Av | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Oct 9, 2008 | Completed final sign-off Jan 2009 | 494 27th Av | Sassoon Construction | work on apt#33 & #43. remodel kitchen and bathroom to (2 )apartments. no structural work. 50% of wattage of kitchen lighting to be fluorescent bathroom to be fluorescent or on occupany sensor.Details
work on apt#33 & #43. remodel kitchen and bathroom to (2 )apartments. no structural work. 50% of wattage of kitchen lighting to be fluorescent bathroom to be fluorescent or on occupany sensor. | $30,000 |
| Jul 18, 2007 | Completed final sign-off Sep 2007 | 494 27th Av | Sassoon Construction | tile kitchen floors and change cabinets. tile bathroom and change plumbing fixturesDetails
tile kitchen floors and change cabinets. tile bathroom and change plumbing fixtures | $16,000 |
| Jun 26, 2007 | Completed final sign-off Sep 2007 | 494 27th Av | Sassoon Construction | work in unit#57. remodel kitchen and bathroom. lighting to be 50% fluorescent.Details
work in unit#57. remodel kitchen and bathroom. lighting to be 50% fluorescent. | $18,000 |
| Jun 29, 2006 | Expired or cancelled cancelled Jan 2008 | 6242 Geary Bl | installation of two microcell antennas on the penthouse roof wall with the associated equipment cabinet located at the basement.Details
installation of two microcell antennas on the penthouse roof wall with the associated equipment cabinet located at the basement. | $60,000 | |
| Feb 28, 2006 | Never finaled issued Feb 2006, no final | 494 27th Av | street spaceDetails
street space | ||
| Mar 29, 2000 | Expired or cancelled expired Jul 2000 | 6242 Geary Bl | painted wall signDetails
painted wall sign | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Eichler Solutions, Inc Dba Window Magic (7), L T Energy Construction Solutions Inc (7), Maksim Korzhenkov (7), Sassoon Construction (3), Alfa Building Solutions Inc, Brachi Construction, City Construction Group, San Francisco Fire Protection, Yao Star Construction
- Designers
- Terry Yow
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.