Back to bathroom remodel contractors
Maksim Korzhenkov
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Sep 2026
- Last 24 months
- 3 permits filed
35 permits since 2000: 28 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 14 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2024 | In progress issued Sep 2024 | 2033 Turk Bl | correct all complaints# 202427872, 202424479: repair weatherproofing on stucco (front) and siding (back). kitchen and bathroom cabinets repair. floor repair (carpet) in kind.Details
correct all complaints# 202427872, 202424479: repair weatherproofing on stucco (front) and siding (back). kitchen and bathroom cabinets repair. floor repair (carpet) in kind. | $500 |
| Aug 21, 2023 | Completed final sign-off Nov 2023 | 2159 32nd Av | bath remodel in kind, replace 8 doors, 2 windows on back of house. replace cabinets and 2 burning hot plate, no work on upper floorDetails
bath remodel in kind, replace 8 doors, 2 windows on back of house. replace cabinets and 2 burning hot plate, no work on upper floor | $10,000 |
| Jun 29, 2023 | Never finaled issued Jul 2023, no final | 2178 26th Av | proposed 2 bed rooms & 2 bath rooms at 1 fl. new concrete slab in the basement.Details
proposed 2 bed rooms & 2 bath rooms at 1 fl. new concrete slab in the basement. | $120,000 |
| Oct 21, 2021 | Completed final sign-off Jul 2023 | 527 03rd Av | 4 bathroom remodeling in kind, 2 kitchen remodeling in kind: no wall layout changesDetails
4 bathroom remodeling in kind, 2 kitchen remodeling in kind: no wall layout changes | $80,000 |
| Oct 19, 2021 | Completed final sign-off May 2022 | 1678 35th Av | remodel two bathrooms and kitchen. new toilet, vanity, bath tube, new kitchen. no structrual workDetails
remodel two bathrooms and kitchen. new toilet, vanity, bath tube, new kitchen. no structrual work | $30,000 |
| Dec 11, 2018 | Completed final sign-off Nov 2019 | 5177 Diamond Heights Bl | bathroom full remodeling, same layout. 40 sq ft.Details
bathroom full remodeling, same layout. 40 sq ft. | $6,000 |
| Apr 25, 2018 | Completed final sign-off Oct 2018 | 2770 19th Av | two bathroom remodel. no alterration of wall, window and door.Details
two bathroom remodel. no alterration of wall, window and door. | $15,000 |
| Mar 29, 2018 | Completed final sign-off Jun 2018 | 494 27th Av | kitchen & bathroom remodel at apt#47, electric upgrade, 4 windows replacement not facing street in same size & location.Details
kitchen & bathroom remodel at apt#47, electric upgrade, 4 windows replacement not facing street in same size & location. | $37,000 |
| Jul 28, 2017 | Completed final sign-off Nov 2017 | 494 27th Av | unit 24: full electrical upgrade, kitchen & bathroom remodel; replacement of 4 windows, 3 on facade, double-hung aluminum wood clad. no other workDetails
unit 24: full electrical upgrade, kitchen & bathroom remodel; replacement of 4 windows, 3 on facade, double-hung aluminum wood clad. no other work | $15,000 |
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 780 Guerrero St | apartment's 4,7,8: (3) bathroom remodel, (3) kitchen remodel, new electricalDetails
apartment's 4,7,8: (3) bathroom remodel, (3) kitchen remodel, new electrical | $45,000 |
| May 5, 2017 | Completed final sign-off Jul 2017 | 494 27th Av | apt 37: bathroom remodeling, electrical panel upgrade, 5 windows replacement.no facing street.Details
apt 37: bathroom remodeling, electrical panel upgrade, 5 windows replacement.no facing street. | $9,000 |
| Apr 13, 2017 | Completed final sign-off Jun 2017 | 494 27th Av | unit 21: bathroom & kitchen remodel, upgrade electrical panel, bathroom window replacement.Details
unit 21: bathroom & kitchen remodel, upgrade electrical panel, bathroom window replacement. | $15,000 |
| May 9, 2016 | Completed final sign-off Dec 2020 | 423 10th Av | change use at 1st floor level from residential garage to religious institution, within rh-2 district, place small pool within new 12'x25' single story addition to rear of house, deck above addition.new bath next to pool rev. to pa# 201512024023Details
change use at 1st floor level from residential garage to religious institution, within rh-2 district, place small pool within new 12'x25' single story addition to rear of house, deck above addition.new bath next to pool rev. to pa# 201512024023 | $80,000 |
| Apr 27, 2016 | Completed final sign-off Nov 2016 | 68 Broadmoor Dr | two bathrooms remodeling, no wall & opening layout change, high efficacy lighting or controlled by manual-on sensor with high efficacy main light.Details
two bathrooms remodeling, no wall & opening layout change, high efficacy lighting or controlled by manual-on sensor with high efficacy main light. | $20,000 |
| Feb 11, 2016 | Completed final sign-off Mar 2019 | 715 22nd Av | second story remodel of kitchen, dining, living room, and bathroom.Details
second story remodel of kitchen, dining, living room, and bathroom. | $50,000 |
| Jan 22, 2014 | Completed final sign-off Apr 2014 | 2090 Great Hy | 1 bathroom remodel in unit 106Details
1 bathroom remodel in unit 106 | $4,000 |