Lyons Building & Associates Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Jan 2025
- Last 24 months
- 1 permit filed
64 permits since 2000: 49 completed, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 6 completed, 1 never finaled, 2 expired or cancelled. Typically 33 days from filing to permit and 528 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 23, 2023 | Completed final sign-off Jan 2025 | 395 Collingwood St | revision to 202111162548 & 202207067796: demo & replace areas of dryrot in siding & front porch/stairs. replace fireplace chimney, replace remaining windows in (e) opening. add additional rigid insulation in rafter bays & new batt insulation to all uninsulated exterior walls. replace (e) interirDetails
revision to 202111162548 & 202207067796: demo & replace areas of dryrot in siding & front porch/stairs. replace fireplace chimney, replace remaining windows in (e) opening. add additional rigid insulation in rafter bays & new batt insulation to all uninsulated exterior walls. replace (e) interir | $20,000 |
| Aug 12, 2022 | Expired or cancelled expired Jan 2025 | 2566 Vallejo St | revisions to bpa#202110059827. omit footing from plan, reframe bearing wall/steps, revise framing @ 2/f, revise new stair configuiration @ 3/f, strengthen roof framing/gable & flat sections. correct the story and basement count as 4 story 0 basement.Details
revisions to bpa#202110059827. omit footing from plan, reframe bearing wall/steps, revise framing @ 2/f, revise new stair configuiration @ 3/f, strengthen roof framing/gable & flat sections. correct the story and basement count as 4 story 0 basement. | $10,000 |
| Aug 10, 2021 | Completed final sign-off Jan 2025 | 2566 Vallejo St | remodel and improved exiting. relocate laundry and remodel bedroom at gr fl. remove interior winding stair and replace with code compliant stair. replace roof access stair. remove e fire escape and replace with single jomy ladder. replace railings windscreen and decking at 3rd flDetails
remodel and improved exiting. relocate laundry and remodel bedroom at gr fl. remove interior winding stair and replace with code compliant stair. replace roof access stair. remove e fire escape and replace with single jomy ladder. replace railings windscreen and decking at 3rd fl | $187,000 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 200 Topeka Av | convert storage space @ 1st floor to family room & bath. remodel kitchen & construct (n) stairs to 1st & 2nd floors @ mid level.Details
convert storage space @ 1st floor to family room & bath. remodel kitchen & construct (n) stairs to 1st & 2nd floors @ mid level. | $52,000 |
| Nov 4, 2015 | Completed final sign-off Dec 2016 | 790 Funston Av | removing & replacing exterior stairs at rear yard, new fences at rear & side years. remodel (e) powder room & (e) bathroom, replace 2 windowsDetails
removing & replacing exterior stairs at rear yard, new fences at rear & side years. remodel (e) powder room & (e) bathroom, replace 2 windows | $50,000 |
| May 28, 2015 | Completed final sign-off Feb 2021 | 1629 Taylor St | replace existing handrail/guardrail in kind to meet current code req. replace existing fence/gate in kind. replace existing stairs and paving in kindDetails
replace existing handrail/guardrail in kind to meet current code req. replace existing fence/gate in kind. replace existing stairs and paving in kind | $60,000 |
| Nov 16, 2010 | Completed final sign-off Jul 2013 | 31 Valley St | remodel 2 story duplex to 4 story duplex. vertical & horizontal. replace metal & conc. entry stairs with new staircase. unit "31" to include living room, dining room, kitchen, 3 bedrooms, 3 baths. unit "33" to include: living room, dining room, kitchen, family room, 4 bedroom, 3 baths.Details
remodel 2 story duplex to 4 story duplex. vertical & horizontal. replace metal & conc. entry stairs with new staircase. unit "31" to include living room, dining room, kitchen, 3 bedrooms, 3 baths. unit "33" to include: living room, dining room, kitchen, family room, 4 bedroom, 3 baths. | $300,000 |
| Jun 17, 2008 | Completed final sign-off Jan 2009 | 161 Castro St | extend stairs @ front of build to roof, const stair to penthouse @ roof, extend guardrail fr penthouse to (e) roof deck.Details
extend stairs @ front of build to roof, const stair to penthouse @ roof, extend guardrail fr penthouse to (e) roof deck. | $4,500 |
| Jan 17, 2007 | Expired or cancelled expired Feb 2008 | 2527 Washington St | replacement of (e) threads, risers, stringers, balusters and handrails at exterior main entry stairs. (e) newel posts to be salnaged + replaced new wood balusters (beeriono cb5) with simular handrail (beriono friob)Details
replacement of (e) threads, risers, stringers, balusters and handrails at exterior main entry stairs. (e) newel posts to be salnaged + replaced new wood balusters (beeriono cb5) with simular handrail (beriono friob) | $13,000 |