Back to kitchen remodel contractors
Lyons Building & Associates Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Jan 2025
- Last 24 months
- 1 permit filed
64 permits since 2000: 49 completed, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 14 completed, 1 never finaled, 2 expired or cancelled. Typically 3 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2022 | Completed final sign-off Jan 2025 | 395 Collingwood St | revision to approved pa 20211162548 as follows. on first floor install (n) wood floors and replace (e) garage door in kind. on 2nd floor, kitchen remodel (fixtures, appliances and casework. update fixtures and cabs in (e) bathroom. replace entry gate and entry door. on 3rd floor, replace bathroomDetails
revision to approved pa 20211162548 as follows. on first floor install (n) wood floors and replace (e) garage door in kind. on 2nd floor, kitchen remodel (fixtures, appliances and casework. update fixtures and cabs in (e) bathroom. replace entry gate and entry door. on 3rd floor, replace bathroom | $37,870 |
| Nov 16, 2021 | Completed final sign-off Jan 2025 | 395 Collingwood St | 2nd/f: kitchen cosmetic remodel of replacing appliances. fixtures and finishes. reconfiguration of (e) bathroom layout and updating fixture and finishes, new closet/caseworok at (e) bath. 3rd/f: new closet recofifurarion/casework @ primary bedroom, replacing (e) bathroom fixtures and finishes.Details
2nd/f: kitchen cosmetic remodel of replacing appliances. fixtures and finishes. reconfiguration of (e) bathroom layout and updating fixture and finishes, new closet/caseworok at (e) bath. 3rd/f: new closet recofifurarion/casework @ primary bedroom, replacing (e) bathroom fixtures and finishes. | $65,238 |
| Dec 22, 2020 | Completed final sign-off Sep 2021 | 1549 Lombard St | unit 3: restore unit to original condition due to flood damage. partial repair of drywall, hardwood floors, kitchen cabinets. all work in kindDetails
unit 3: restore unit to original condition due to flood damage. partial repair of drywall, hardwood floors, kitchen cabinets. all work in kind | $35,000 |
| Dec 22, 2020 | Completed final sign-off Sep 2021 | 1549 Lombard St | restore unit to original condition due to flood damage. partial repair of drywall. hardwood floor, kitchen cabinets, all work in kind.Details
restore unit to original condition due to flood damage. partial repair of drywall. hardwood floor, kitchen cabinets, all work in kind. | $35,000 |
| Dec 22, 2020 | Completed final sign-off Sep 2021 | 1549 Lombard St | unit 1: restore unit to original condition due to flood damage. partial repair of drywall, hardwood floor, kitchen cabinets. all work in kind.Details
unit 1: restore unit to original condition due to flood damage. partial repair of drywall, hardwood floor, kitchen cabinets. all work in kind. | $35,000 |
| Nov 13, 2020 | Completed final sign-off Sep 2022 | 2541 Washington St | 2/f: remodel of kitchen & bar; 3/f: remodel of laundry & office/den. mep permitted seperately.Details
2/f: remodel of kitchen & bar; 3/f: remodel of laundry & office/den. mep permitted seperately. | $85,000 |
| May 13, 2020 | Completed final sign-off Apr 2021 | 2541 Washington St | 1st flr - repairs due to flood damage. remodel kitchen and bathroom.Details
1st flr - repairs due to flood damage. remodel kitchen and bathroom. | $50,000 |
| Oct 4, 2019 | Expired or cancelled expired Nov 2022 | 2123 Franklin St | remodel of existing kitchen & adjacent bathroon in kindDetails
remodel of existing kitchen & adjacent bathroon in kind | $25,000 |
| Apr 2, 2019 | Completed final sign-off Sep 2020 | 200 Brannan St | #501: interior remodel and reconfiguration of e kitchen remodel of 4 baths to include new fixtures and fixtures, replacement of 2 e gas fireplances and replacement of hardwood floors no structural workDetails
#501: interior remodel and reconfiguration of e kitchen remodel of 4 baths to include new fixtures and fixtures, replacement of 2 e gas fireplances and replacement of hardwood floors no structural work | $120,000 |
| Mar 21, 2019 | Completed final sign-off Apr 2021 | 111 Terrace Dr | interior remodel of (e) kitchen, fam room & dining to incl opening up wall between kitchen & dining. add media room at basement level. exterior work to incl replacement of (e) doors / windows at rear and west side of buildingDetails
interior remodel of (e) kitchen, fam room & dining to incl opening up wall between kitchen & dining. add media room at basement level. exterior work to incl replacement of (e) doors / windows at rear and west side of building | $350,000 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 200 Topeka Av | convert storage space @ 1st floor to family room & bath. remodel kitchen & construct (n) stairs to 1st & 2nd floors @ mid level.Details
convert storage space @ 1st floor to family room & bath. remodel kitchen & construct (n) stairs to 1st & 2nd floors @ mid level. | $52,000 |
| Feb 3, 2015 | Completed final sign-off Jun 2015 | 2548 Washington St | remodel of kitchen, new cabinetry, floor, pantry, window & doors. n/a ordinance #155-13Details
remodel of kitchen, new cabinetry, floor, pantry, window & doors. n/a ordinance #155-13 | $30,000 |
| Jun 23, 2014 | Completed final sign-off Oct 2014 | 2623 17th Av | remodel kitchen and bathroom in kind. no structural work.Details
remodel kitchen and bathroom in kind. no structural work. | $15,000 |
| Oct 5, 2012 | Completed final sign-off Jul 2013 | 31 Valley St | revision to 201011164997: basement divide (e) unit: 1st flr convert attic area to mech loft, convert unit a (2 bd,2bath) to unit b (1bd,1bath laundry); 2nd flr reconfigure kitchen/bath area,repl glass deck guardrail w/ wall with wood siding; 3rd flr reconfigure master bath/closet area, delete laundrDetails
revision to 201011164997: basement divide (e) unit: 1st flr convert attic area to mech loft, convert unit a (2 bd,2bath) to unit b (1bd,1bath laundry); 2nd flr reconfigure kitchen/bath area,repl glass deck guardrail w/ wall with wood siding; 3rd flr reconfigure master bath/closet area, delete laundr | $10,000 |
| Nov 16, 2010 | Completed final sign-off Jul 2013 | 31 Valley St | remodel 2 story duplex to 4 story duplex. vertical & horizontal. replace metal & conc. entry stairs with new staircase. unit "31" to include living room, dining room, kitchen, 3 bedrooms, 3 baths. unit "33" to include: living room, dining room, kitchen, family room, 4 bedroom, 3 baths.Details
remodel 2 story duplex to 4 story duplex. vertical & horizontal. replace metal & conc. entry stairs with new staircase. unit "31" to include living room, dining room, kitchen, 3 bedrooms, 3 baths. unit "33" to include: living room, dining room, kitchen, family room, 4 bedroom, 3 baths. | $300,000 |
| Apr 18, 2007 | Expired or cancelled expired Jan 2009 | 161 Castro St | remodel 8 kitchens, 8 bathrooms in kind. windows in kind only in kitchen & bathroom only.Details
remodel 8 kitchens, 8 bathrooms in kind. windows in kind only in kitchen & bathroom only. | $80,000 |
| Dec 4, 2006 | Completed final sign-off Nov 2007 | 208 Lake Merced Hill No | work @ unit# 1e. replacement of kitchen cabinets & appliances in 1 kitchen. (e) lighting to remain. no structural work.Details
work @ unit# 1e. replacement of kitchen cabinets & appliances in 1 kitchen. (e) lighting to remain. no structural work. | $35,000 |