Block 6617, lot 037
31 Valley St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 4
- Units
- 2
- Rooms
- 7 bedrooms, 6 bathrooms
- Building
- 4,702 sq ft
- Lot
- 3,092 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 9, 2012 | Completed final sign-off Jul 2013 | 31 Valley St | Star Plumbing & Fire Const Co. | install new fire sprinkler system per nfpa 13 throughout the bldg include under ground. total 58 heads. underground included, 2" dedicated fire service.Details
install new fire sprinkler system per nfpa 13 throughout the bldg include under ground. total 58 heads. underground included, 2" dedicated fire service. | $30,000 |
| Oct 5, 2012 | Completed final sign-off Jul 2013 | 31 Valley St | Lyons Building & Associates Inc. | revision to 201011164997: basement divide (e) unit: 1st flr convert attic area to mech loft, convert unit a (2 bd,2bath) to unit b (1bd,1bath laundry); 2nd flr reconfigure kitchen/bath area,repl glass deck guardrail w/ wall with wood siding; 3rd flr reconfigure master bath/closet area, delete laundrDetails
revision to 201011164997: basement divide (e) unit: 1st flr convert attic area to mech loft, convert unit a (2 bd,2bath) to unit b (1bd,1bath laundry); 2nd flr reconfigure kitchen/bath area,repl glass deck guardrail w/ wall with wood siding; 3rd flr reconfigure master bath/closet area, delete laundr | $10,000 |
| Nov 16, 2010 | Completed final sign-off Jul 2013 | 31 Valley St | Lyons Building & Associates Inc. | remodel 2 story duplex to 4 story duplex. vertical & horizontal. replace metal & conc. entry stairs with new staircase. unit "31" to include living room, dining room, kitchen, 3 bedrooms, 3 baths. unit "33" to include: living room, dining room, kitchen, family room, 4 bedroom, 3 baths.Details
remodel 2 story duplex to 4 story duplex. vertical & horizontal. replace metal & conc. entry stairs with new staircase. unit "31" to include living room, dining room, kitchen, 3 bedrooms, 3 baths. unit "33" to include: living room, dining room, kitchen, family room, 4 bedroom, 3 baths. | $300,000 |
| Jul 17, 2008 | Completed final sign-off Aug 2008 | 31 Valley St | J G Construction Partnership | scope of work for unit#33: replace (1) window that is facing the back yard (4ft height x 10 ft wide). install new bathroom cabinet (will not touch any plumbing or electrical). scope of work for unit#31: install new kitchen cbinets only (will not touch any plumbing or electrical).Details
scope of work for unit#33: replace (1) window that is facing the back yard (4ft height x 10 ft wide). install new bathroom cabinet (will not touch any plumbing or electrical). scope of work for unit#31: install new kitchen cbinets only (will not touch any plumbing or electrical). | $6,000 |
| Oct 5, 2006 | Completed final sign-off Nov 2006 | 31 Valley St | Bayside Construction | repair lower part of rear stair case & landing. less than 50% of total staircase.Details
repair lower part of rear stair case & landing. less than 50% of total staircase. | $3,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Lyons Building & Associates Inc. (2), Bayside Construction, J G Construction Partnership, Star Plumbing & Fire Const Co.
- Architects
- William Egan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.