Back to bathroom remodel contractors
Lyons Building & Associates Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Jan 2025
- Last 24 months
- 1 permit filed
64 permits since 2000: 49 completed, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 13 completed, 2 never finaled, 3 expired or cancelled. Typically 2 days from filing to permit and 263 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2022 | Never finaled issued Sep 2022, no final | 200 Topeka Av | remodel (e) 2nd fl. bathroom in kindDetails
remodel (e) 2nd fl. bathroom in kind | $3,000 |
| Jul 6, 2022 | Completed final sign-off Jan 2025 | 395 Collingwood St | revision to approved pa 20211162548 as follows. on first floor install (n) wood floors and replace (e) garage door in kind. on 2nd floor, kitchen remodel (fixtures, appliances and casework. update fixtures and cabs in (e) bathroom. replace entry gate and entry door. on 3rd floor, replace bathroomDetails
revision to approved pa 20211162548 as follows. on first floor install (n) wood floors and replace (e) garage door in kind. on 2nd floor, kitchen remodel (fixtures, appliances and casework. update fixtures and cabs in (e) bathroom. replace entry gate and entry door. on 3rd floor, replace bathroom | $37,870 |
| Dec 10, 2021 | Expired or cancelled expired Jan 2025 | 2566 Vallejo St | extend (e) dormer 5'3" north to rear of house. bathroom at 4th fl remodel.Details
extend (e) dormer 5'3" north to rear of house. bathroom at 4th fl remodel. | $15,000 |
| Nov 16, 2021 | Completed final sign-off Jan 2025 | 395 Collingwood St | 2nd/f: kitchen cosmetic remodel of replacing appliances. fixtures and finishes. reconfiguration of (e) bathroom layout and updating fixture and finishes, new closet/caseworok at (e) bath. 3rd/f: new closet recofifurarion/casework @ primary bedroom, replacing (e) bathroom fixtures and finishes.Details
2nd/f: kitchen cosmetic remodel of replacing appliances. fixtures and finishes. reconfiguration of (e) bathroom layout and updating fixture and finishes, new closet/caseworok at (e) bath. 3rd/f: new closet recofifurarion/casework @ primary bedroom, replacing (e) bathroom fixtures and finishes. | $65,238 |
| May 13, 2020 | Completed final sign-off Apr 2021 | 2541 Washington St | 1st flr - repairs due to flood damage. remodel kitchen and bathroom.Details
1st flr - repairs due to flood damage. remodel kitchen and bathroom. | $50,000 |
| Apr 2, 2019 | Completed final sign-off Sep 2020 | 200 Brannan St | #501: interior remodel and reconfiguration of e kitchen remodel of 4 baths to include new fixtures and fixtures, replacement of 2 e gas fireplances and replacement of hardwood floors no structural workDetails
#501: interior remodel and reconfiguration of e kitchen remodel of 4 baths to include new fixtures and fixtures, replacement of 2 e gas fireplances and replacement of hardwood floors no structural work | $120,000 |
| Oct 12, 2018 | Expired or cancelled expired Nov 2022 | 2123 Franklin St | remodel extg bathroom and add new showerDetails
remodel extg bathroom and add new shower | $15,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2018 | 183 Saint Germain Av | master bathroom only: replace (e) sheetrock on walls & flooring; new tile, reinstall fixtures in same location.Details
master bathroom only: replace (e) sheetrock on walls & flooring; new tile, reinstall fixtures in same location. | $6,000 |
| May 9, 2017 | Completed final sign-off Oct 2017 | 4656 18th St | interior remodel of master bath, addition of built in cabinetry in guest bedroomDetails
interior remodel of master bath, addition of built in cabinetry in guest bedroom | $22,000 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 200 Topeka Av | convert storage space @ 1st floor to family room & bath. remodel kitchen & construct (n) stairs to 1st & 2nd floors @ mid level.Details
convert storage space @ 1st floor to family room & bath. remodel kitchen & construct (n) stairs to 1st & 2nd floors @ mid level. | $52,000 |
| Nov 4, 2015 | Completed final sign-off Dec 2016 | 790 Funston Av | removing & replacing exterior stairs at rear yard, new fences at rear & side years. remodel (e) powder room & (e) bathroom, replace 2 windowsDetails
removing & replacing exterior stairs at rear yard, new fences at rear & side years. remodel (e) powder room & (e) bathroom, replace 2 windows | $50,000 |
| Jun 23, 2014 | Completed final sign-off Oct 2014 | 2623 17th Av | remodel kitchen and bathroom in kind. no structural work.Details
remodel kitchen and bathroom in kind. no structural work. | $15,000 |
| Dec 18, 2013 | Completed final sign-off Sep 2014 | 2550 Pierce St | interior remodel of upstairs sitting room. replace windows and doors in 3 locations, rear and side property. remodel bath. new gas fireplace at dining roomDetails
interior remodel of upstairs sitting room. replace windows and doors in 3 locations, rear and side property. remodel bath. new gas fireplace at dining room | $40,000 |
| Oct 5, 2012 | Completed final sign-off Jul 2013 | 31 Valley St | revision to 201011164997: basement divide (e) unit: 1st flr convert attic area to mech loft, convert unit a (2 bd,2bath) to unit b (1bd,1bath laundry); 2nd flr reconfigure kitchen/bath area,repl glass deck guardrail w/ wall with wood siding; 3rd flr reconfigure master bath/closet area, delete laundrDetails
revision to 201011164997: basement divide (e) unit: 1st flr convert attic area to mech loft, convert unit a (2 bd,2bath) to unit b (1bd,1bath laundry); 2nd flr reconfigure kitchen/bath area,repl glass deck guardrail w/ wall with wood siding; 3rd flr reconfigure master bath/closet area, delete laundr | $10,000 |
| Apr 20, 2011 | Completed final sign-off Sep 2014 | 2550 Pierce St | remodel bedroom & bathroom on 1st floor (main level). repair leak at front porchDetails
remodel bedroom & bathroom on 1st floor (main level). repair leak at front porch | $10,000 |
| Nov 16, 2010 | Completed final sign-off Jul 2013 | 31 Valley St | remodel 2 story duplex to 4 story duplex. vertical & horizontal. replace metal & conc. entry stairs with new staircase. unit "31" to include living room, dining room, kitchen, 3 bedrooms, 3 baths. unit "33" to include: living room, dining room, kitchen, family room, 4 bedroom, 3 baths.Details
remodel 2 story duplex to 4 story duplex. vertical & horizontal. replace metal & conc. entry stairs with new staircase. unit "31" to include living room, dining room, kitchen, 3 bedrooms, 3 baths. unit "33" to include: living room, dining room, kitchen, family room, 4 bedroom, 3 baths. | $300,000 |
| Oct 9, 2009 | Completed final sign-off Jan 2010 | 2550 Pierce St | remodel existing bathroom in kind. repair deck membrane on existing rear deckDetails
remodel existing bathroom in kind. repair deck membrane on existing rear deck | $20,000 |
| Apr 18, 2007 | Expired or cancelled expired Jan 2009 | 161 Castro St | remodel 8 kitchens, 8 bathrooms in kind. windows in kind only in kitchen & bathroom only.Details
remodel 8 kitchens, 8 bathrooms in kind. windows in kind only in kitchen & bathroom only. | $80,000 |