Lee & Georgiou Inc. Dba Georgiou Const.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jun 2019
- Last 24 months
- 0 permits filed
32 permits since 2000: 24 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 8 completed, 1 never finaled. Typically 53 days from filing to permit and 448 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2019 | Completed final sign-off Apr 2021 | 2609 Fillmore St | revision to pa #201804055656. remove & replace (e) damage non-conforming front stair w/(n) wood stair, guardrail and newel post akin to (e). remove (e) concrete work in front setback. (n) permeable & planted area in front setback. (n) slopped concrete walkway & security gate at side yard.Details
revision to pa #201804055656. remove & replace (e) damage non-conforming front stair w/(n) wood stair, guardrail and newel post akin to (e). remove (e) concrete work in front setback. (n) permeable & planted area in front setback. (n) slopped concrete walkway & security gate at side yard. | |
| Apr 5, 2018 | Completed final sign-off Apr 2021 | 2609 Fillmore St | renovation of single fam res. remodel of basement to include (n) media rm & installation of (n) int. stairs. remodel of bedrooms & bath at 2nd & 3rd fl. replacement of (e) windows at front facade at 1st fl in kind. install (n) windows at rear & (n) skylight at roof. remodel kitchen at 1st fl.Details
renovation of single fam res. remodel of basement to include (n) media rm & installation of (n) int. stairs. remodel of bedrooms & bath at 2nd & 3rd fl. replacement of (e) windows at front facade at 1st fl in kind. install (n) windows at rear & (n) skylight at roof. remodel kitchen at 1st fl. | $536,500 |
| Jun 26, 2017 | Completed final sign-off Jun 2019 | 367 Liberty St | additional work to pa# 2013/11/20/2349-s1, reconfigure interior layout of unit# 1 , area of unit to remain as previously permitted. remove front exterior access stair to unit# 2, reconfigure entry way to unit# 1 and unit# 2, reconfigure rear yard access steps and patio.Details
additional work to pa# 2013/11/20/2349-s1, reconfigure interior layout of unit# 1 , area of unit to remain as previously permitted. remove front exterior access stair to unit# 2, reconfigure entry way to unit# 1 and unit# 2, reconfigure rear yard access steps and patio. | $1,000 |
| Dec 10, 2015 | Completed final sign-off Dec 2016 | 271 Roosevelt Wy | revision to pa# 2015/03/12/0640. new deck & stair off living room provides access to paved areas in side & rear yards.Details
revision to pa# 2015/03/12/0640. new deck & stair off living room provides access to paved areas in side & rear yards. | $11,000 |
| Oct 9, 2015 | Completed final sign-off Dec 2016 | 271 Roosevelt Wy | revision to pa#201503120640, replace (e) security gate and garage door, resurface (e) front stair and replaster facade.Details
revision to pa#201503120640, replace (e) security gate and garage door, resurface (e) front stair and replaster facade. | $10,000 |
| Aug 28, 2015 | Completed final sign-off May 2019 | 4612 19th St | renovation & complete interior remodel. (n)interior stair, vert/horizontal add @ rear of bldg & (e)garage, replace(e)stair & paved areas @ rear yard. reconfig(e)powder rm,(e)kitchen,(e)living,(e)deck,(e)2-bedroom,(e)bath. add(n)bedrm,(n)bath,(n)terrace. convert(e)sub-basement to(n)bath,(n)rec rmDetails
renovation & complete interior remodel. (n)interior stair, vert/horizontal add @ rear of bldg & (e)garage, replace(e)stair & paved areas @ rear yard. reconfig(e)powder rm,(e)kitchen,(e)living,(e)deck,(e)2-bedroom,(e)bath. add(n)bedrm,(n)bath,(n)terrace. convert(e)sub-basement to(n)bath,(n)rec rm | $543,955 |
| Feb 7, 2014 | Completed final sign-off Aug 2014 | 224 Kirkham St | replace e non conforming enclosed stair at rear. intall one window.Details
replace e non conforming enclosed stair at rear. intall one window. | $12,500 |
| Apr 19, 2013 | Never finaled issued Apr 2013, no final | 231 Randall St | 1. revision to app#2012-0814-7360. 2. remodel bedrooms and kitchen on first floor (unit 1). 3. add interior stair between first and second floor. 4. legalize (e) garage on basement. 5. new rear deck and stair. 6. replace water heater and furnace. 7. replace exterior wood stair in front in kind.Details
1. revision to app#2012-0814-7360. 2. remodel bedrooms and kitchen on first floor (unit 1). 3. add interior stair between first and second floor. 4. legalize (e) garage on basement. 5. new rear deck and stair. 6. replace water heater and furnace. 7. replace exterior wood stair in front in kind. | $60,000 |
| Oct 10, 2012 | Completed final sign-off Jan 2013 | 1861 Scott St | re-roof existing garage roof, repair staircase <50% within bldg, install 7 staircase light fixtures, repair driveway, sidewalk & curb. work in common area.Details
re-roof existing garage roof, repair staircase <50% within bldg, install 7 staircase light fixtures, repair driveway, sidewalk & curb. work in common area. | $10,000 |