Back to bathroom remodel contractors
Lee & Georgiou Inc. Dba Georgiou Const.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jun 2019
- Last 24 months
- 0 permits filed
32 permits since 2000: 24 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 8 days from filing to permit and 558 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 28, 2018 | Completed final sign-off Apr 2021 | 2609 Fillmore St | revision to pa 201804055656. expansion of media rm & (n) structural beam at basement level. (n) windows & exterior door, replacement of skylight at dining rm at 1st floor. reconfiguration of master bathroom & reduction of size of (n) skylight at 3rd flr.Details
revision to pa 201804055656. expansion of media rm & (n) structural beam at basement level. (n) windows & exterior door, replacement of skylight at dining rm at 1st floor. reconfiguration of master bathroom & reduction of size of (n) skylight at 3rd flr. | |
| Apr 5, 2018 | Completed final sign-off Apr 2021 | 2609 Fillmore St | renovation of single fam res. remodel of basement to include (n) media rm & installation of (n) int. stairs. remodel of bedrooms & bath at 2nd & 3rd fl. replacement of (e) windows at front facade at 1st fl in kind. install (n) windows at rear & (n) skylight at roof. remodel kitchen at 1st fl.Details
renovation of single fam res. remodel of basement to include (n) media rm & installation of (n) int. stairs. remodel of bedrooms & bath at 2nd & 3rd fl. replacement of (e) windows at front facade at 1st fl in kind. install (n) windows at rear & (n) skylight at roof. remodel kitchen at 1st fl. | $536,500 |
| Jan 8, 2018 | Completed final sign-off Sep 2018 | 1753 Lyon St | bathroom remodel and replace window in lightwell, 3, not visible from streets, same size locationDetails
bathroom remodel and replace window in lightwell, 3, not visible from streets, same size location | $15,000 |
| Aug 28, 2015 | Completed final sign-off May 2019 | 4612 19th St | renovation & complete interior remodel. (n)interior stair, vert/horizontal add @ rear of bldg & (e)garage, replace(e)stair & paved areas @ rear yard. reconfig(e)powder rm,(e)kitchen,(e)living,(e)deck,(e)2-bedroom,(e)bath. add(n)bedrm,(n)bath,(n)terrace. convert(e)sub-basement to(n)bath,(n)rec rmDetails
renovation & complete interior remodel. (n)interior stair, vert/horizontal add @ rear of bldg & (e)garage, replace(e)stair & paved areas @ rear yard. reconfig(e)powder rm,(e)kitchen,(e)living,(e)deck,(e)2-bedroom,(e)bath. add(n)bedrm,(n)bath,(n)terrace. convert(e)sub-basement to(n)bath,(n)rec rm | $543,955 |
| May 7, 2015 | Completed final sign-off Aug 2015 | 326 Richland Av | bathroom remodel, replace toilet, tub, vanity. replace lighting & fan. no walls to be moved/no structuralDetails
bathroom remodel, replace toilet, tub, vanity. replace lighting & fan. no walls to be moved/no structural | $2,500 |
| Apr 1, 2015 | Completed final sign-off May 2015 | 4612 19th St | move and install new vanity in bathroom only. no walls relocation. update bathroom electrical only. interior paint touched up in various rooms.Details
move and install new vanity in bathroom only. no walls relocation. update bathroom electrical only. interior paint touched up in various rooms. | $2,500 |
| Apr 17, 2014 | Completed final sign-off Oct 2020 | 365 Liberty St | horizontal extension. renovate + expand single family home. new home will have 4 bedrooms, 5 1/2 bath rooms. add fourth level. expand horizontall basement/garage, 1st ,2nd & 3rd floors. add 4th floor (vertical expandsion.)Details
horizontal extension. renovate + expand single family home. new home will have 4 bedrooms, 5 1/2 bath rooms. add fourth level. expand horizontall basement/garage, 1st ,2nd & 3rd floors. add 4th floor (vertical expandsion.) | $586,000 |
| Oct 10, 2013 | Completed final sign-off Oct 2013 | 64 Ashbury Tr | new sink appliances, counter tops and hood installation in kitchen, new tile, sinks and vanity, tub & shower doors installation, bathroom exhaust fan to remain, no lighting changes @ bathroom & kitchen.Details
new sink appliances, counter tops and hood installation in kitchen, new tile, sinks and vanity, tub & shower doors installation, bathroom exhaust fan to remain, no lighting changes @ bathroom & kitchen. | $10,000 |