Back to kitchen remodel contractors
Lee & Georgiou Inc. Dba Georgiou Const.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jun 2019
- Last 24 months
- 0 permits filed
32 permits since 2000: 24 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 3 days from filing to permit and 474 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2018 | Completed final sign-off Apr 2021 | 2609 Fillmore St | renovation of single fam res. remodel of basement to include (n) media rm & installation of (n) int. stairs. remodel of bedrooms & bath at 2nd & 3rd fl. replacement of (e) windows at front facade at 1st fl in kind. install (n) windows at rear & (n) skylight at roof. remodel kitchen at 1st fl.Details
renovation of single fam res. remodel of basement to include (n) media rm & installation of (n) int. stairs. remodel of bedrooms & bath at 2nd & 3rd fl. replacement of (e) windows at front facade at 1st fl in kind. install (n) windows at rear & (n) skylight at roof. remodel kitchen at 1st fl. | $536,500 |
| Apr 19, 2016 | Completed final sign-off Jun 2016 | 370 07th St | kitchen cabinet & countertop replacement, approx. 6'x8'. n/a ordinance #155-13.Details
kitchen cabinet & countertop replacement, approx. 6'x8'. n/a ordinance #155-13. | $2,500 |
| Aug 28, 2015 | Completed final sign-off May 2019 | 4612 19th St | renovation & complete interior remodel. (n)interior stair, vert/horizontal add @ rear of bldg & (e)garage, replace(e)stair & paved areas @ rear yard. reconfig(e)powder rm,(e)kitchen,(e)living,(e)deck,(e)2-bedroom,(e)bath. add(n)bedrm,(n)bath,(n)terrace. convert(e)sub-basement to(n)bath,(n)rec rmDetails
renovation & complete interior remodel. (n)interior stair, vert/horizontal add @ rear of bldg & (e)garage, replace(e)stair & paved areas @ rear yard. reconfig(e)powder rm,(e)kitchen,(e)living,(e)deck,(e)2-bedroom,(e)bath. add(n)bedrm,(n)bath,(n)terrace. convert(e)sub-basement to(n)bath,(n)rec rm | $543,955 |
| Oct 10, 2013 | Completed final sign-off Oct 2013 | 64 Ashbury Tr | new sink appliances, counter tops and hood installation in kitchen, new tile, sinks and vanity, tub & shower doors installation, bathroom exhaust fan to remain, no lighting changes @ bathroom & kitchen.Details
new sink appliances, counter tops and hood installation in kitchen, new tile, sinks and vanity, tub & shower doors installation, bathroom exhaust fan to remain, no lighting changes @ bathroom & kitchen. | $10,000 |
| Apr 19, 2013 | Never finaled issued Apr 2013, no final | 231 Randall St | 1. revision to app#2012-0814-7360. 2. remodel bedrooms and kitchen on first floor (unit 1). 3. add interior stair between first and second floor. 4. legalize (e) garage on basement. 5. new rear deck and stair. 6. replace water heater and furnace. 7. replace exterior wood stair in front in kind.Details
1. revision to app#2012-0814-7360. 2. remodel bedrooms and kitchen on first floor (unit 1). 3. add interior stair between first and second floor. 4. legalize (e) garage on basement. 5. new rear deck and stair. 6. replace water heater and furnace. 7. replace exterior wood stair in front in kind. | $60,000 |