Lee & Georgiou Inc. Dba Georgiou Const.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jun 2019
- Last 24 months
- 0 permits filed
32 permits since 2000: 24 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 never finaled. Typically 152 days from filing to permit and 564 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2015 | Completed final sign-off Dec 2016 | 271 Roosevelt Wy | revision to pa# 2015/03/12/0640. new deck & stair off living room provides access to paved areas in side & rear yards.Details
revision to pa# 2015/03/12/0640. new deck & stair off living room provides access to paved areas in side & rear yards. | $11,000 |
| Aug 28, 2015 | Completed final sign-off May 2019 | 4612 19th St | renovation & complete interior remodel. (n)interior stair, vert/horizontal add @ rear of bldg & (e)garage, replace(e)stair & paved areas @ rear yard. reconfig(e)powder rm,(e)kitchen,(e)living,(e)deck,(e)2-bedroom,(e)bath. add(n)bedrm,(n)bath,(n)terrace. convert(e)sub-basement to(n)bath,(n)rec rmDetails
renovation & complete interior remodel. (n)interior stair, vert/horizontal add @ rear of bldg & (e)garage, replace(e)stair & paved areas @ rear yard. reconfig(e)powder rm,(e)kitchen,(e)living,(e)deck,(e)2-bedroom,(e)bath. add(n)bedrm,(n)bath,(n)terrace. convert(e)sub-basement to(n)bath,(n)rec rm | $543,955 |
| Apr 19, 2013 | Never finaled issued Apr 2013, no final | 231 Randall St | 1. revision to app#2012-0814-7360. 2. remodel bedrooms and kitchen on first floor (unit 1). 3. add interior stair between first and second floor. 4. legalize (e) garage on basement. 5. new rear deck and stair. 6. replace water heater and furnace. 7. replace exterior wood stair in front in kind.Details
1. revision to app#2012-0814-7360. 2. remodel bedrooms and kitchen on first floor (unit 1). 3. add interior stair between first and second floor. 4. legalize (e) garage on basement. 5. new rear deck and stair. 6. replace water heater and furnace. 7. replace exterior wood stair in front in kind. | $60,000 |