Kwok Pun Leung Const. Co ***Check I D**
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Aug 2023
- Last 24 months
- 0 permits filed
86 permits since 2000: 72 completed, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2016 | Completed final sign-off Jan 2017 | 2620 19th St | 1st floor: add 2 bedrooms, 2 full baths, family room and patio. rebuild interior staircase. excavation 47 cubic yards.Details
1st floor: add 2 bedrooms, 2 full baths, family room and patio. rebuild interior staircase. excavation 47 cubic yards. | $75,000 |
| Jul 16, 2015 | Completed final sign-off Jun 2016 | 1836 Noriega St | convert existing vacant store, parking garage area, utility room, interior stair area to new pharmacy store. rebuild existing entrance stairs to 2nd flDetails
convert existing vacant store, parking garage area, utility room, interior stair area to new pharmacy store. rebuild existing entrance stairs to 2nd fl | $120,000 |
| Sep 5, 2013 | Completed final sign-off Aug 2014 | 446 Union St | remodeling & alterations to (e) buidling, add bathroom at unit #103, 2nd floor: add family room, bathrooms & interior stairs at unit #450. basement floor: rebuild (e) court yard stairs & in kind decks. replace front 2 windows & change side windows.Details
remodeling & alterations to (e) buidling, add bathroom at unit #103, 2nd floor: add family room, bathrooms & interior stairs at unit #450. basement floor: rebuild (e) court yard stairs & in kind decks. replace front 2 windows & change side windows. | $250,000 |
| Jul 9, 2009 | Never finaled issued Jul 2009, no final | 27 27th Av | comply with nov# 200913061-repair back stairs (2 steps), patching wood soffit, vent coversDetails
comply with nov# 200913061-repair back stairs (2 steps), patching wood soffit, vent covers | $600 |
| Jun 20, 2005 | Completed final sign-off Jul 2005 | 31 Landers St | repair stairs (from nov 200560550) less than 50 percent of the structureDetails
repair stairs (from nov 200560550) less than 50 percent of the structure | $1,500 |
| Jun 9, 2005 | Completed final sign-off Jun 2005 | 819 Union St | repair wood stair for complaint #200560034 less than 50%Details
repair wood stair for complaint #200560034 less than 50% | $1,500 |
| May 9, 2002 | Completed final sign-off Aug 2002 | 1034 Pacific Av | repair dry rot of rear stairDetails
repair dry rot of rear stair | $1,000 |
| Sep 7, 2000 | Completed final sign-off Oct 2000 | 758 06th Av | repair and reconstruction rear deck and stairs take out violation #200008262Details
repair and reconstruction rear deck and stairs take out violation #200008262 | $5,000 |