Back to kitchen remodel contractors
Kwok Pun Leung Const. Co ***Check I D**
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Aug 2023
- Last 24 months
- 0 permits filed
86 permits since 2000: 72 completed, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
33 kitchen remodel permits: 27 completed, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2023 | Never finaled issued Aug 2023, no final | 754 Paris St | revision to pa# 202104017763, relocate bedroom & kitchen area at 1/f adu unit, add a toilet room at 1/f adu unit.Details
revision to pa# 202104017763, relocate bedroom & kitchen area at 1/f adu unit, add a toilet room at 1/f adu unit. | $3,500 |
| Jan 31, 2023 | Completed final sign-off Sep 2023 | 3137 Rivera St | rev to pa# 2022-1109-6218 remove one skylight above the kitchen islandDetails
rev to pa# 2022-1109-6218 remove one skylight above the kitchen island | |
| Dec 19, 2022 | Completed final sign-off Jan 2023 | 1294 23rd Av | replace kitchen cabinets, replace kitchen counter top. replace tile. one kitchen remodel (non structural). replace bath sink.Details
replace kitchen cabinets, replace kitchen counter top. replace tile. one kitchen remodel (non structural). replace bath sink. | $18,000 |
| Nov 9, 2022 | Completed final sign-off Sep 2023 | 3137 Rivera St | 1/f: add bedroom, playroom & full bath; 2/f: remodel kitchen, bathroom, add (1/2) bath, add deck @ rear, 3 new skylights.Details
1/f: add bedroom, playroom & full bath; 2/f: remodel kitchen, bathroom, add (1/2) bath, add deck @ rear, 3 new skylights. | $100,000 |
| Mar 2, 2022 | Completed final sign-off May 2022 | 4300 Anza St | unit #2. replace cabinets countertop and sink in kitchen. no wall or layout change.Details
unit #2. replace cabinets countertop and sink in kitchen. no wall or layout change. | $25,000 |
| Apr 1, 2021 | Never finaled issued Nov 2022, no final | 754 Paris St | legalized (e) unit @ 1st floor.2 bedrooms, 1 bath, & 1 kitchen per government code section 65852.2.Details
legalized (e) unit @ 1st floor.2 bedrooms, 1 bath, & 1 kitchen per government code section 65852.2. | $120,000 |
| Nov 5, 2020 | Expired or cancelled expired Feb 2026 | 754 Paris St | remodeling/alteration 2/f. relocated bedrooms,bathrooms,and kitchen. total 4 bedrooms. 2 bathrooms. add 1 skylight.Details
remodeling/alteration 2/f. relocated bedrooms,bathrooms,and kitchen. total 4 bedrooms. 2 bathrooms. add 1 skylight. | $80,000 |
| May 24, 2019 | Completed final sign-off Sep 2020 | 644 Silver Av | add units per ord #43-14. 1st flr- legalize unit per ord 43-14. add kitchen, 2 bedrooms and 1 full bathrooms.Details
add units per ord #43-14. 1st flr- legalize unit per ord 43-14. add kitchen, 2 bedrooms and 1 full bathrooms. | $50,000 |
| May 12, 2016 | Completed final sign-off Aug 2016 | 3173 21st St | apt 3: work on 3rd floor only. remodeling extg kitchen. change extg toilet to bathroom and enlarge extg bedroom at front of bldg. new furnace.Details
apt 3: work on 3rd floor only. remodeling extg kitchen. change extg toilet to bathroom and enlarge extg bedroom at front of bldg. new furnace. | $30,000 |
| Aug 25, 2015 | Completed final sign-off Jan 2016 | 806 Urbano Dr | 1st fl add storage rooms, 1/2 bath and laundry. 2nd fl remodel kitchen.Details
1st fl add storage rooms, 1/2 bath and laundry. 2nd fl remodel kitchen. | $30,000 |
| Jul 10, 2015 | Completed final sign-off Aug 2015 | 154 Vernon St | remodel kitchen, replace counter, cabinet, sink in same location in-kind. no new wall and no existing wall relocation. lighting shall comply with cec 150(k)3.Details
remodel kitchen, replace counter, cabinet, sink in same location in-kind. no new wall and no existing wall relocation. lighting shall comply with cec 150(k)3. | $15,000 |
| May 4, 2015 | Completed final sign-off Sep 2015 | 1574 43rd Av | proposed work at 2nd floor only. remodeling existing kitchen and line up wall at interior light court in the kitchen side.Details
proposed work at 2nd floor only. remodeling existing kitchen and line up wall at interior light court in the kitchen side. | $20,000 |
| Apr 1, 2015 | Completed final sign-off Aug 2016 | 2695 42nd Av | 2/f- remove non-bearing wall, install kitchen counter, remodel existing bath room, new lighting at dining room & living room. 1/f- new bedroom, family room, bathroom & toilet room, repair wall foundation.Details
2/f- remove non-bearing wall, install kitchen counter, remodel existing bath room, new lighting at dining room & living room. 1/f- new bedroom, family room, bathroom & toilet room, repair wall foundation. | $68,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2015 | 43 29th St | #43- remodel kitchen, bathroom and add 1 bath. n/a ordinance #155-13Details
#43- remodel kitchen, bathroom and add 1 bath. n/a ordinance #155-13 | $30,000 |
| Nov 6, 2014 | Expired or cancelled expired Nov 2016 | 810 32nd Av | remodeling existing bathrooms & kitchens in 810-812. total will be two kitchens & 4 bathrooms.Details
remodeling existing bathrooms & kitchens in 810-812. total will be two kitchens & 4 bathrooms. | $50,000 |
| Sep 3, 2014 | Completed final sign-off Jul 2015 | 374 28th Av | build a roof deck at 3rd floor. remodel (e) 2 kitchens and 2-1/2 bathrooms in (e) 2 units building. convert (e) living room to bedroom at 2nd floor. new toilet and storage room at 1st floor. new electrical for entire building.Details
build a roof deck at 3rd floor. remodel (e) 2 kitchens and 2-1/2 bathrooms in (e) 2 units building. convert (e) living room to bedroom at 2nd floor. new toilet and storage room at 1st floor. new electrical for entire building. | $120,000 |
| Aug 28, 2014 | Completed final sign-off Aug 2015 | 2474 45th Av | one unit legalization per ordinance 43-14. two bedroom, one bathroom, one family per pa #201211134070. legalize new kitchen at ground floor.Details
one unit legalization per ordinance 43-14. two bedroom, one bathroom, one family per pa #201211134070. legalize new kitchen at ground floor. | $1,000 |
| Jun 6, 2014 | Completed final sign-off Jan 2015 | 4500 Anza St | g/f - interior remodeling. relocate kitchen, remodel (e) bathroom, add new bedroom. new electrical through the unit. no changes to windows/doors.Details
g/f - interior remodeling. relocate kitchen, remodel (e) bathroom, add new bedroom. new electrical through the unit. no changes to windows/doors. | $28,000 |
| Aug 22, 2013 | Completed final sign-off Nov 2013 | 501 Broadway | remodeling (e) restaurant at basement & ground floor-remove bar counters at ground floor & basement, change cooking equipment & sinks, update accessible restrooms existing kitchen hood to remain.Details
remodeling (e) restaurant at basement & ground floor-remove bar counters at ground floor & basement, change cooking equipment & sinks, update accessible restrooms existing kitchen hood to remain. | $35,000 |
| Aug 2, 2013 | Completed final sign-off Oct 2013 | 1507 41st Av | proposed remodel of existing kitchen and bath at 2nd fl. change existing family room to bedroom at 1st fl. add bath a 1st and 2nd flDetails
proposed remodel of existing kitchen and bath at 2nd fl. change existing family room to bedroom at 1st fl. add bath a 1st and 2nd fl | $50,000 |
| Apr 9, 2013 | Completed final sign-off May 2013 | 50 Grand View Av | remodel kitchen, change cabinet and counterDetails
remodel kitchen, change cabinet and counter | $8,000 |
| Mar 21, 2013 | Expired or cancelled expired Jun 2018 | 4300 Anza St | remodeling existing apartment #4 at 3rd fl. add 1 bedroom w/window, remodeling (e) kitchen/dining room area. new skylights above kitchen area. new electrical lighting and outlets, gyp board replace (e0 plaster.Details
remodeling existing apartment #4 at 3rd fl. add 1 bedroom w/window, remodeling (e) kitchen/dining room area. new skylights above kitchen area. new electrical lighting and outlets, gyp board replace (e0 plaster. | $28,000 |
| Mar 19, 2012 | Completed final sign-off Jul 2012 | 830 Sloat Bl | remodel kitchen, replacement in kind, kitchen cabinet, countertop, sink & faucet, tile flooring, recessed lights, no change on walls & opening.Details
remodel kitchen, replacement in kind, kitchen cabinet, countertop, sink & faucet, tile flooring, recessed lights, no change on walls & opening. | $9,240 |
| Jun 16, 2011 | Completed final sign-off Aug 2011 | 2940 21st Av | project remodeling (e) kitchen and add a deck at rear of building.Details
project remodeling (e) kitchen and add a deck at rear of building. | $20,000 |
| Feb 15, 2011 | Completed final sign-off Apr 2011 | 915 Kearny St | project under construction by app#201012086333 under this permit. rebuild the type 1 kitchen exhaust system and make up air system in extg restaurant kitchen area.Details
project under construction by app#201012086333 under this permit. rebuild the type 1 kitchen exhaust system and make up air system in extg restaurant kitchen area. | $7,000 |
| Oct 16, 2007 | Completed final sign-off Jun 2008 | 620 Sanchez St | work @ unit# 620 only. remove existing cabinets, floor & appliances & replace. all appliances will be in the same location as previous appliances. remodel 1 kitchen.Details
work @ unit# 620 only. remove existing cabinets, floor & appliances & replace. all appliances will be in the same location as previous appliances. remodel 1 kitchen. | $20,000 |
| Oct 3, 2007 | Completed final sign-off Jan 2008 | 123 Stratford Dr | kitchen: change cabinets, stove, sink, countertop, floor tile. no structural work no new lighting.Details
kitchen: change cabinets, stove, sink, countertop, floor tile. no structural work no new lighting. | $8,170 |
| Dec 27, 2006 | Completed final sign-off Mar 2007 | 1375 15th Av | take out kitchen and bathroom on the groundfloor to clear the violation #200680447. all waalls to be remained.Details
take out kitchen and bathroom on the groundfloor to clear the violation #200680447. all waalls to be remained. | $900 |
| Mar 2, 2005 | Completed final sign-off Jun 2005 | 555 37th Av | kitchen remodeling & change cabs, store light faucet sink. replace flr tile painting to finish, noDetails
kitchen remodeling & change cabs, store light faucet sink. replace flr tile painting to finish, no | $5,800 |
| May 12, 2003 | Completed final sign-off Feb 2004 | 2112 Hyde St | remvoe old kitchen appliances from kitchen and convert room to office use (residential) create newDetails
remvoe old kitchen appliances from kitchen and convert room to office use (residential) create new | $5,500 |
| Mar 15, 2002 | Completed final sign-off Apr 2002 | 1145 Quintara St | change kitchen cabinets and change bathroom tile toilet sink tub no struct,. workDetails
change kitchen cabinets and change bathroom tile toilet sink tub no struct,. work | $9,000 |
| Dec 14, 2001 | Completed final sign-off Feb 2002 | 1646 43rd Av | kitchen and bathroom remodeling take out old cabinet tub shower toilet sink stall new cabinets bathDetails
kitchen and bathroom remodeling take out old cabinet tub shower toilet sink stall new cabinets bath | $8,000 |
| Oct 5, 2001 | Expired or cancelled expired Feb 2002 | 2118 41st Av | remodel kitchen and change cabinetDetails
remodel kitchen and change cabinet | $4,000 |