Kwok Pun Leung Const. Co ***Check I D**
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Aug 2023
- Last 24 months
- 0 permits filed
86 permits since 2000: 72 completed, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 13 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2015 | Completed final sign-off Jun 2016 | 1836 Noriega St | change of use. 1) convert extg 2nd floor to one unit dwelling and medical clinic office. 2) repair extg dry rot roof deck. 3) provide accessible medical clinic office at 1st fl.Details
change of use. 1) convert extg 2nd floor to one unit dwelling and medical clinic office. 2) repair extg dry rot roof deck. 3) provide accessible medical clinic office at 1st fl. | $35,000 |
| Sep 3, 2014 | Completed final sign-off Jul 2015 | 374 28th Av | build a roof deck at 3rd floor. remodel (e) 2 kitchens and 2-1/2 bathrooms in (e) 2 units building. convert (e) living room to bedroom at 2nd floor. new toilet and storage room at 1st floor. new electrical for entire building.Details
build a roof deck at 3rd floor. remodel (e) 2 kitchens and 2-1/2 bathrooms in (e) 2 units building. convert (e) living room to bedroom at 2nd floor. new toilet and storage room at 1st floor. new electrical for entire building. | $120,000 |