Back to bathroom remodel contractors
Kwok Pun Leung Const. Co ***Check I D**
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Aug 2023
- Last 24 months
- 0 permits filed
86 permits since 2000: 72 completed, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 29 completed, 1 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2022 | Completed final sign-off Jan 2023 | 1294 23rd Av | replace kitchen cabinets, replace kitchen counter top. replace tile. one kitchen remodel (non structural). replace bath sink.Details
replace kitchen cabinets, replace kitchen counter top. replace tile. one kitchen remodel (non structural). replace bath sink. | $18,000 |
| Nov 9, 2022 | Completed final sign-off Sep 2023 | 3137 Rivera St | 1/f: add bedroom, playroom & full bath; 2/f: remodel kitchen, bathroom, add (1/2) bath, add deck @ rear, 3 new skylights.Details
1/f: add bedroom, playroom & full bath; 2/f: remodel kitchen, bathroom, add (1/2) bath, add deck @ rear, 3 new skylights. | $100,000 |
| Apr 1, 2021 | Never finaled issued Nov 2022, no final | 754 Paris St | legalized (e) unit @ 1st floor.2 bedrooms, 1 bath, & 1 kitchen per government code section 65852.2.Details
legalized (e) unit @ 1st floor.2 bedrooms, 1 bath, & 1 kitchen per government code section 65852.2. | $120,000 |
| Nov 5, 2020 | Expired or cancelled expired Feb 2026 | 754 Paris St | remodeling/alteration 2/f. relocated bedrooms,bathrooms,and kitchen. total 4 bedrooms. 2 bathrooms. add 1 skylight.Details
remodeling/alteration 2/f. relocated bedrooms,bathrooms,and kitchen. total 4 bedrooms. 2 bathrooms. add 1 skylight. | $80,000 |
| May 24, 2019 | Completed final sign-off Sep 2020 | 644 Silver Av | add units per ord #43-14. 1st flr- legalize unit per ord 43-14. add kitchen, 2 bedrooms and 1 full bathrooms.Details
add units per ord #43-14. 1st flr- legalize unit per ord 43-14. add kitchen, 2 bedrooms and 1 full bathrooms. | $50,000 |
| May 12, 2016 | Completed final sign-off Aug 2016 | 3173 21st St | apt 3: work on 3rd floor only. remodeling extg kitchen. change extg toilet to bathroom and enlarge extg bedroom at front of bldg. new furnace.Details
apt 3: work on 3rd floor only. remodeling extg kitchen. change extg toilet to bathroom and enlarge extg bedroom at front of bldg. new furnace. | $30,000 |
| Mar 22, 2016 | Completed final sign-off Jan 2017 | 2620 19th St | 1st floor: add 2 bedrooms, 2 full baths, family room and patio. rebuild interior staircase. excavation 47 cubic yards.Details
1st floor: add 2 bedrooms, 2 full baths, family room and patio. rebuild interior staircase. excavation 47 cubic yards. | $75,000 |
| Mar 16, 2016 | Completed final sign-off May 2016 | 51 Mirabel Av | remodel bathroom, change toilet, shower & tiles, vanity. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodel bathroom, change toilet, shower & tiles, vanity. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $8,000 |
| Feb 22, 2016 | Completed final sign-off Jul 2016 | 437 Cayuga Av | proposed install family room, home office, 1 toilet room & 1 bathroom @ ground floor.Details
proposed install family room, home office, 1 toilet room & 1 bathroom @ ground floor. | $45,000 |
| Dec 14, 2015 | Completed final sign-off Jun 2016 | 1836 Noriega St | work on dwelling unit at 2nd floor: convert living room to bedrooms and bathroom.Details
work on dwelling unit at 2nd floor: convert living room to bedrooms and bathroom. | $18,000 |
| Sep 14, 2015 | Completed final sign-off Aug 2016 | 2786 38th Av | legalize conversion of dining room to bedroom and add bathroom on 2/f. legalize addition of 2 bedrooms, a media room and a full bath on 1/f. no building expansion.Details
legalize conversion of dining room to bedroom and add bathroom on 2/f. legalize addition of 2 bedrooms, a media room and a full bath on 1/f. no building expansion. | $45,000 |
| Aug 25, 2015 | Completed final sign-off Jan 2016 | 806 Urbano Dr | 1st fl add storage rooms, 1/2 bath and laundry. 2nd fl remodel kitchen.Details
1st fl add storage rooms, 1/2 bath and laundry. 2nd fl remodel kitchen. | $30,000 |
| Apr 1, 2015 | Completed final sign-off Aug 2016 | 2695 42nd Av | 2/f- remove non-bearing wall, install kitchen counter, remodel existing bath room, new lighting at dining room & living room. 1/f- new bedroom, family room, bathroom & toilet room, repair wall foundation.Details
2/f- remove non-bearing wall, install kitchen counter, remodel existing bath room, new lighting at dining room & living room. 1/f- new bedroom, family room, bathroom & toilet room, repair wall foundation. | $68,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2015 | 43 29th St | #43- remodel kitchen, bathroom and add 1 bath. n/a ordinance #155-13Details
#43- remodel kitchen, bathroom and add 1 bath. n/a ordinance #155-13 | $30,000 |
| Nov 6, 2014 | Expired or cancelled expired Nov 2016 | 810 32nd Av | remodeling existing bathrooms & kitchens in 810-812. total will be two kitchens & 4 bathrooms.Details
remodeling existing bathrooms & kitchens in 810-812. total will be two kitchens & 4 bathrooms. | $50,000 |
| Sep 3, 2014 | Completed final sign-off Jul 2015 | 374 28th Av | build a roof deck at 3rd floor. remodel (e) 2 kitchens and 2-1/2 bathrooms in (e) 2 units building. convert (e) living room to bedroom at 2nd floor. new toilet and storage room at 1st floor. new electrical for entire building.Details
build a roof deck at 3rd floor. remodel (e) 2 kitchens and 2-1/2 bathrooms in (e) 2 units building. convert (e) living room to bedroom at 2nd floor. new toilet and storage room at 1st floor. new electrical for entire building. | $120,000 |
| Aug 28, 2014 | Completed final sign-off Aug 2015 | 2474 45th Av | one unit legalization per ordinance 43-14. two bedroom, one bathroom, one family per pa #201211134070. legalize new kitchen at ground floor.Details
one unit legalization per ordinance 43-14. two bedroom, one bathroom, one family per pa #201211134070. legalize new kitchen at ground floor. | $1,000 |
| Jun 27, 2014 | Completed final sign-off Jun 2015 | 812 32nd Av | add new family room & new half bath in the ground floor. addition would be part of 812 - 32nd ave.Details
add new family room & new half bath in the ground floor. addition would be part of 812 - 32nd ave. | $20,000 |
| Jun 6, 2014 | Completed final sign-off Jan 2015 | 4500 Anza St | g/f - interior remodeling. relocate kitchen, remodel (e) bathroom, add new bedroom. new electrical through the unit. no changes to windows/doors.Details
g/f - interior remodeling. relocate kitchen, remodel (e) bathroom, add new bedroom. new electrical through the unit. no changes to windows/doors. | $28,000 |
| Oct 3, 2013 | Completed final sign-off Mar 2014 | 1618 35th Av | remodel existing 1st floor - convert existing bedroom and laundry room to family room, relocate existing bathroom. install window @ rear.Details
remodel existing 1st floor - convert existing bedroom and laundry room to family room, relocate existing bathroom. install window @ rear. | $40,000 |
| Sep 5, 2013 | Completed final sign-off Aug 2014 | 446 Union St | remodeling & alterations to (e) buidling, add bathroom at unit #103, 2nd floor: add family room, bathrooms & interior stairs at unit #450. basement floor: rebuild (e) court yard stairs & in kind decks. replace front 2 windows & change side windows.Details
remodeling & alterations to (e) buidling, add bathroom at unit #103, 2nd floor: add family room, bathrooms & interior stairs at unit #450. basement floor: rebuild (e) court yard stairs & in kind decks. replace front 2 windows & change side windows. | $250,000 |
| Aug 16, 2013 | Completed final sign-off Oct 2013 | 1507 41st Av | revision to pa# 2013-0802-3421-reduce the proposed full bathroom to half bathroom on 2nd floor. repair (e) foundation at ground floorDetails
revision to pa# 2013-0802-3421-reduce the proposed full bathroom to half bathroom on 2nd floor. repair (e) foundation at ground floor | |
| Aug 2, 2013 | Completed final sign-off Oct 2013 | 1507 41st Av | proposed remodel of existing kitchen and bath at 2nd fl. change existing family room to bedroom at 1st fl. add bath a 1st and 2nd flDetails
proposed remodel of existing kitchen and bath at 2nd fl. change existing family room to bedroom at 1st fl. add bath a 1st and 2nd fl | $50,000 |
| Dec 27, 2012 | Completed final sign-off May 2013 | 41 29th St | proposed remodeling extg bldg unit #41. add a new bathroom. replace window at rear, remodel extg porch. repair extg wall foundation.Details
proposed remodeling extg bldg unit #41. add a new bathroom. replace window at rear, remodel extg porch. repair extg wall foundation. | $60,000 |
| Nov 13, 2012 | Completed final sign-off Mar 2013 | 2474 45th Av | infill existing sun room at 1/f, install 2 bedrooms, family room, bath room at 1/fDetails
infill existing sun room at 1/f, install 2 bedrooms, family room, bath room at 1/f | $32,000 |
| Jun 12, 2008 | Completed final sign-off Aug 2008 | 1315 Silliman St | proposed: install bedroom, family room, storage room and bathroom at ground floorDetails
proposed: install bedroom, family room, storage room and bathroom at ground floor | $36,000 |
| Jan 17, 2008 | Completed final sign-off Mar 2008 | 143 Victoria St | install (2) bedrooms, (1) bathroom at ground floor.Details
install (2) bedrooms, (1) bathroom at ground floor. | $22,000 |
| Dec 27, 2006 | Completed final sign-off Mar 2007 | 1375 15th Av | take out kitchen and bathroom on the groundfloor to clear the violation #200680447. all waalls to be remained.Details
take out kitchen and bathroom on the groundfloor to clear the violation #200680447. all waalls to be remained. | $900 |
| Jan 7, 2005 | Completed final sign-off Apr 2005 | 635 09th Av | make new closetand replace wall tile for bathroom with the violation#200455896. structural work.Details
make new closetand replace wall tile for bathroom with the violation#200455896. structural work. | $10,000 |
| Apr 29, 2003 | Completed final sign-off Jun 2003 | 2570 26th Av | bathroom remodeling: (one) change bath tub, toilet, vanity sink, tile and new install ceiling fanDetails
bathroom remodeling: (one) change bath tub, toilet, vanity sink, tile and new install ceiling fan | $5,000 |
| Mar 15, 2002 | Completed final sign-off Apr 2002 | 1145 Quintara St | change kitchen cabinets and change bathroom tile toilet sink tub no struct,. workDetails
change kitchen cabinets and change bathroom tile toilet sink tub no struct,. work | $9,000 |
| Dec 14, 2001 | Completed final sign-off Feb 2002 | 1646 43rd Av | kitchen and bathroom remodeling take out old cabinet tub shower toilet sink stall new cabinets bathDetails
kitchen and bathroom remodeling take out old cabinet tub shower toilet sink stall new cabinets bath | $8,000 |
| May 21, 2001 | Expired or cancelled expired Sep 2001 | 27 27th Av | remodel bathroomDetails
remodel bathroom | $3,000 |