Karol Construction
- Based in
- San Rafael
- On San Francisco permits
- Dec 2008 to Feb 2014
- Last 24 months
- 0 permits filed
20 permits since 2000: 20 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 29, 2010 | Completed final sign-off Dec 2010 | 58 Havelock St | dry rot repair under entry stairs in garage. 6-2x4 studs & plywood have dryrot, replace existing studs & plywood for new. less than 50% stair repair.Details
dry rot repair under entry stairs in garage. 6-2x4 studs & plywood have dryrot, replace existing studs & plywood for new. less than 50% stair repair. | $2,000 |
| Dec 18, 2008 | Completed final sign-off Apr 2009 | 4150 17th St | remodel kitchen new lighting, electrical, plmbg cabinets, flooring. revise 1 stair run with minor framing change. minor electrical change on 3 levels(lighting, switches, & plugs)Details
remodel kitchen new lighting, electrical, plmbg cabinets, flooring. revise 1 stair run with minor framing change. minor electrical change on 3 levels(lighting, switches, & plugs) | $18,000 |