Karol Construction
- Based in
- San Rafael
- On San Francisco permits
- Dec 2008 to Feb 2014
- Last 24 months
- 0 permits filed
20 permits since 2000: 20 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2013 | Completed final sign-off May 2014 | 640 Davis St | unit 8 - remodel kitchen and bathrooms, to comply with cec150(k) 8 & 10Details
unit 8 - remodel kitchen and bathrooms, to comply with cec150(k) 8 & 10 | $50,000 |
| Nov 15, 2011 | Completed final sign-off Dec 2011 | 162 Stoneridge Ln | work is inside unit # 162 (interior) -install cement board on top of existing linoleum floor & install new tiles at two bathrooms and kitchen floor. re-install existing appliances. no wall relocation, no electrical and no lighting work. comply with co alarms per cbc-2010 sec. 42014;Details
work is inside unit # 162 (interior) -install cement board on top of existing linoleum floor & install new tiles at two bathrooms and kitchen floor. re-install existing appliances. no wall relocation, no electrical and no lighting work. comply with co alarms per cbc-2010 sec. 42014; | $3,000 |
| Aug 17, 2011 | Completed final sign-off Oct 2011 | 2055 Bush St | kitchen cabinet & counter top replacement, new floor tile, relocate dishwasher, install new sink.Details
kitchen cabinet & counter top replacement, new floor tile, relocate dishwasher, install new sink. | $8,000 |
| Mar 8, 2011 | Completed final sign-off Aug 2011 | 1900 Steiner St | kitchen remodel: 1) open wall from dining room to kitchen. 2)add gfi to the counter top, install new recess can light use extg power. install new sink use extg plmg change angle stop water valve. install new cabinets, same layout.Details
kitchen remodel: 1) open wall from dining room to kitchen. 2)add gfi to the counter top, install new recess can light use extg power. install new sink use extg plmg change angle stop water valve. install new cabinets, same layout. | $15,000 |
| Dec 18, 2008 | Completed final sign-off Apr 2009 | 4150 17th St | remodel kitchen new lighting, electrical, plmbg cabinets, flooring. revise 1 stair run with minor framing change. minor electrical change on 3 levels(lighting, switches, & plugs)Details
remodel kitchen new lighting, electrical, plmbg cabinets, flooring. revise 1 stair run with minor framing change. minor electrical change on 3 levels(lighting, switches, & plugs) | $18,000 |
| Dec 17, 2008 | Completed final sign-off Apr 2009 | 4150 17th St | work @ unit# 19 only. kitchen remodel. demolish/remove kitchen cabinets & counter top. take out existing appliances.Details
work @ unit# 19 only. kitchen remodel. demolish/remove kitchen cabinets & counter top. take out existing appliances. | $16,660 |