Karol Construction
- Based in
- San Rafael
- On San Francisco permits
- Dec 2008 to Feb 2014
- Last 24 months
- 0 permits filed
20 permits since 2000: 20 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 53 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2014 | Completed final sign-off Apr 2014 | 93 Clairview Ct | remodel of bathroom: change valve, take bathtub out, make shower. no plan or layout to remain unchanged.Details
remodel of bathroom: change valve, take bathtub out, make shower. no plan or layout to remain unchanged. | $10,000 |
| Dec 3, 2013 | Completed final sign-off May 2014 | 640 Davis St | unit 8 - remodel kitchen and bathrooms, to comply with cec150(k) 8 & 10Details
unit 8 - remodel kitchen and bathrooms, to comply with cec150(k) 8 & 10 | $50,000 |
| Nov 15, 2011 | Completed final sign-off Dec 2011 | 162 Stoneridge Ln | work is inside unit # 162 (interior) -install cement board on top of existing linoleum floor & install new tiles at two bathrooms and kitchen floor. re-install existing appliances. no wall relocation, no electrical and no lighting work. comply with co alarms per cbc-2010 sec. 42014;Details
work is inside unit # 162 (interior) -install cement board on top of existing linoleum floor & install new tiles at two bathrooms and kitchen floor. re-install existing appliances. no wall relocation, no electrical and no lighting work. comply with co alarms per cbc-2010 sec. 42014; | $3,000 |
| Oct 5, 2011 | Completed final sign-off Nov 2011 | 153 Stoneridge Ln | (1) bathroom remodeling. all lighting shall be high efficency.Details
(1) bathroom remodeling. all lighting shall be high efficency. | $8,000 |
| Mar 17, 2011 | Completed final sign-off May 2011 | 580 Teresita Bl | take out existing tile & install new tiles, change bath tub for new, install same location & use same plumbing connection.Details
take out existing tile & install new tiles, change bath tub for new, install same location & use same plumbing connection. | $1,200 |