Karol Construction
- Based in
- San Rafael
- On San Francisco permits
- Dec 2008 to Feb 2014
- Last 24 months
- 0 permits filed
20 permits since 2000: 20 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 0 days from filing to permit and 22 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2012 | Completed final sign-off Sep 2012 | 2150 19th Av | change dry rot existing deck in kind. less than 50%. not visisble from street.Details
change dry rot existing deck in kind. less than 50%. not visisble from street. | $3,000 |
| Aug 21, 2012 | Completed final sign-off Jul 2013 | 59 Lee Av | comply with nov#201247721. deck dry root repair less than 50% . change window in same opening. at side of the house, not visible from street u factor <.4Details
comply with nov#201247721. deck dry root repair less than 50% . change window in same opening. at side of the house, not visible from street u factor <.4 | $8,000 |
| Aug 21, 2012 | Completed final sign-off Sep 2012 | 1900 Steiner St | back deck dry rot repair. less than 50%.Details
back deck dry rot repair. less than 50%. | $5,000 |
| Mar 1, 2010 | Completed final sign-off Mar 2010 | 1904 Steiner St | unit #c:take (e) dry-rot deck board's out. install (n) waterproofing membrane on (e) balcony 10'x20' floor deck & install (n) redwood boards on top of (n) membrane @ rear.Details
unit #c:take (e) dry-rot deck board's out. install (n) waterproofing membrane on (e) balcony 10'x20' floor deck & install (n) redwood boards on top of (n) membrane @ rear. | $2,000 |