Back to kitchen remodel contractors
K & J Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Oct 2018
- Last 24 months
- 0 permits filed
45 permits since 2000: 24 completed, 9 never finaled, 12 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2018 | Completed final sign-off Nov 2018 | 3131 Lincoln Wy | (1) bathroom and (1) kitchen remodel. remove (e) bathroom wall tiles and dry wall. remove (e) cabinets and counter tops. floor tile replace with vinyl flooring. no layout change and structure work.Details
(1) bathroom and (1) kitchen remodel. remove (e) bathroom wall tiles and dry wall. remove (e) cabinets and counter tops. floor tile replace with vinyl flooring. no layout change and structure work. | $35,000 |
| Nov 14, 2017 | Completed final sign-off Oct 2018 | 182 Terra Vista Av | replace kitchen countertop,partition enclose kitchen area. remodel lower floor bathroom. no structural work. no change of layout.Details
replace kitchen countertop,partition enclose kitchen area. remodel lower floor bathroom. no structural work. no change of layout. | $9,000 |
| May 11, 2017 | Completed final sign-off Jul 2017 | 887 47th Av | bathroom and kitchen remodel: kitchen-replace cabinets and counter top. bathroom-replace tile walls, floor tiles, bathtub, toilet, vanity. no structural work.Details
bathroom and kitchen remodel: kitchen-replace cabinets and counter top. bathroom-replace tile walls, floor tiles, bathtub, toilet, vanity. no structural work. | $12,000 |
| Jan 20, 2017 | Completed final sign-off Dec 2017 | 126 Park St | remodel kitchen, no structural work.Details
remodel kitchen, no structural work. | $8,000 |
| Mar 16, 2015 | Completed final sign-off Jul 2015 | 1159 Church St | replace kitchen cabinets, countertops and flooring (8ft x 14 ft) no structural workDetails
replace kitchen cabinets, countertops and flooring (8ft x 14 ft) no structural work | $8,000 |
| Sep 11, 2009 | Completed final sign-off Oct 2010 | 1498 46th Av | fire damage: repair fire damaged flr framing & right side ext wall, interior gut of finishes. stud wall sealing for odor control. seal fl, ceiling joist system, repl finiahes. install insulation. repl kitchen & bathrm fixtures. electrical, mechanical system. lower floor: add 1 bedrm, 1 bath & livDetails
fire damage: repair fire damaged flr framing & right side ext wall, interior gut of finishes. stud wall sealing for odor control. seal fl, ceiling joist system, repl finiahes. install insulation. repl kitchen & bathrm fixtures. electrical, mechanical system. lower floor: add 1 bedrm, 1 bath & liv | $60,000 |
| Aug 19, 2003 | Completed final sign-off Mar 2004 | 1018 Jackson St | install insulation,drywall,kitchen cabinets, kitchen flr tile, bathroom fl tile, shower wall tile.Details
install insulation,drywall,kitchen cabinets, kitchen flr tile, bathroom fl tile, shower wall tile. | $120,000 |
| Sep 24, 2002 | Completed final sign-off Apr 2003 | 619 05th Av | remove & replace fire damagewall .remodel kitchen & bath.Details
remove & replace fire damagewall .remodel kitchen & bath. | $30,000 |