Back to bathroom remodel contractors
K & J Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Oct 2018
- Last 24 months
- 0 permits filed
45 permits since 2000: 24 completed, 9 never finaled, 12 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 6 completed, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2018 | Expired or cancelled withdrawn Mar 2019 | 442 10th Av | add (n) unit @ basement w/ 2 bedrooms and 1 bath per ord# 162-16.Details
add (n) unit @ basement w/ 2 bedrooms and 1 bath per ord# 162-16. | $5,000 |
| Jun 11, 2018 | Completed final sign-off Nov 2018 | 3131 Lincoln Wy | (1) bathroom and (1) kitchen remodel. remove (e) bathroom wall tiles and dry wall. remove (e) cabinets and counter tops. floor tile replace with vinyl flooring. no layout change and structure work.Details
(1) bathroom and (1) kitchen remodel. remove (e) bathroom wall tiles and dry wall. remove (e) cabinets and counter tops. floor tile replace with vinyl flooring. no layout change and structure work. | $35,000 |
| Nov 14, 2017 | Completed final sign-off Oct 2018 | 182 Terra Vista Av | replace kitchen countertop,partition enclose kitchen area. remodel lower floor bathroom. no structural work. no change of layout.Details
replace kitchen countertop,partition enclose kitchen area. remodel lower floor bathroom. no structural work. no change of layout. | $9,000 |
| May 11, 2017 | Completed final sign-off Jul 2017 | 887 47th Av | bathroom and kitchen remodel: kitchen-replace cabinets and counter top. bathroom-replace tile walls, floor tiles, bathtub, toilet, vanity. no structural work.Details
bathroom and kitchen remodel: kitchen-replace cabinets and counter top. bathroom-replace tile walls, floor tiles, bathtub, toilet, vanity. no structural work. | $12,000 |
| Dec 6, 2013 | Never finaled issued Jun 2014, no final | 161 23rd Av | 1)construct new elevator shaft from ground floor to 3rd floor. relocate extg furnace and replace extg water heater with new tankless. remove extg laundry room at 2nd floor. remove extg full bath at 3rd floor and construct new half bath.Details
1)construct new elevator shaft from ground floor to 3rd floor. relocate extg furnace and replace extg water heater with new tankless. remove extg laundry room at 2nd floor. remove extg full bath at 3rd floor and construct new half bath. | $9,000 |
| Sep 11, 2009 | Completed final sign-off Oct 2010 | 1498 46th Av | fire damage: repair fire damaged flr framing & right side ext wall, interior gut of finishes. stud wall sealing for odor control. seal fl, ceiling joist system, repl finiahes. install insulation. repl kitchen & bathrm fixtures. electrical, mechanical system. lower floor: add 1 bedrm, 1 bath & livDetails
fire damage: repair fire damaged flr framing & right side ext wall, interior gut of finishes. stud wall sealing for odor control. seal fl, ceiling joist system, repl finiahes. install insulation. repl kitchen & bathrm fixtures. electrical, mechanical system. lower floor: add 1 bedrm, 1 bath & liv | $60,000 |
| Feb 11, 2008 | Never finaled issued Feb 2008, no final | 2220 Pine St | replace bathroom floor tile and entry floor file, no structural. (approx. 60 sq. ft. tile floor)Details
replace bathroom floor tile and entry floor file, no structural. (approx. 60 sq. ft. tile floor) | $900 |
| Nov 18, 2004 | Expired or cancelled expired Jun 2010 | 274 24th Av | replace shower wall tile and wall tile at bathroom. no structural workDetails
replace shower wall tile and wall tile at bathroom. no structural work | $1,000 |
| Aug 19, 2003 | Completed final sign-off Mar 2004 | 1018 Jackson St | install insulation,drywall,kitchen cabinets, kitchen flr tile, bathroom fl tile, shower wall tile.Details
install insulation,drywall,kitchen cabinets, kitchen flr tile, bathroom fl tile, shower wall tile. | $120,000 |
| Sep 24, 2002 | Completed final sign-off Apr 2003 | 619 05th Av | remove & replace fire damagewall .remodel kitchen & bath.Details
remove & replace fire damagewall .remodel kitchen & bath. | $30,000 |
| Feb 21, 2002 | Expired or cancelled expired Jan 2003 | 245 17th Av | replace bathroom walls and floor tile no structural workDetails
replace bathroom walls and floor tile no structural work | $1,000 |