K & J Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Oct 2018
- Last 24 months
- 0 permits filed
45 permits since 2000: 24 completed, 9 never finaled, 12 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 16 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2010 | Completed final sign-off Oct 2010 | 2351 25th Av | repair front stair dry rot & 4 concrete steps. less than 50%.Details
repair front stair dry rot & 4 concrete steps. less than 50%. | $2,000 |
| Oct 8, 2009 | Never finaled issued Feb 2010, no final | 1498 46th Av | enclosed (e) deck for 2/f bedroom extension (78 sf), enclosed (e) g/f porch for lower living room extension (97 sf), relocate open wood stair to rear yard. replace living room, bedrooms wall/floor finish for insulation upgrade, partial seismic structural strengthening.Details
enclosed (e) deck for 2/f bedroom extension (78 sf), enclosed (e) g/f porch for lower living room extension (97 sf), relocate open wood stair to rear yard. replace living room, bedrooms wall/floor finish for insulation upgrade, partial seismic structural strengthening. | $40,000 |
| Apr 13, 2009 | Completed final sign-off Apr 2009 | 202 21st Av | to comply with nov# 200997461, item# 2 & # 6. replace existing 2nd story rear stair landing extension guard rail. less than 50% repair. minimum height of guard 42".Details
to comply with nov# 200997461, item# 2 & # 6. replace existing 2nd story rear stair landing extension guard rail. less than 50% repair. minimum height of guard 42". | $500 |
| Jan 29, 2001 | Expired or cancelled expired Feb 2002 | 254 Jules Av | r3eplace dryrot at front stair and replace with tile for the steps and landing less than 50% stair sDetails
r3eplace dryrot at front stair and replace with tile for the steps and landing less than 50% stair s | $3,000 |