Back to kitchen remodel contractors
K Bali Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2012 to Oct 2025
- Last 24 months
- 5 permits filed
114 permits since 2000: 88 completed, 4 in progress, 11 never finaled, 11 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 12 completed, 4 in progress, 1 never finaled, 2 expired or cancelled. Typically 27 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2025 | In progress issued Nov 2025 | 1530 Leavenworth St | units 9-12- remodel (e) kitchen kitchen and remodel (e) bathroom, install (n) washer and dryer and convert (e) kitchen into (n) office space. no additional square footage added.Details
units 9-12- remodel (e) kitchen kitchen and remodel (e) bathroom, install (n) washer and dryer and convert (e) kitchen into (n) office space. no additional square footage added. | $300,000 |
| Sep 23, 2025 | In progress issued Oct 2025 | 1530 Leavenworth St | units 5, 6, 7 & 8: (e) kitchen relocation, (e) bathroom remodel, (n) washer and dryer. convert (e) kitchen into (n) office.Details
units 5, 6, 7 & 8: (e) kitchen relocation, (e) bathroom remodel, (n) washer and dryer. convert (e) kitchen into (n) office. | $300,000 |
| Sep 3, 2025 | In progress issued Sep 2025 | 1530 Leavenworth St | revision to pa # 2025-0630-9810. units 1, 2, 3 & 4. (e) kitchen relocation (e) bathroom remodel. (n) washer and dryer- convert (e) kitchen into (n) office.Details
revision to pa # 2025-0630-9810. units 1, 2, 3 & 4. (e) kitchen relocation (e) bathroom remodel. (n) washer and dryer- convert (e) kitchen into (n) office. | $28,000 |
| Jun 30, 2025 | In progress issued Jun 2025 | 1530 Leavenworth St | 4 kitchen, 4 bathroom removation. relocation of 4 subpanels and all new circuits w/gfci. 4 new bathroom and 4 kitchen plumbing, new angle stops. 4 new shower pans.Details
4 kitchen, 4 bathroom removation. relocation of 4 subpanels and all new circuits w/gfci. 4 new bathroom and 4 kitchen plumbing, new angle stops. 4 new shower pans. | $250,000 |
| Jul 6, 2023 | Completed final sign-off Oct 2024 | 1601 Mariposa St | tenant improvement new customer area, kitchen and equipment finishes, ceiling and lighting (first time tenant)Details
tenant improvement new customer area, kitchen and equipment finishes, ceiling and lighting (first time tenant) | $55,000 |
| Jan 19, 2023 | Expired or cancelled expired Mar 2024 | 1200 Market St | revision to 202109158511 and 202206307517. relocation of electrical gear and corresponding layout change to kitchen b104.Details
revision to 202109158511 and 202206307517. relocation of electrical gear and corresponding layout change to kitchen b104. | |
| Jun 30, 2022 | Expired or cancelled expired Mar 2024 | 1200 Market St | basement: revision to 202109158511 to incorporate the modification of size to kitchen b101. the addition of cold storage walk in box b106. removal of kitchen 107 and utility control room is now (e) to remain in (e) location. addition of b105 kitchenDetails
basement: revision to 202109158511 to incorporate the modification of size to kitchen b101. the addition of cold storage walk in box b106. removal of kitchen 107 and utility control room is now (e) to remain in (e) location. addition of b105 kitchen | |
| Feb 3, 2022 | Completed final sign-off Mar 2024 | 1200 Market St | t.i. mechanical & electrical work associated with food hall and kitchens.Details
t.i. mechanical & electrical work associated with food hall and kitchens. | $175,000 |
| Apr 30, 2020 | Completed final sign-off Nov 2020 | 90 Charter Oak Av | revision to pa#201908300340. split kitchens 101 into (2) kitchens; 101a &101b. corresponding door & finishes revised. enlarge kitchen 140. restrms 143, 154, 153: revised sinks to wall hung sinks. replace all wall tole for frp. storefront at driver check-in room 145 revised. roll up door on exteriorDetails
revision to pa#201908300340. split kitchens 101 into (2) kitchens; 101a &101b. corresponding door & finishes revised. enlarge kitchen 140. restrms 143, 154, 153: revised sinks to wall hung sinks. replace all wall tole for frp. storefront at driver check-in room 145 revised. roll up door on exterior | $8,500 |
| Aug 30, 2019 | Completed final sign-off Jul 2021 | 90 Charter Oak Av | (n) interior non-bearing partitions, ceilings & finishes. (n) doors & windows @(e) bldg facade. (n) hvac system & kitchen exhaust system. provide necessary control for all systems. (n) elec throught. (n) plumbing. (n) walk-in cooler & freezer. upgrade fire alarm & sprinkler system.**maher n/a**Details
(n) interior non-bearing partitions, ceilings & finishes. (n) doors & windows @(e) bldg facade. (n) hvac system & kitchen exhaust system. provide necessary control for all systems. (n) elec throught. (n) plumbing. (n) walk-in cooler & freezer. upgrade fire alarm & sprinkler system.**maher n/a** | $3,750,000 |
| Dec 7, 2016 | Completed final sign-off Jun 2018 | 580 Hayes St | #2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning.Details
#2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning. | $250,000 |
| Nov 10, 2016 | Completed final sign-off Apr 2017 | 2201 Fillmore St | t. i. an ice cream shop from former evolution fresh (limited restaurant), no added square footage, no change of use, no change in occupancy type. add kitchen, new electrical plumbing work, new awning.Details
t. i. an ice cream shop from former evolution fresh (limited restaurant), no added square footage, no change of use, no change in occupancy type. add kitchen, new electrical plumbing work, new awning. | $45,000 |
| Oct 19, 2015 | Completed final sign-off Jul 2016 | 400 Eddy St | build out kitchen, restroom , and bar on ground floor. buildout 3 restrooms and bar in basement & storage rooms. new finishes, equipment and lighting. replace extg windows and doors on facade. replace extg tile w/brick on facade. no work on residential units.Details
build out kitchen, restroom , and bar on ground floor. buildout 3 restrooms and bar in basement & storage rooms. new finishes, equipment and lighting. replace extg windows and doors on facade. replace extg tile w/brick on facade. no work on residential units. | $800,000 |
| Sep 21, 2015 | Completed final sign-off Aug 2016 | 330 Gough St | revision to pa 2014 0604 7456 r2 restaurant ti- include interior walls, floor & ceiling finishes, kitchen equipment, restrooms, and light fixtures. sprinklers under seperate permit. maher naDetails
revision to pa 2014 0604 7456 r2 restaurant ti- include interior walls, floor & ceiling finishes, kitchen equipment, restrooms, and light fixtures. sprinklers under seperate permit. maher na | $220,000 |
| Jul 8, 2015 | Completed final sign-off Feb 2016 | 1520 Fillmore St | demolition of existing interior space to include removal of all surface mounted fixture, tiles on floor, wood counter bar, kitchen plumbing fixtures, walk in refrigerator, door, and stair railing. demo to take place on both floors.Details
demolition of existing interior space to include removal of all surface mounted fixture, tiles on floor, wood counter bar, kitchen plumbing fixtures, walk in refrigerator, door, and stair railing. demo to take place on both floors. | $30,000 |
| Oct 23, 2014 | Completed final sign-off Nov 2014 | 431 Bryant St | revision appl. 2014.0521.6408. to add a new kitchenette per plan. maher n/a.Details
revision appl. 2014.0521.6408. to add a new kitchenette per plan. maher n/a. | $2,500 |
| Jun 5, 2014 | Completed final sign-off Sep 2014 | 3245 21st St | remodel first floor per plan. kitchen and batroom remodel. new posts and beam.Details
remodel first floor per plan. kitchen and batroom remodel. new posts and beam. | $75,000 |
| May 30, 2014 | Never finaled issued Jun 2014, no final | 919 Cortland Av | change from a pizza restaurant to a fam style dinner restaurant. renovate including (n) plbg, (n) electrical, (n) lighting, (n) kitchen w/new finishes. (n) flooring, (n) gyp bd, ceiling walls, (n) painting. (n) hood & (n) ventilation under separate permit.Details
change from a pizza restaurant to a fam style dinner restaurant. renovate including (n) plbg, (n) electrical, (n) lighting, (n) kitchen w/new finishes. (n) flooring, (n) gyp bd, ceiling walls, (n) painting. (n) hood & (n) ventilation under separate permit. | $150,000 |
| Nov 25, 2013 | Completed final sign-off Jan 2014 | 550 Alabama St | remove non load bearing paritions. new partitons for accessible restrooms. large walk in cooler and rooftop equipment. new 15ft kitchen hood with make up air unit. new gas lines to kitchen equipmentDetails
remove non load bearing paritions. new partitons for accessible restrooms. large walk in cooler and rooftop equipment. new 15ft kitchen hood with make up air unit. new gas lines to kitchen equipment | $125,000 |