Back to bathroom remodel contractors
K Bali Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2012 to Oct 2025
- Last 24 months
- 5 permits filed
114 permits since 2000: 88 completed, 4 in progress, 11 never finaled, 11 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
10 bathroom remodel permits: 4 completed, 4 in progress, 1 never finaled, 1 expired or cancelled. Typically 12 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2025 | In progress issued Nov 2025 | 1530 Leavenworth St | units 9-12- remodel (e) kitchen kitchen and remodel (e) bathroom, install (n) washer and dryer and convert (e) kitchen into (n) office space. no additional square footage added.Details
units 9-12- remodel (e) kitchen kitchen and remodel (e) bathroom, install (n) washer and dryer and convert (e) kitchen into (n) office space. no additional square footage added. | $300,000 |
| Sep 23, 2025 | In progress issued Oct 2025 | 1530 Leavenworth St | units 5, 6, 7 & 8: (e) kitchen relocation, (e) bathroom remodel, (n) washer and dryer. convert (e) kitchen into (n) office.Details
units 5, 6, 7 & 8: (e) kitchen relocation, (e) bathroom remodel, (n) washer and dryer. convert (e) kitchen into (n) office. | $300,000 |
| Sep 3, 2025 | In progress issued Sep 2025 | 1530 Leavenworth St | revision to pa # 2025-0630-9810. units 1, 2, 3 & 4. (e) kitchen relocation (e) bathroom remodel. (n) washer and dryer- convert (e) kitchen into (n) office.Details
revision to pa # 2025-0630-9810. units 1, 2, 3 & 4. (e) kitchen relocation (e) bathroom remodel. (n) washer and dryer- convert (e) kitchen into (n) office. | $28,000 |
| Jun 30, 2025 | In progress issued Jun 2025 | 1530 Leavenworth St | 4 kitchen, 4 bathroom removation. relocation of 4 subpanels and all new circuits w/gfci. 4 new bathroom and 4 kitchen plumbing, new angle stops. 4 new shower pans.Details
4 kitchen, 4 bathroom removation. relocation of 4 subpanels and all new circuits w/gfci. 4 new bathroom and 4 kitchen plumbing, new angle stops. 4 new shower pans. | $250,000 |
| Jun 24, 2016 | Never finaled issued Jun 2016, no final | 2325 Polk St | revision to ref pa 2015 0910 6596: revise bathroom layoutDetails
revision to ref pa 2015 0910 6596: revise bathroom layout | $1,000 |
| Jan 15, 2015 | Completed final sign-off Mar 2015 | 1001 Guerrero St | g/f - vacant space; barrier removal for ada bathroom. n/a ordinance #155-13Details
g/f - vacant space; barrier removal for ada bathroom. n/a ordinance #155-13 | $10,000 |
| Aug 28, 2014 | Expired or cancelled expired Dec 2025 | 919 Cortland Av | revision to pa#201405307147, change in plan layout, remove non-ada bath.Details
revision to pa#201405307147, change in plan layout, remove non-ada bath. | |
| Apr 1, 2014 | Completed final sign-off Sep 2014 | 3245 21st St | kithen & bath remodel in-kind. no new openings, no windows, no doors.Details
kithen & bath remodel in-kind. no new openings, no windows, no doors. | $15,000 |
| May 9, 2013 | Completed final sign-off Sep 2013 | 843 Hayes St | remodel of existing bath at 3rd floor. provide new bathroom and laundry room at existing office area 3rd floor. replace existing non-conforming interior stair to attic storage.Details
remodel of existing bath at 3rd floor. provide new bathroom and laundry room at existing office area 3rd floor. replace existing non-conforming interior stair to attic storage. | $45,000 |
| Apr 30, 2013 | Completed final sign-off Oct 2013 | 477 Colon Av | bathroom remodel, no changes to walls or openings. on 2/f, provide high efficacy lighting, new exhaust fan, connect to existing duct.Details
bathroom remodel, no changes to walls or openings. on 2/f, provide high efficacy lighting, new exhaust fan, connect to existing duct. | $20,000 |