Back to kitchen remodel contractors
John Herman Gruninger Iii
- Based in
- Berkeley
- On San Francisco permits
- Mar 2000 to Feb 2026
- Last 24 months
- 2 permits filed
37 permits since 2000: 32 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2024 | Completed final sign-off Dec 2024 | 154 Bocana St | kitchen remodel. new cabinets, countertops, sink, faucet, dishwasher, install accesible gas shut off valve, countertop circuits, under cabinet lighting. 5 led, ic recessed lights.Details
kitchen remodel. new cabinets, countertops, sink, faucet, dishwasher, install accesible gas shut off valve, countertop circuits, under cabinet lighting. 5 led, ic recessed lights. | $60,000 |
| Nov 10, 2020 | Completed final sign-off Jan 2023 | 70 Ina Ct | 2nd floor: remodel kitchen, bathroom, sunroom, existing deck, voluntary structural strengthening, new windows and door at sunroom.Details
2nd floor: remodel kitchen, bathroom, sunroom, existing deck, voluntary structural strengthening, new windows and door at sunroom. | $130,000 |
| Jul 7, 2017 | Completed final sign-off Jul 2019 | 2105 Jackson St | kitchen remodel 1st fl, replace cabinets, upgrade electric, replace walls, (membrane) windows not visible, doors, tile floorDetails
kitchen remodel 1st fl, replace cabinets, upgrade electric, replace walls, (membrane) windows not visible, doors, tile floor | $30,000 |
| Jan 3, 2012 | Completed final sign-off Jun 2012 | 45 Alvarado St | final inspection for pa#200310238368 remodel kitchen/bathDetails
final inspection for pa#200310238368 remodel kitchen/bath | |
| Jul 31, 2003 | Completed final sign-off Nov 2003 | 269 23rd Av | kitchen remodel,no structural work. upgrade electric for dishwasher,new kitch cabinets,shtrk,rewireDetails
kitchen remodel,no structural work. upgrade electric for dishwasher,new kitch cabinets,shtrk,rewire | $14,480 |