Back to bathroom remodel contractors
John Herman Gruninger Iii
- Based in
- Berkeley
- On San Francisco permits
- Mar 2000 to Feb 2026
- Last 24 months
- 2 permits filed
37 permits since 2000: 32 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2026 | Completed final sign-off May 2026 | 714 46th Av | remodel existing bathroom with new shower stall, tub, vanity sink, new inwall toilet moved 3" away from wall to meet code, new vent fan to exhaust 3' from property line, new tile finishes, no change in plumbing fixture count, no wall demolition, no wall constructionDetails
remodel existing bathroom with new shower stall, tub, vanity sink, new inwall toilet moved 3" away from wall to meet code, new vent fan to exhaust 3' from property line, new tile finishes, no change in plumbing fixture count, no wall demolition, no wall construction | $35,000 |
| Nov 10, 2020 | Completed final sign-off Jan 2023 | 70 Ina Ct | 2nd floor: remodel kitchen, bathroom, sunroom, existing deck, voluntary structural strengthening, new windows and door at sunroom.Details
2nd floor: remodel kitchen, bathroom, sunroom, existing deck, voluntary structural strengthening, new windows and door at sunroom. | $130,000 |
| Feb 29, 2012 | Completed final sign-off May 2012 | 511 Scott St | remodel master bath. move sink and add sconces. revise (e) tub, add pressure balance valve. tile on walls and floor. move toilet. no walls or openings will be moved or changed.Details
remodel master bath. move sink and add sconces. revise (e) tub, add pressure balance valve. tile on walls and floor. move toilet. no walls or openings will be moved or changed. | $15,000 |
| Jan 3, 2012 | Completed final sign-off Jun 2012 | 45 Alvarado St | final inspection for pa#200310238368 remodel kitchen/bathDetails
final inspection for pa#200310238368 remodel kitchen/bath | |
| Jan 3, 2012 | Completed final sign-off Jun 2012 | 47 Alvarado St | final inspection for pa#200408161661 add 1/2 bathDetails
final inspection for pa#200408161661 add 1/2 bath |