Block 1410, lot 014
269 23rd Ave
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 21, 2022 | Completed final sign-off May 2022 | 269 23rd Av | Ace Roofing East Bay | reroofingDetails
reroofing | $12,800 |
| Jun 29, 2021 | Completed final sign-off Aug 2021 | 267 23rd Av | to comply with physical inspection report #cc-8494Details
to comply with physical inspection report #cc-8494 | $500 | |
| Mar 11, 2021 | Completed final sign-off Jul 2021 | 269 23rd Av | Untitled Labs Inc Dba Made Renovation | ground floor: remodel 15 sq ft water closet & 34 sq ft watercloset: new toilet new vanity/ 1/2 bath. new tub/shower new vanity. all new fixtures. layout changes no structural. no changes to opening.Details
ground floor: remodel 15 sq ft water closet & 34 sq ft watercloset: new toilet new vanity/ 1/2 bath. new tub/shower new vanity. all new fixtures. layout changes no structural. no changes to opening. | $14,500 |
| Mar 11, 2021 | Completed final sign-off Jul 2021 | 267 23rd Av | Untitled Labs Inc Dba Made Renovation | 2nd floor: remodel 15 sq ft water closet & 34 sq ft 1/2 bath watercloset: new toilet new vanity/ 1/2 bath: new tub/shower new tub/shower new vanity. all new fixtures. layout changes no structural. no changes to opening. all new fixtures replacement.Details
2nd floor: remodel 15 sq ft water closet & 34 sq ft 1/2 bath watercloset: new toilet new vanity/ 1/2 bath: new tub/shower new tub/shower new vanity. all new fixtures. layout changes no structural. no changes to opening. all new fixtures replacement. | $14,500 |
| Dec 31, 2020 | Completed final sign-off Aug 2021 | 267 23rd Av | Gil Construction & Assoc Inc. | convert (e) closet to powder roomDetails
convert (e) closet to powder room | $13,000 |
| Dec 28, 2020 | Completed final sign-off Aug 2021 | 267 23rd Av | Gil Construction & Assoc Inc. | revision to 202012080465. no bath remodels at this timeDetails
revision to 202012080465. no bath remodels at this time | |
| Dec 8, 2020 | Completed final sign-off Aug 2021 | 267 23rd Av | Gil Construction & Assoc Inc. | unit #267 & 269: bathroom remodel in-kind. new tile, cabinets, vanity, sink, shower, etc. unit #269: remodel kitchen in kind, new tile, floors, sink, etc. no moving walls, new fixtures, new counters.Details
unit #267 & 269: bathroom remodel in-kind. new tile, cabinets, vanity, sink, shower, etc. unit #269: remodel kitchen in kind, new tile, floors, sink, etc. no moving walls, new fixtures, new counters. | $80,000 |
| May 22, 2017 | Completed final sign-off Oct 2017 | 267 23rd Av | remodel kitchen, new cabinets, appliances.Details
remodel kitchen, new cabinets, appliances. | $65,000 | |
| Jul 31, 2003 | Completed final sign-off Nov 2003 | 269 23rd Av | John Herman Gruninger Iii | kitchen remodel,no structural work. upgrade electric for dishwasher,new kitch cabinets,shtrk,rewireDetails
kitchen remodel,no structural work. upgrade electric for dishwasher,new kitch cabinets,shtrk,rewire | $14,480 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gil Construction & Assoc Inc. (3), Untitled Labs Inc Dba Made Renovation (2), Ace Roofing East Bay, John Herman Gruninger Iii
- Architects
- Michael Schulte
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.