Back to kitchen remodel contractors
J C Builders
- Based in
- Berkeley
- On San Francisco permits
- Sep 2007 to Feb 2026
- Last 24 months
- 1 permit filed
33 permits since 2000: 21 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 3 completed, 1 never finaled, 2 expired or cancelled. Typically 58 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2019 | Expired or cancelled expired Feb 2025 | 2565 03rd St | ste 322: commercial ti non-structural. modify (e) production distribution space to commercial kitchen (no cooking at this facility). new ada restroom. mep under separate prmit.Details
ste 322: commercial ti non-structural. modify (e) production distribution space to commercial kitchen (no cooking at this facility). new ada restroom. mep under separate prmit. | $75,000 |
| Jul 21, 2017 | Expired or cancelled expired Feb 2025 | 529 Hayes St | remodeling an existing retail space: new light fixtures and minimal electrical work. new product storage room & kitchenette. new storefront. bathroom remodel.Details
remodeling an existing retail space: new light fixtures and minimal electrical work. new product storage room & kitchenette. new storefront. bathroom remodel. | $75,000 |
| Aug 16, 2016 | Completed final sign-off Mar 2017 | 2347 03rd St | change of use from a limited (b) restaurant to a full (a) restaurant. expanding existing restaurant into adjacent detail & manufacturing space. create an accessible reatroom & expand commercial kitchen space. n/a maher ordinanceDetails
change of use from a limited (b) restaurant to a full (a) restaurant. expanding existing restaurant into adjacent detail & manufacturing space. create an accessible reatroom & expand commercial kitchen space. n/a maher ordinance | $85,000 |
| May 12, 2015 | Completed final sign-off Jun 2016 | 1987 Oakdale Av | horizontal addition. add 202 sq ft horizontal extension to rear of residence. 1 bedroom, 1 kitchen, 1 bathroom. no vertical addition proposed.Details
horizontal addition. add 202 sq ft horizontal extension to rear of residence. 1 bedroom, 1 kitchen, 1 bathroom. no vertical addition proposed. | $85,000 |
| May 30, 2014 | Never finaled issued Jun 2014, no final | 1324 Fitzgerald Av | this permit is only for per planning code to establish commissary kitchen pursuant to section 226(c). separate construction permit under 201406027209Details
this permit is only for per planning code to establish commissary kitchen pursuant to section 226(c). separate construction permit under 201406027209 | |
| May 30, 2014 | Completed final sign-off Sep 2014 | 2565 03rd St | #337: modifying an existing food production space to create a commissary kitchen, office area, packing area. hood installation under separate permit. state of california reg no. 52362 (no sfdph).compliance with ord 155-13 not rquiredDetails
#337: modifying an existing food production space to create a commissary kitchen, office area, packing area. hood installation under separate permit. state of california reg no. 52362 (no sfdph).compliance with ord 155-13 not rquired | $35,000 |