Back to bathroom remodel contractors
J C Builders
- Based in
- Berkeley
- On San Francisco permits
- Sep 2007 to Feb 2026
- Last 24 months
- 1 permit filed
33 permits since 2000: 21 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 expired or cancelled. Typically 35 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2026 | Completed final sign-off Jun 2026 | 1840 16th Av | upper level -interior bathroom addition, no structural workDetails
upper level -interior bathroom addition, no structural work | $47,000 |
| Jul 21, 2017 | Expired or cancelled expired Feb 2025 | 529 Hayes St | remodeling an existing retail space: new light fixtures and minimal electrical work. new product storage room & kitchenette. new storefront. bathroom remodel.Details
remodeling an existing retail space: new light fixtures and minimal electrical work. new product storage room & kitchenette. new storefront. bathroom remodel. | $75,000 |
| Nov 3, 2016 | Completed final sign-off Aug 2017 | 28 Raleigh Av | interior renovation to an extg sfd. relocating non-conforming stairs to basement. adding bedroom and bathroom to lower level.Details
interior renovation to an extg sfd. relocating non-conforming stairs to basement. adding bedroom and bathroom to lower level. | $75,000 |
| May 12, 2015 | Completed final sign-off Jun 2016 | 1987 Oakdale Av | horizontal addition. add 202 sq ft horizontal extension to rear of residence. 1 bedroom, 1 kitchen, 1 bathroom. no vertical addition proposed.Details
horizontal addition. add 202 sq ft horizontal extension to rear of residence. 1 bedroom, 1 kitchen, 1 bathroom. no vertical addition proposed. | $85,000 |
| Nov 27, 2012 | Completed final sign-off Jul 2013 | 1347 Mcallister St | voluntary foundation under-pinning to increase ceiling height for an art studio & half bathroom in (e) basement roomDetails
voluntary foundation under-pinning to increase ceiling height for an art studio & half bathroom in (e) basement room | $14,300 |