Back to bathroom remodel contractors
I E General Const Inc
- Based in
- San Mateo
- On San Francisco permits
- Nov 2012 to Aug 2026
- Last 24 months
- 8 permits filed
69 permits since 2000: 48 completed, 8 in progress, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 25 completed, 1 in progress, 2 never finaled, 5 expired or cancelled. Typically 6 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 1031 Noriega St | interior remodel: convert existing ground floor stoarage to new habitable space with 2 bedrooms, 2 bathrooms, 1 mudroom and 1 family room. reconfigure 2nd floor. replace existing windows and add 2 skylights. replace & relocate exiting furnace and water heater & build new deck.Details
interior remodel: convert existing ground floor stoarage to new habitable space with 2 bedrooms, 2 bathrooms, 1 mudroom and 1 family room. reconfigure 2nd floor. replace existing windows and add 2 skylights. replace & relocate exiting furnace and water heater & build new deck. | $200,000 |
| Jun 21, 2024 | Completed final sign-off May 2026 | 15 Faxon Av | to comply with nov 201763735, 201930206, and 201931171. convert (e) basement to bedroom and bathroom on g/f. reconfigure (e) kitchen and bathroom on 2/f. build new deck at rear yard on 2/f.Details
to comply with nov 201763735, 201930206, and 201931171. convert (e) basement to bedroom and bathroom on g/f. reconfigure (e) kitchen and bathroom on 2/f. build new deck at rear yard on 2/f. | $80,000 |
| Aug 24, 2023 | Completed final sign-off Dec 2023 | 1214 48th Av | (1) kitchen and (1) bathroom remodel in kind: replace fixtures and tile work. no change in floor layout layout. no change in wall layout. no structural work.Details
(1) kitchen and (1) bathroom remodel in kind: replace fixtures and tile work. no change in floor layout layout. no change in wall layout. no structural work. | $20,000 |
| Oct 19, 2021 | Completed final sign-off Dec 2021 | 35 Russia Av | units e & l: each unit: remodel kitchen & 1 bathroom. relocate (e) panel for both unit. no alteration of wall. window & door.Details
units e & l: each unit: remodel kitchen & 1 bathroom. relocate (e) panel for both unit. no alteration of wall. window & door. | $60,000 |
| Feb 10, 2021 | Never finaled issued Feb 2021, no final | 969 Duncan St | remodel (e) kitchen and 2 bathrooms by replacing cabinets, tiles and fixtures. no change on floor plan.Details
remodel (e) kitchen and 2 bathrooms by replacing cabinets, tiles and fixtures. no change on floor plan. | $10,000 |
| Aug 20, 2020 | Completed final sign-off Oct 2020 | 35 Russia Av | unit k - remodel bathroom (30 sf) and kitchen (60 sf)in-kind. replace bathroom & kitchen fixtures. no walls movingDetails
unit k - remodel bathroom (30 sf) and kitchen (60 sf)in-kind. replace bathroom & kitchen fixtures. no walls moving | $3,000 |
| Jan 28, 2019 | Completed final sign-off Mar 2019 | 35 Russia Av | unit f: replace kitchen and fixture & countertop. replace bathroom fixture & tile. no change to existing floor plan. all work in unit f.Details
unit f: replace kitchen and fixture & countertop. replace bathroom fixture & tile. no change to existing floor plan. all work in unit f. | $10,000 |
| Dec 5, 2018 | Completed final sign-off Jun 2019 | 2425 24th St | revision to pa #201809130014. 2nd fl reconfigure #2427 - convert living room to bedroom, remodel kitchen & bath. 3rd fl (#2425) add (1) new full bath.Details
revision to pa #201809130014. 2nd fl reconfigure #2427 - convert living room to bedroom, remodel kitchen & bath. 3rd fl (#2425) add (1) new full bath. | $50,000 |
| Dec 3, 2018 | Completed final sign-off Nov 2019 | 178 Brighton Av | 2nd floor: remove (e) interior stair to garage. add shower to master bath, infill existing lightwell with new skylight & fire rated proerty line windowDetails
2nd floor: remove (e) interior stair to garage. add shower to master bath, infill existing lightwell with new skylight & fire rated proerty line window | $5,000 |
| Sep 4, 2018 | Completed final sign-off Nov 2019 | 178 Brighton Av | remodel 1st floor to new living space & remodel 2nd floors including kitchen & bathroom; new skylight, infill (3) stair lightwell and new entrance door @ 1st floor.Details
remodel 1st floor to new living space & remodel 2nd floors including kitchen & bathroom; new skylight, infill (3) stair lightwell and new entrance door @ 1st floor. | $99,000 |
| Aug 14, 2018 | Never finaled issued Aug 2018, no final | 210 Broderick St | reconfigure unit #4 to add one new bedroom and one new bathroomDetails
reconfigure unit #4 to add one new bedroom and one new bathroom | $70,000 |
| Jun 19, 2018 | Completed final sign-off Oct 2018 | 1589 Sacramento St | interior remodel at unit #3: add one new bath and laundry, relocate existing kitchen & bathroom.Details
interior remodel at unit #3: add one new bath and laundry, relocate existing kitchen & bathroom. | $45,000 |
| Mar 6, 2018 | Completed final sign-off Jul 2018 | 195 Ledyard St | convert (e) bath into 2 new baths on 1st. reconfigure 1st flr layout, relocate w/h & furnance, reconfigure master bedroom & bath, remodel kitchen and bath and add laundry rm on 2nd flrDetails
convert (e) bath into 2 new baths on 1st. reconfigure 1st flr layout, relocate w/h & furnance, reconfigure master bedroom & bath, remodel kitchen and bath and add laundry rm on 2nd flr | $50,000 |
| Feb 28, 2018 | Completed final sign-off Sep 2018 | 35 Russia Av | unit #d: bathroom and kitchen remodel in kind. replace fixtures and install new tiles, new laminate flooring. no change in layout. maher n/aDetails
unit #d: bathroom and kitchen remodel in kind. replace fixtures and install new tiles, new laminate flooring. no change in layout. maher n/a | $10,000 |
| Sep 21, 2017 | Completed final sign-off Jul 2018 | 141 Lexington St | reconfigure interior layout on 2nd and 3rd fl per plan. keeping (e) bathrooms on 2nd & 3rd floor per plan.Details
reconfigure interior layout on 2nd and 3rd fl per plan. keeping (e) bathrooms on 2nd & 3rd floor per plan. | $40,000 |
| Mar 17, 2017 | Expired or cancelled withdrawn Jul 2017 | 65 San Pablo Av | remodel masternedroom and bath. relocate one full bathroom. remodel kitchen an 2nd flr. convert (e) storage to a master bedroom and bath in basement, relocate furnance & wh in basementDetails
remodel masternedroom and bath. relocate one full bathroom. remodel kitchen an 2nd flr. convert (e) storage to a master bedroom and bath in basement, relocate furnance & wh in basement | $40,000 |
| Jan 20, 2017 | Completed final sign-off May 2017 | 2429 24th St | ground floor: revision to app#201612195339: 1) relocate bathroom. 2)relocate bedroom. 3)remove nonbearing wall and convert bedroom to living room.Details
ground floor: revision to app#201612195339: 1) relocate bathroom. 2)relocate bedroom. 3)remove nonbearing wall and convert bedroom to living room. | |
| Jan 11, 2017 | Completed final sign-off Jun 2018 | 31 Leese St | #2 & #5- bathroom remodel, no structural work, total 2 bathrooms.Details
#2 & #5- bathroom remodel, no structural work, total 2 bathrooms. | $20,000 |
| Dec 19, 2016 | Completed final sign-off May 2017 | 2429 24th St | g/f: rev pa#201611142614: relocate (e) bathroom, relocate bedroom & convert bedroom to living room;Details
g/f: rev pa#201611142614: relocate (e) bathroom, relocate bedroom & convert bedroom to living room; | $20,000 |
| Nov 14, 2016 | Expired or cancelled expired Jul 2019 | 2429 24th St | one kitchen and one bathroom remodel. non structuralDetails
one kitchen and one bathroom remodel. non structural | $10,000 |
| May 9, 2016 | Completed final sign-off Jul 2016 | 35 Russia Av | kitchen and bathroom remodel on unit #b and #p. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
kitchen and bathroom remodel on unit #b and #p. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $30,000 |
| Mar 2, 2016 | Completed final sign-off Nov 2016 | 3123 San Jose Av | add 2 playrooms and 1 storage. relocate one bathroom on 1st floor. relocate w/h & furnace; replace (e) deck with (n) landing; replace (e) doors at rear on 2nd flr with (n) door and window, replace (e) windows at rear on 1st floor.Details
add 2 playrooms and 1 storage. relocate one bathroom on 1st floor. relocate w/h & furnace; replace (e) deck with (n) landing; replace (e) doors at rear on 2nd flr with (n) door and window, replace (e) windows at rear on 1st floor. | $30,000 |
| Dec 7, 2015 | Completed final sign-off Oct 2016 | 2427 24th St | revision to pa #201508194682 - comply w/nov #201582421: remove all plaster & replace w/new sheetrock. replace new tankless water heater. add two new furnace. remodel bathrooms & kitchens. convert storage to laundry for #2429. repair/replace front port of stairs in kind.Details
revision to pa #201508194682 - comply w/nov #201582421: remove all plaster & replace w/new sheetrock. replace new tankless water heater. add two new furnace. remodel bathrooms & kitchens. convert storage to laundry for #2429. repair/replace front port of stairs in kind. | $85,000 |
| Sep 24, 2015 | Expired or cancelled expired Jan 2017 | 35 Russia Av | 2nd & 3rd flr -units m & j: kitchen and bath remodelDetails
2nd & 3rd flr -units m & j: kitchen and bath remodel | $20,000 |
| Aug 19, 2015 | Expired or cancelled expired Jul 2019 | 2427 24th St | kitchen & bathroom remodel. no structural work.Details
kitchen & bathroom remodel. no structural work. | $20,000 |
| Jul 21, 2015 | Completed final sign-off Oct 2015 | 1177 California St | #1214 - replace kitchen & bath cabinets, countertop, fixtures, appliances, & floor finishes. add shut off valves at kitchen & bathrooms. replace light fixtrues, & add light fixture in living room. comply with cec 150.0(k) 5.Details
#1214 - replace kitchen & bath cabinets, countertop, fixtures, appliances, & floor finishes. add shut off valves at kitchen & bathrooms. replace light fixtrues, & add light fixture in living room. comply with cec 150.0(k) 5. | $50,000 |
| Apr 30, 2015 | Completed final sign-off Jul 2016 | 3295 Mission St | comply with nov 201540921 enlarge existing bathrm new ada bath, remodel small bath. relocate existing rear door to center line. not visible from streetDetails
comply with nov 201540921 enlarge existing bathrm new ada bath, remodel small bath. relocate existing rear door to center line. not visible from street | $40,000 |
| Oct 23, 2014 | Completed final sign-off Apr 2015 | 2587 37th Av | add 2 bedrooms and 2 baths on the 1st fl (696 sq ft) relocate water heater and furnaceDetails
add 2 bedrooms and 2 baths on the 1st fl (696 sq ft) relocate water heater and furnace | $20,000 |
| Oct 6, 2014 | Expired or cancelled cancelled Jan 2020 | 277 Shipley St | unit legalization ordinance# 43-14. legalize unit f @ basement with 1 bedroom, 1 bathroom & 1 kitchen @ basement. ** maher: compliance with ordinance no# 155-13 not required **Details
unit legalization ordinance# 43-14. legalize unit f @ basement with 1 bedroom, 1 bathroom & 1 kitchen @ basement. ** maher: compliance with ordinance no# 155-13 not required ** | $300 |
| Oct 6, 2014 | Completed final sign-off Jan 2016 | 371 Staples Av | unit legalization ordinance# 43-14. legalize 2 bedrooms, 1 bathroom & 1 kitchen in-law unit @ ground floor.Details
unit legalization ordinance# 43-14. legalize 2 bedrooms, 1 bathroom & 1 kitchen in-law unit @ ground floor. | $7,850 |
| Aug 18, 2014 | Completed final sign-off Apr 2015 | 1589 Sacramento St | interior remodel for unit 4 & 5. relocate bathrooms for both units. relocate kitchen for unit 4Details
interior remodel for unit 4 & 5. relocate bathrooms for both units. relocate kitchen for unit 4 | $20,000 |
| May 9, 2014 | Completed final sign-off Jun 2015 | 1414 44th Av | add 1 play room and 1 bathroom at first level.Details
add 1 play room and 1 bathroom at first level. | $20,000 |
| Nov 20, 2012 | Completed final sign-off Sep 2018 | 1935 34th Av | rear addition on first floor, two bedrooms. to comply w/ nov #200235444 to legalize a bathroom and family room at first floor.Details
rear addition on first floor, two bedrooms. to comply w/ nov #200235444 to legalize a bathroom and family room at first floor. | $30,000 |