Block 6980, lot 038
178 Brighton Ave
- City’s use
- Single Family Residential
- Built
- 1967
- Stories
- 1
- Units
- 1
- Rooms
- 5 bedrooms, 4 bathrooms
- Building
- 2,393 sq ft
- Lot
- 2,809 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2018 | Completed final sign-off Nov 2019 | 178 Brighton Av | I E General Const Inc | 2nd floor: remove (e) interior stair to garage. add shower to master bath, infill existing lightwell with new skylight & fire rated proerty line windowDetails
2nd floor: remove (e) interior stair to garage. add shower to master bath, infill existing lightwell with new skylight & fire rated proerty line window | $5,000 |
| Sep 4, 2018 | Completed final sign-off Nov 2019 | 178 Brighton Av | I E General Const Inc | remodel 1st floor to new living space & remodel 2nd floors including kitchen & bathroom; new skylight, infill (3) stair lightwell and new entrance door @ 1st floor.Details
remodel 1st floor to new living space & remodel 2nd floors including kitchen & bathroom; new skylight, infill (3) stair lightwell and new entrance door @ 1st floor. | $99,000 |
| Jul 3, 2018 | Expired or cancelled cancelled Jan 2026 | 178 Brighton Av | existing kitchen & bathroom remodel. no structural work. everything in the same location.Details
existing kitchen & bathroom remodel. no structural work. everything in the same location. | $20,000 | |
| Mar 19, 2009 | Completed final sign-off May 2009 | 178 Brighton Av | City Homes Construction Inc | remodel kitchen - replace counter, flooring & plumbing, wiring, lights, cabinets, sheetrock.Details
remodel kitchen - replace counter, flooring & plumbing, wiring, lights, cabinets, sheetrock. | $9,200 |
| Nov 1, 2006 | Expired or cancelled cancelled Apr 2012 | 178 Brighton Av | construction of (n) 3rd floor that includes a master bedroom, study room, family room, master bathroom w/walk-in closet. front horizontal addition to create bigger area for dining & kitchen areas at (e) 1st & 2nd floors.Details
construction of (n) 3rd floor that includes a master bedroom, study room, family room, master bathroom w/walk-in closet. front horizontal addition to create bigger area for dining & kitchen areas at (e) 1st & 2nd floors. | $85,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.