I E General Const Inc
- Based in
- San Mateo
- On San Francisco permits
- Nov 2012 to Aug 2026
- Last 24 months
- 8 permits filed
69 permits since 2000: 48 completed, 8 in progress, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 in progress. Typically 97 days from filing to permit and 511 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 1031 Noriega St | interior remodel: convert existing ground floor stoarage to new habitable space with 2 bedrooms, 2 bathrooms, 1 mudroom and 1 family room. reconfigure 2nd floor. replace existing windows and add 2 skylights. replace & relocate exiting furnace and water heater & build new deck.Details
interior remodel: convert existing ground floor stoarage to new habitable space with 2 bedrooms, 2 bathrooms, 1 mudroom and 1 family room. reconfigure 2nd floor. replace existing windows and add 2 skylights. replace & relocate exiting furnace and water heater & build new deck. | $200,000 |
| Jun 21, 2024 | Completed final sign-off May 2026 | 15 Faxon Av | to comply with nov 201763735, 201930206, and 201931171. convert (e) basement to bedroom and bathroom on g/f. reconfigure (e) kitchen and bathroom on 2/f. build new deck at rear yard on 2/f.Details
to comply with nov 201763735, 201930206, and 201931171. convert (e) basement to bedroom and bathroom on g/f. reconfigure (e) kitchen and bathroom on 2/f. build new deck at rear yard on 2/f. | $80,000 |
| Mar 2, 2016 | Completed final sign-off Nov 2016 | 3123 San Jose Av | add 2 playrooms and 1 storage. relocate one bathroom on 1st floor. relocate w/h & furnace; replace (e) deck with (n) landing; replace (e) doors at rear on 2nd flr with (n) door and window, replace (e) windows at rear on 1st floor.Details
add 2 playrooms and 1 storage. relocate one bathroom on 1st floor. relocate w/h & furnace; replace (e) deck with (n) landing; replace (e) doors at rear on 2nd flr with (n) door and window, replace (e) windows at rear on 1st floor. | $30,000 |
| Oct 30, 2015 | Completed final sign-off May 2021 | 331 Pennsylvania Av | change use from institution to residential. add rear deck & carport. demolition of all interior non-load bearing partition walls,all plumbing fixtures to be removed, interior structural walls and supports to be exposed,Details
change use from institution to residential. add rear deck & carport. demolition of all interior non-load bearing partition walls,all plumbing fixtures to be removed, interior structural walls and supports to be exposed, | $50,000 |