Huff Construction Company Inc
- Based in
- San Franciso
- On San Francisco permits
- May 2008 to Aug 2026
- Last 24 months
- 4 permits filed
119 permits since 2000: 93 completed, 16 never finaled, 10 expired or cancelled.
Of the 16 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 9 completed, 2 never finaled. Typically 11 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2024 | Completed final sign-off Sep 2024 | 734 Vermont St | to repair leaks at e) roof decks. finishes will be removed & new waterproofing membrance will be installed. new 42" tall, 1-hr rated firewall to be install at property line on decks. e) rails & stairs to be made code complaint. extending roofing 2nd & 3rd fl roof decksDetails
to repair leaks at e) roof decks. finishes will be removed & new waterproofing membrance will be installed. new 42" tall, 1-hr rated firewall to be install at property line on decks. e) rails & stairs to be made code complaint. extending roofing 2nd & 3rd fl roof decks | $49,000 |
| Jan 23, 2024 | Completed final sign-off Apr 2024 | 111 Ripley St | reconfigure upper and lower risers to conform with current code requirements. work to be done on interior stairs.Details
reconfigure upper and lower risers to conform with current code requirements. work to be done on interior stairs. | $35,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2025 | 527 29th St | convert (e) attic into (n) conditional space 3rd story w/ 2 bedrooms, 1 bath, 1 powder rm, 2 (n) interior stairs connecting (n) 3rd story to (e) 2nd story. 3 (n) heat pump space heating, 3 (n) domers on (e) pitched roof. adding 497 sf in converted attic.Details
convert (e) attic into (n) conditional space 3rd story w/ 2 bedrooms, 1 bath, 1 powder rm, 2 (n) interior stairs connecting (n) 3rd story to (e) 2nd story. 3 (n) heat pump space heating, 3 (n) domers on (e) pitched roof. adding 497 sf in converted attic. | $80,000 |
| Jul 8, 2022 | Completed final sign-off Nov 2023 | 1234 Stanyan St | interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration.Details
interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration. | $329,000 |
| May 3, 2018 | Never finaled issued May 2018, no final | 385 Maynard St | repair in kind entry stairs, repair stucco and dry rot @ exterior front wall, less than 50%.Details
repair in kind entry stairs, repair stucco and dry rot @ exterior front wall, less than 50%. | $7,500 |
| Apr 30, 2018 | Completed final sign-off Apr 2020 | 459 Ashbury St | repair in kind entry stairs, entry deck & ballustrade. in stall (n) wp'ing membrane, remove (e) drywall in garage & replaceDetails
repair in kind entry stairs, entry deck & ballustrade. in stall (n) wp'ing membrane, remove (e) drywall in garage & replace | |
| Aug 9, 2013 | Completed final sign-off Apr 2014 | 922 Alabama St | projoect scope includes partially renovating level 2 and add 2 bedrooms and 2 baths at level 1. filling in under existing non complying upper floor area. new low-e double pane glass windows added to rear and side elevations. existing exterior deck/stair modified and relocatedDetails
projoect scope includes partially renovating level 2 and add 2 bedrooms and 2 baths at level 1. filling in under existing non complying upper floor area. new low-e double pane glass windows added to rear and side elevations. existing exterior deck/stair modified and relocated | $140,000 |
| Oct 29, 2012 | Completed final sign-off Feb 2013 | 1022 Powell St | change pocket doors to swinging doors, change stair railing to ponywall aith new handrail, repl drywall @bedrm ceilings & add insulation, repl framing in kind @ laundry rm, repl damage framing @ guest bedrmDetails
change pocket doors to swinging doors, change stair railing to ponywall aith new handrail, repl drywall @bedrm ceilings & add insulation, repl framing in kind @ laundry rm, repl damage framing @ guest bedrm | $4,500 |
| Jan 27, 2012 | Never finaled issued Apr 2012, no final | 570 16th Av | the scope of work is limited to an exterior addition of a front entry stair and coverting a first floor window to an entry door.Details
the scope of work is limited to an exterior addition of a front entry stair and coverting a first floor window to an entry door. | $25,000 |
| Jun 10, 2010 | Completed final sign-off Jun 2010 | 233 Missouri St | repair fire damage at front porch an stairs to comply with nov 201051246Details
repair fire damage at front porch an stairs to comply with nov 201051246 | $500 |
| Aug 22, 2008 | Completed final sign-off Feb 2009 | 2378 Folsom St | removing (e) rear fire escape and providing new rear exit stair.Details
removing (e) rear fire escape and providing new rear exit stair. | $30,000 |