Back to bathroom remodel contractors
Huff Construction Company Inc
- Based in
- San Franciso
- On San Francisco permits
- May 2008 to Aug 2026
- Last 24 months
- 4 permits filed
119 permits since 2000: 93 completed, 16 never finaled, 10 expired or cancelled.
Of the 16 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
41 bathroom remodel permits: 34 completed, 4 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | Completed final sign-off Oct 2026 | 1234 Stanyan St | new bathroom addition at basement. new bar sink.Details
new bathroom addition at basement. new bar sink. | $40,000 |
| Jun 20, 2024 | Expired or cancelled expired Nov 2025 | 341 Hugo St | revision to permit 202209011716. 1/f: reconfigure utility room and kitchen counter. relocate toilet. 2/f: reconfigure bathroom, fill in lightwell, remove closet. 3/f: reconfigure closet in master suite bedroom.Details
revision to permit 202209011716. 1/f: reconfigure utility room and kitchen counter. relocate toilet. 2/f: reconfigure bathroom, fill in lightwell, remove closet. 3/f: reconfigure closet in master suite bedroom. | $30,000 |
| Apr 17, 2024 | Completed final sign-off Apr 2025 | 527 29th St | remodel (2) existing bathrooms with new fixtures and finishes. one bath on 1/f and one bath on 2/f. non structural remodel. remodel in-kind.Details
remodel (2) existing bathrooms with new fixtures and finishes. one bath on 1/f and one bath on 2/f. non structural remodel. remodel in-kind. | $39,000 |
| Sep 28, 2023 | Completed final sign-off Apr 2024 | 111 Ripley St | kitchen remodel. new cabinets, countertops, appliances, plumbing, and lighting fixtures. partial remodel of primary bathroom including new vanity and sink/faucets. new sconces, remodel of 3 gas burning fireplaces, some cabinetry to be replaced with drywall. new flooring.Details
kitchen remodel. new cabinets, countertops, appliances, plumbing, and lighting fixtures. partial remodel of primary bathroom including new vanity and sink/faucets. new sconces, remodel of 3 gas burning fireplaces, some cabinetry to be replaced with drywall. new flooring. | $80,000 |
| Apr 10, 2023 | Expired or cancelled withdrawn May 2024 | 1160 Bryant St | bathroom remodel replace plumbing, electrical fixtures in kind new drywall and tile no moving of wallsDetails
bathroom remodel replace plumbing, electrical fixtures in kind new drywall and tile no moving of walls | $10,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2025 | 527 29th St | convert (e) attic into (n) conditional space 3rd story w/ 2 bedrooms, 1 bath, 1 powder rm, 2 (n) interior stairs connecting (n) 3rd story to (e) 2nd story. 3 (n) heat pump space heating, 3 (n) domers on (e) pitched roof. adding 497 sf in converted attic.Details
convert (e) attic into (n) conditional space 3rd story w/ 2 bedrooms, 1 bath, 1 powder rm, 2 (n) interior stairs connecting (n) 3rd story to (e) 2nd story. 3 (n) heat pump space heating, 3 (n) domers on (e) pitched roof. adding 497 sf in converted attic. | $80,000 |
| Jul 8, 2022 | Completed final sign-off Nov 2023 | 1234 Stanyan St | interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration.Details
interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration. | $329,000 |
| Sep 8, 2020 | Completed final sign-off Mar 2021 | 3813 24th St | tenant improvement for formula retail children's instructional service. no structural work, no changes to facade. demolition and replacement of existing finishes and partitions. ada upgrades at entry and bathroom.Details
tenant improvement for formula retail children's instructional service. no structural work, no changes to facade. demolition and replacement of existing finishes and partitions. ada upgrades at entry and bathroom. | $40,000 |
| Jul 9, 2019 | Completed final sign-off Oct 2020 | 2472 15th Av | remodel g/f. relocate of (e) bathroom & laundry. no removal/modification to structural bearing walls or structural framing.Details
remodel g/f. relocate of (e) bathroom & laundry. no removal/modification to structural bearing walls or structural framing. | $35,000 |
| Jun 14, 2019 | Completed final sign-off Jan 2020 | 2325 03rd St | revision to pa 2018-0226-2265 and constructionof full heig walls at the entry and existing bathroom sink area to create a lactation room in suite 205Details
revision to pa 2018-0226-2265 and constructionof full heig walls at the entry and existing bathroom sink area to create a lactation room in suite 205 | |
| Apr 9, 2018 | Completed final sign-off Sep 2018 | 2080 03rd St | unit 5: interior remodel of kitchen, (1) full bathroom & (1) powder room, new cabinets, countertops, plubming fixtures to be installed, new tile/new led light fixtures installed.Details
unit 5: interior remodel of kitchen, (1) full bathroom & (1) powder room, new cabinets, countertops, plubming fixtures to be installed, new tile/new led light fixtures installed. | $25,000 |
| Jan 16, 2018 | Completed final sign-off Apr 2018 | 2419 03rd St | ground floor - demolition of interior partition walls & one bathroom. no structural or exteriro work per ab-017. n/a maher ordinanceDetails
ground floor - demolition of interior partition walls & one bathroom. no structural or exteriro work per ab-017. n/a maher ordinance | $507 |
| Dec 21, 2017 | Completed final sign-off Dec 2018 | 2419 03rd St | change of use from f-2 to a-2. ground floor - interior tenant improvement for new restaurant space will be limited to new mezzanine, commercial ktichen, bar, bathrooms & storage. no exterior work. n/a maher ordinanceDetails
change of use from f-2 to a-2. ground floor - interior tenant improvement for new restaurant space will be limited to new mezzanine, commercial ktichen, bar, bathrooms & storage. no exterior work. n/a maher ordinance | $316,890 |
| Aug 3, 2017 | Never finaled issued Aug 2017, no final | 1238 Stanyan St | remodel & reconfigure (e) master bathroom, per plans.Details
remodel & reconfigure (e) master bathroom, per plans. | $25,000 |
| Jul 21, 2017 | Never finaled issued Jul 2017, no final | 1238 Stanyan St | remodel one bathroom on ground floor, new fixtures and finishes. remodel one bathroom one 2nd floor, remove shower and add tub, remodel kitchen new cabinets and countertops. all new lighting to be led.Details
remodel one bathroom on ground floor, new fixtures and finishes. remodel one bathroom one 2nd floor, remove shower and add tub, remodel kitchen new cabinets and countertops. all new lighting to be led. | $60,000 |
| Jan 30, 2017 | Completed final sign-off May 2017 | 2920 Buchanan St | unit #7: remodel of existing bathroom, new fixtures and finishes, led lighting.Details
unit #7: remodel of existing bathroom, new fixtures and finishes, led lighting. | $22,000 |
| Nov 30, 2016 | Completed final sign-off Dec 2016 | 719 36th Av | change scope of work for permit 201601278126. eliminate and remodel of existng bathroom on 3rd floor. keep existing bathroom as is.Details
change scope of work for permit 201601278126. eliminate and remodel of existng bathroom on 3rd floor. keep existing bathroom as is. | |
| Aug 1, 2016 | Completed final sign-off Dec 2016 | 180 Lippard Av | bathroom addition with walk-in shower, vanity and toilet on 2nd flr. adding new doors at 2nd flr bedroom.Details
bathroom addition with walk-in shower, vanity and toilet on 2nd flr. adding new doors at 2nd flr bedroom. | $25,000 |
| Jun 27, 2016 | Completed final sign-off Oct 2016 | 2243 Green St | bathroom remodel with new fixtures and finishes upgrades at kitchen, new countertop, sink, back splashDetails
bathroom remodel with new fixtures and finishes upgrades at kitchen, new countertop, sink, back splash | $30,000 |
| Jan 27, 2016 | Completed final sign-off Dec 2016 | 719 36th Av | demo (e) elevator, in-fill elevator pit, add a powder room on 2nd floor, remodel (e) bath on 3rd floorDetails
demo (e) elevator, in-fill elevator pit, add a powder room on 2nd floor, remodel (e) bath on 3rd floor | $30,000 |
| Dec 16, 2015 | Completed final sign-off Jun 2016 | 1446 15th Av | add bathroom and home office on ground floor.Details
add bathroom and home office on ground floor. | $20,000 |
| Jun 3, 2015 | Completed final sign-off Oct 2015 | 2112 23rd St | renovation kitchen & bathroom @ 2nd floor & other parts of living areas per plan.Details
renovation kitchen & bathroom @ 2nd floor & other parts of living areas per plan. | $40,000 |
| May 1, 2015 | Completed final sign-off Jun 2016 | 3359 26th St | interior remodel of the residential unit: kitchen remodel, bathroom, and powder room remodel. new bathroom, reconfigure non-bearing walls on 2nd floor only.Details
interior remodel of the residential unit: kitchen remodel, bathroom, and powder room remodel. new bathroom, reconfigure non-bearing walls on 2nd floor only. | $55,000 |
| Feb 3, 2015 | Completed final sign-off Oct 2015 | 88 King St | remodel kitchen & 1 bathroomDetails
remodel kitchen & 1 bathroom | $25,000 |
| Jan 16, 2015 | Completed final sign-off Mar 2015 | 1049 Dolores St | remodel existing bath. new fixtures, tiles. remove wall between lving room and kitchen. no structural workDetails
remodel existing bath. new fixtures, tiles. remove wall between lving room and kitchen. no structural work | $15,000 |
| Jan 9, 2015 | Completed final sign-off Mar 2015 | 1568 Union St | guest bathroom remodel- new, tub, toilet, vanity, sink, faucet, tile work, new led lighting.Details
guest bathroom remodel- new, tub, toilet, vanity, sink, faucet, tile work, new led lighting. | $12,000 |
| Oct 23, 2014 | Completed final sign-off Jan 2015 | 1568 Union St | #203: bathroom remodel - change tub to shower, new vanity, sink, faucet, tile work. new led lighting.Details
#203: bathroom remodel - change tub to shower, new vanity, sink, faucet, tile work. new led lighting. | $17,000 |
| May 30, 2014 | Completed final sign-off Jul 2014 | 2920 Buchanan St | unit 5 - bathroom remodel - change tub to walk-in shower, new toilets tile work, new light fixture occupancy switch. to comply with cec150k 10Details
unit 5 - bathroom remodel - change tub to walk-in shower, new toilets tile work, new light fixture occupancy switch. to comply with cec150k 10 | $9,500 |
| Dec 4, 2013 | Completed final sign-off Apr 2014 | 88 King St | unit 607. remodel kitchen & two bathrooms, no structural work, no wall removal or modificationDetails
unit 607. remodel kitchen & two bathrooms, no structural work, no wall removal or modification | $18,000 |
| Sep 16, 2013 | Completed final sign-off Apr 2014 | 1812 Scott St | residential interior remodel limited to an extg kitchen and new bathroom. renovation includes new lighting and plmg fixtures.Details
residential interior remodel limited to an extg kitchen and new bathroom. renovation includes new lighting and plmg fixtures. | $40,000 |
| Aug 9, 2013 | Completed final sign-off Apr 2014 | 922 Alabama St | projoect scope includes partially renovating level 2 and add 2 bedrooms and 2 baths at level 1. filling in under existing non complying upper floor area. new low-e double pane glass windows added to rear and side elevations. existing exterior deck/stair modified and relocatedDetails
projoect scope includes partially renovating level 2 and add 2 bedrooms and 2 baths at level 1. filling in under existing non complying upper floor area. new low-e double pane glass windows added to rear and side elevations. existing exterior deck/stair modified and relocated | $140,000 |
| Jul 19, 2013 | Expired or cancelled expired Mar 2017 | 3131 Folsom St | bathroom remodel - new shower valve, shower head, tub spout, new vanity and top, tile work (e) tub and toilet to remain. change light fixture with occupancy sensors.Details
bathroom remodel - new shower valve, shower head, tub spout, new vanity and top, tile work (e) tub and toilet to remain. change light fixture with occupancy sensors. | $5,000 |
| Nov 5, 2012 | Completed final sign-off Jan 2013 | 2920 Buchanan St | remodel kitchen, add high efficency lighting. remodel bathroom, install occupancy sensors, existing exhaust fan to remain. add washer/dryer laundry - ventless dryer. tie into bathroom plumbing.Details
remodel kitchen, add high efficency lighting. remodel bathroom, install occupancy sensors, existing exhaust fan to remain. add washer/dryer laundry - ventless dryer. tie into bathroom plumbing. | $35,000 |
| Oct 9, 2012 | Completed final sign-off Feb 2013 | 33 Sotelo Av | remodel 2 bathrooms, replacing fixtures in kind, adding occupancy sensors, upgrading finishes, adding 2 fans. no change on walls.Details
remodel 2 bathrooms, replacing fixtures in kind, adding occupancy sensors, upgrading finishes, adding 2 fans. no change on walls. | $24,000 |
| Sep 7, 2012 | Completed final sign-off Feb 2013 | 1022 Powell St | remove of (2) bathrooms and (1) kitchen. (replace cabinets, countertops, appliances, bathroom fixtures). no new hood or exhaust fan. 50% of light in kitchen to be high efficacy. rpovide occupancy senor switch in bathrooms.Details
remove of (2) bathrooms and (1) kitchen. (replace cabinets, countertops, appliances, bathroom fixtures). no new hood or exhaust fan. 50% of light in kitchen to be high efficacy. rpovide occupancy senor switch in bathrooms. | $44,000 |
| Dec 15, 2011 | Never finaled issued Dec 2011, no final | 570 16th Av | interior remodel-replacing (e) kitchen & 2 bathrooms, replace windows, adding a new deck at rear at a height of less than 30" above (e) patioDetails
interior remodel-replacing (e) kitchen & 2 bathrooms, replace windows, adding a new deck at rear at a height of less than 30" above (e) patio | $150,000 |
| Jun 29, 2011 | Completed final sign-off Mar 2012 | 3176 17th St | building a 6 lane bowling alley, restaurant with commercial kitchen, 2 new bathrooms. sprinkler system & fire alarm system & ul300 suppression system under separate application.Details
building a 6 lane bowling alley, restaurant with commercial kitchen, 2 new bathrooms. sprinkler system & fire alarm system & ul300 suppression system under separate application. | $487,000 |
| Apr 19, 2011 | Completed final sign-off Mar 2012 | 3176 17th St | full seismic upgrade to (e) warehouse, demo of (e) mezzanine , reduce square footage of (e) mezzanine. add new bathrooms, no change of use on this permit. no change to exterior . existing entry doors to remain.Details
full seismic upgrade to (e) warehouse, demo of (e) mezzanine , reduce square footage of (e) mezzanine. add new bathrooms, no change of use on this permit. no change to exterior . existing entry doors to remain. | $150,000 |
| Jan 14, 2011 | Completed final sign-off Jun 2011 | 336 Juanita Wy | remodel 3rd floor master bedroom & bathroom, infill window at rear of bldg to match existing exterior finish.Details
remodel 3rd floor master bedroom & bathroom, infill window at rear of bldg to match existing exterior finish. | $25,000 |
| Nov 19, 2010 | Never finaled issued Nov 2010, no final | 820 Peru Av | reconfigure interior walls to allow larger bathroom, larger rear bedrooms and closets. update kitchen and bathroom. install new plumbing and electrical systemsDetails
reconfigure interior walls to allow larger bathroom, larger rear bedrooms and closets. update kitchen and bathroom. install new plumbing and electrical systems | $19,500 |
| Jan 6, 2009 | Completed final sign-off May 2009 | 6 Ord Ct | remodel kitchen & bath : new sink, toilet, & shower in bathroom w/new tile, light fixtures, paint & vanity, new cabinetry, sink, paint in kitchen.Details
remodel kitchen & bath : new sink, toilet, & shower in bathroom w/new tile, light fixtures, paint & vanity, new cabinetry, sink, paint in kitchen. | $30,000 |