Back to bathroom remodel contractors
Hubert Penny
- Based in
- Daly City
- On San Francisco permits
- Jul 2004 to Sep 2026
- Last 24 months
- 20 permits filed
178 permits since 2000: 160 completed, 8 in progress, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
93 bathroom remodel permits: 83 completed, 3 in progress, 4 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress filed Aug 2026, not yet issued | 1 Ora Wy | remodel one bathroom in kind, replace <50% of deck due to dry rot, install new recessed can lights in living room and bedroom.Details
remodel one bathroom in kind, replace <50% of deck due to dry rot, install new recessed can lights in living room and bedroom. | $22,500 |
| Aug 3, 2026 | In progress issued Aug 2026 | 1 Ora Wy | remodel (1) bathroom in kind. replace less than 50% of dry rot on deck. put in new recesed cans living, family, bedrooms.Details
remodel (1) bathroom in kind. replace less than 50% of dry rot on deck. put in new recesed cans living, family, bedrooms. | $22,500 |
| Jul 9, 2026 | Completed final sign-off Aug 2026 | 2802 Clay St | to remodel bathroom as is in kindDetails
to remodel bathroom as is in kind | $15,000 |
| Jun 10, 2026 | Completed final sign-off Aug 2026 | 73 Parker Av | to remodel 2 bathrooms in kind.Details
to remodel 2 bathrooms in kind. | $20,000 |
| Mar 9, 2026 | Completed final sign-off Apr 2026 | 1450 Green St | unit #1: to remodel shower in bathroomDetails
unit #1: to remodel shower in bathroom | $10,000 |
| Feb 24, 2026 | Completed final sign-off Jun 2026 | 619 28th Av | unit #3: to remodel (1) kitchen, (2) bathrooms and laundry, like for like.Details
unit #3: to remodel (1) kitchen, (2) bathrooms and laundry, like for like. | $50,000 |
| Feb 12, 2026 | Completed final sign-off Apr 2026 | 2116 Divisadero St | bathroom remodel in kindDetails
bathroom remodel in kind | $20,000 |
| Nov 17, 2025 | Completed final sign-off Feb 2026 | 518 15th Av | to remodel kitchen and bathroom. add 1 new bathroom at 1st foor.Details
to remodel kitchen and bathroom. add 1 new bathroom at 1st foor. | $40,000 |
| Nov 17, 2025 | Completed final sign-off Feb 2026 | 516 15th Av | to remodel kitchen and bathroom. add 1 new bathroom at 2nd foor.Details
to remodel kitchen and bathroom. add 1 new bathroom at 2nd foor. | $40,000 |
| Apr 21, 2025 | Completed final sign-off Dec 2025 | 255 Westgate Dr | conversion of garage storage space to conditioned area to provide new exercise room, bedroom and half bathroom. remodel of existing bathroom on ground floor. no changes to bulk or mass. no changes to exterior. new conditioned area of 476 sqft.Details
conversion of garage storage space to conditioned area to provide new exercise room, bedroom and half bathroom. remodel of existing bathroom on ground floor. no changes to bulk or mass. no changes to exterior. new conditioned area of 476 sqft. | $65,000 |
| Jul 11, 2024 | In progress issued Jul 2024 | 17 Ford St | to remodel 1 kitchen in unit 19. install new bathroom sink in unit 17 & 19'@ half bath. rewire both units in-kind. new sink to not impede egress or required toilet clearances.Details
to remodel 1 kitchen in unit 19. install new bathroom sink in unit 17 & 19'@ half bath. rewire both units in-kind. new sink to not impede egress or required toilet clearances. | $45,000 |
| May 15, 2024 | Completed final sign-off Aug 2024 | 1723 22nd Av | remodel one kitchen & one bathroom in kind - no change to floor layout or wall layout, no structural work. to comply w/ 202303490 nov: repair garage door, front door, front windows, and door inside garage in kind.Details
remodel one kitchen & one bathroom in kind - no change to floor layout or wall layout, no structural work. to comply w/ 202303490 nov: repair garage door, front door, front windows, and door inside garage in kind. | $40,000 |
| May 2, 2024 | Completed final sign-off Jun 2024 | 110 Colon Av | to remodel bathroom in kind 5x8 replace tile fixturesDetails
to remodel bathroom in kind 5x8 replace tile fixtures | $12,500 |
| Apr 15, 2024 | Completed final sign-off Jun 2024 | 505 Diamond St | to remodel bathroom. no removal of wallsDetails
to remodel bathroom. no removal of walls | $12,500 |
| Jan 29, 2024 | Completed final sign-off Mar 2024 | 231 Valley St | apt# 4: remodel bathroom to comply with complaint # 202315782. like for like.Details
apt# 4: remodel bathroom to comply with complaint # 202315782. like for like. | $12,500 |
| Oct 25, 2023 | Completed final sign-off Feb 2024 | 120 18th Av | remodel (1) kitchen and (1) bathroom in kind. no change to wall layout. no change to floor layout. no structural work. replace (16) windows in kind - 6 front street facing, 6 rear, and 4 side. same size and location. u factor 0.30 max. maintain eero per cbc 1031 where required.Details
remodel (1) kitchen and (1) bathroom in kind. no change to wall layout. no change to floor layout. no structural work. replace (16) windows in kind - 6 front street facing, 6 rear, and 4 side. same size and location. u factor 0.30 max. maintain eero per cbc 1031 where required. | $30,000 |
| Jun 8, 2023 | Completed final sign-off Sep 2023 | 671 Connecticut St | to remodel 1 kitchen (10 x 12) and 1 bathroom (5x8) on 2nd floor.Details
to remodel 1 kitchen (10 x 12) and 1 bathroom (5x8) on 2nd floor. | $30,000 |
| Apr 6, 2023 | Completed final sign-off Aug 2023 | 462 Urbano Dr | remodel (e) ktichen& bathroom in-kind. remodel laundry. no removal of wallsDetails
remodel (e) ktichen& bathroom in-kind. remodel laundry. no removal of walls | $30,000 |
| Apr 6, 2023 | Completed final sign-off Aug 2023 | 800 Teresita Bl | remodel (e) kitchen & bathroom, in-kind. no removal of wallsDetails
remodel (e) kitchen & bathroom, in-kind. no removal of walls | $30,000 |
| Feb 17, 2023 | Expired or cancelled cancelled May 2025 | 1466 Oakdale Av | to redmodel kitchen and 2 bathrooms as in kind. to comply with nov#201904352 & nov#202184311Details
to redmodel kitchen and 2 bathrooms as in kind. to comply with nov#201904352 & nov#202184311 | $30,000 |
| Dec 19, 2022 | Completed final sign-off Nov 2023 | 1370 Portola Dr | int remodel & rooms down into (e) storage. includes remodel of kitchen living area & conversion of storage space below living area to provide new family rm, bedrm & (2) bathrooms. includes relocation of some int partitions & modification to (e) stairs. changes to several rear window @ lower additionDetails
int remodel & rooms down into (e) storage. includes remodel of kitchen living area & conversion of storage space below living area to provide new family rm, bedrm & (2) bathrooms. includes relocation of some int partitions & modification to (e) stairs. changes to several rear window @ lower addition | $250,000 |
| Dec 6, 2022 | Completed final sign-off Apr 2023 | 4431 California St | address nov # 202295600 2nd fl. create opening between kitchen and dining, add full bath remove chimney. 3rd floor add full bath.Details
address nov # 202295600 2nd fl. create opening between kitchen and dining, add full bath remove chimney. 3rd floor add full bath. | $35,000 |
| Oct 25, 2022 | Completed final sign-off Mar 2023 | 151 Parker Av | to remodel 3 1/2 bathrooms, remodel one kitchen, and remodel one wet barDetails
to remodel 3 1/2 bathrooms, remodel one kitchen, and remodel one wet bar | $40,000 |
| Sep 20, 2022 | Completed final sign-off Feb 2023 | 552 15th Av | remodel 1 kitchen & 1-1/2 bathrom replace in-kind, kitchen 10' x 10'. bathroom 5' x 8'. title change on floor in half bath. no structural work.Details
remodel 1 kitchen & 1-1/2 bathrom replace in-kind, kitchen 10' x 10'. bathroom 5' x 8'. title change on floor in half bath. no structural work. | $35,000 |
| Sep 16, 2022 | Completed final sign-off Apr 2023 | 4431 California St | to remodel kitchen and 2 and 1//2 bathroomsDetails
to remodel kitchen and 2 and 1//2 bathrooms | $40,000 |
| Jul 12, 2022 | Completed final sign-off Sep 2022 | 458 Frederick St | remodel one kitchen and one bath in kind. no wall changesDetails
remodel one kitchen and one bath in kind. no wall changes | $25,000 |
| Oct 25, 2021 | Completed final sign-off Mar 2022 | 2531 31st Av | to remodel kitchen and bathroom same as is and rewire houseDetails
to remodel kitchen and bathroom same as is and rewire house | $35,000 |
| Sep 28, 2021 | Completed final sign-off Dec 2021 | 7911 Geary Bl | one bathroom remodel in kind. non structural. lights per cenc 150.0(k).Details
one bathroom remodel in kind. non structural. lights per cenc 150.0(k). | $25,000 |
| Sep 28, 2021 | Completed final sign-off Feb 2022 | 171 Lobos St | 1 kitchen and 1 bathroom remodel in kind.non structural. lights per cenc 150.0(k).Details
1 kitchen and 1 bathroom remodel in kind.non structural. lights per cenc 150.0(k). | $30,000 |
| Sep 27, 2021 | Completed final sign-off Jun 2022 | 362 Connecticut St | interior remodel of (e) 2 family residential bldg. upper unit (364) kitchen remodel, non-load bearing demo, new structural header; lower unit (362) demo (e) kitchen, relocate to lower level; new bathroom and officeDetails
interior remodel of (e) 2 family residential bldg. upper unit (364) kitchen remodel, non-load bearing demo, new structural header; lower unit (362) demo (e) kitchen, relocate to lower level; new bathroom and office | $52,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2021 | 535 05th Av | to remodel 1 kitchen & 1 bathroom. no new wal & no existing wll relocation. all new plumbng fixtures remain at same location. new lighting shall comply with cec 150.0(k)3 & (k)5Details
to remodel 1 kitchen & 1 bathroom. no new wal & no existing wll relocation. all new plumbng fixtures remain at same location. new lighting shall comply with cec 150.0(k)3 & (k)5 | $25,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2021 | 537 05th Av | to remodel 1 kitchen & 1 bathroom. no new wal & no existing wll relocation. all new plumbng fixtures remain at same location. new lighting shall comply with cec 150.0(k)3 & (k)5Details
to remodel 1 kitchen & 1 bathroom. no new wal & no existing wll relocation. all new plumbng fixtures remain at same location. new lighting shall comply with cec 150.0(k)3 & (k)5 | $25,000 |
| Feb 23, 2021 | Completed final sign-off May 2024 | 1245 Monterey Bl | ground floor remodel to create media room, bedroom, bathroom, laundry & storage.Details
ground floor remodel to create media room, bedroom, bathroom, laundry & storage. | $100,000 |
| Jan 19, 2021 | Completed final sign-off Sep 2021 | 235 Romain St | remove (e) kitchen & bathroom including interior walls in this area. provide new kitchen & bathroom.Details
remove (e) kitchen & bathroom including interior walls in this area. provide new kitchen & bathroom. | $70,000 |
| Dec 4, 2020 | Completed final sign-off Feb 2021 | 4700 Ocean Av | to remodel kitchen and 3 bathrooms, no layout change.Details
to remodel kitchen and 3 bathrooms, no layout change. | $20,000 |
| Nov 20, 2020 | Completed final sign-off Nov 2021 | 935 Leavenworth St | unit 935: addition of 2nd bathroom within existing habitable space. no horizontal or vertical extension. no exterior work.Details
unit 935: addition of 2nd bathroom within existing habitable space. no horizontal or vertical extension. no exterior work. | $25,000 |
| Nov 18, 2020 | Completed final sign-off Nov 2021 | 939 Leavenworth St | addition of 2nd bathroom in 1 of 3 dwelling units ( unit 939, lot 28 ). the addition will be within (e) habitable space, w/o horizontal or vertical building extensions or removal of (e) interior or exterior wallsDetails
addition of 2nd bathroom in 1 of 3 dwelling units ( unit 939, lot 28 ). the addition will be within (e) habitable space, w/o horizontal or vertical building extensions or removal of (e) interior or exterior walls | $30,000 |
| Nov 9, 2020 | Completed final sign-off Jul 2021 | 2535 31st Av | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $30,000 |
| Oct 13, 2020 | Completed final sign-off Jan 2021 | 38 Glen Ct | to remodel bathroom (3rd fl)Details
to remodel bathroom (3rd fl) | $14,500 |
| Sep 21, 2020 | Completed final sign-off Jan 2021 | 300 Valley St | unit #2: remodel bathroomDetails
unit #2: remodel bathroom | $18,000 |
| Feb 4, 2020 | Never finaled issued Feb 2020, no final | 19 Laussat St | remodel kitchen and bathroom. no alteration of wall, window, or door.Details
remodel kitchen and bathroom. no alteration of wall, window, or door. | $16,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2020 | 462 Elizabeth St | bathroom addition, kitchen remodel and storage space corridor and door into back yard at 2nd flDetails
bathroom addition, kitchen remodel and storage space corridor and door into back yard at 2nd fl | $80,000 |
| Nov 8, 2019 | Never finaled issued Dec 2019, no final | 529 Texas St | g/f:interior remodel of extg s.f.d.. new bedroom, bath and officeDetails
g/f:interior remodel of extg s.f.d.. new bedroom, bath and office | $31,000 |
| Oct 10, 2019 | Completed final sign-off Feb 2020 | 74 Piedmont St | remodel 2 bathrooms & laundry.Details
remodel 2 bathrooms & laundry. | $30,000 |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 529 Texas St | remodel kitchen & bathroom on floor above garage, same location.Details
remodel kitchen & bathroom on floor above garage, same location. | $20,000 |
| Jun 24, 2019 | Completed final sign-off Oct 2019 | 198 Precita Av | remodel (e) upper bathroom in kind. not other changes proposed.Details
remodel (e) upper bathroom in kind. not other changes proposed. | $14,490 |
| Jun 19, 2019 | Completed final sign-off Oct 2019 | 198 Precita Av | interior remodeling work only. convert extg family room on main floor to make new bathroom/washer closet within extg space at extg s.f.d. no other changes to exterior nor lower floors.Details
interior remodeling work only. convert extg family room on main floor to make new bathroom/washer closet within extg space at extg s.f.d. no other changes to exterior nor lower floors. | $15,000 |
| Jan 29, 2019 | Completed final sign-off Apr 2019 | 939 Leavenworth St | remodel 80sq ft kitchen, and 50sq ft bathroom.Details
remodel 80sq ft kitchen, and 50sq ft bathroom. | $35,000 |
| Jan 10, 2019 | Completed final sign-off Apr 2019 | 411 Myra Wy | remodel bathroom. put new countertop and sink in kitchen, new electrical in kitchen. remodel in-kind, no structural work. comply with cec150.0(k)3 and cec150.0(k)5Details
remodel bathroom. put new countertop and sink in kitchen, new electrical in kitchen. remodel in-kind, no structural work. comply with cec150.0(k)3 and cec150.0(k)5 | $12,000 |
| Apr 3, 2018 | Completed final sign-off Jan 2019 | 60 Surrey St | remodel basement including - remodel bath & laundry, (n) window, replace (e) windows and door, remove dropped ceiling & add 134 sf of conditioned space (media, tv room, study & bath 1)Details
remodel basement including - remodel bath & laundry, (n) window, replace (e) windows and door, remove dropped ceiling & add 134 sf of conditioned space (media, tv room, study & bath 1) | $37,000 |
| Jun 20, 2017 | Completed final sign-off Feb 2018 | 1839 14th Av | remove non bearing wall to make master bed & remodel bath on 1st. convert 1/2 bath into full bathroom & closet on lower floor. remodel kitchen, bathroom on 2nd flr. repair & replace rear deck in kind, replace front (e) windows with alumn wood clad windows in same locations & sizesDetails
remove non bearing wall to make master bed & remodel bath on 1st. convert 1/2 bath into full bathroom & closet on lower floor. remodel kitchen, bathroom on 2nd flr. repair & replace rear deck in kind, replace front (e) windows with alumn wood clad windows in same locations & sizes | $40,000 |
| May 11, 2016 | Completed final sign-off Aug 2016 | 652 Oak St | remodel bathroom & kitchen. like for like. no walls removed or relocated or added.Details
remodel bathroom & kitchen. like for like. no walls removed or relocated or added. | $15,000 |
| Nov 30, 2015 | Completed final sign-off Feb 2016 | 650 Darien Wy | remodel bathroom and put 9 windows in the front and side of the house to be marvin wood aluminum clad windows truly divided to match existing.Details
remodel bathroom and put 9 windows in the front and side of the house to be marvin wood aluminum clad windows truly divided to match existing. | $12,000 |
| Oct 14, 2015 | Completed final sign-off Feb 2016 | 12 Laguna St | replace 16 windows at front with marvin aluminum-clad wood. remodel 1 kitchen and 1 bath.Details
replace 16 windows at front with marvin aluminum-clad wood. remodel 1 kitchen and 1 bath. | $25,000 |
| Sep 21, 2015 | Completed final sign-off Dec 2015 | 1245 Monterey Bl | remodel bathroom and replace cabinets in kitchenDetails
remodel bathroom and replace cabinets in kitchen | $9,000 |
| Jun 18, 2015 | Completed final sign-off Aug 2015 | 2497 Pacific Av | remodel bathroom @1st floor fixtures & finishes no structuralDetails
remodel bathroom @1st floor fixtures & finishes no structural | $10,000 |
| Jun 9, 2015 | Completed final sign-off Jun 2016 | 1837 Church St | bathroom and kitchen remodels with new addition of baths ea. floor. expand extg rear deck and wood steps. new window and rear door. not visible from street. no work to extg front of bldg.Details
bathroom and kitchen remodels with new addition of baths ea. floor. expand extg rear deck and wood steps. new window and rear door. not visible from street. no work to extg front of bldg. | $25,000 |
| Jun 3, 2015 | Completed final sign-off Sep 2015 | 848 26th Av | interior remodel of kitchen one bathroom and laundry room and one powder room.Details
interior remodel of kitchen one bathroom and laundry room and one powder room. | $25,000 |
| May 21, 2015 | Completed final sign-off Aug 2015 | 2497 Pacific Av | remodel one kitchen and 2 bathrooms.Details
remodel one kitchen and 2 bathrooms. | $20,000 |
| May 6, 2015 | Completed final sign-off Feb 2016 | 38 Cameo Wy | legalization of kitchen and second unit per ordinance 43-14. 2 bedrooms, 1 & 1/2 bath already permitted and approved.Details
legalization of kitchen and second unit per ordinance 43-14. 2 bedrooms, 1 & 1/2 bath already permitted and approved. | $10,000 |
| Apr 1, 2015 | Expired or cancelled withdrawn Feb 2016 | 848 26th Av | interior remodel of kitchen and bathroom & laundry area (17'-7" x 9'-9" kitchen, 10'x 5' bathroom, 6'-3" x 3'-1" powder room, 8' x 6' laundry room.Details
interior remodel of kitchen and bathroom & laundry area (17'-7" x 9'-9" kitchen, 10'x 5' bathroom, 6'-3" x 3'-1" powder room, 8' x 6' laundry room. | $17,500 |
| Dec 23, 2014 | Completed final sign-off Nov 2016 | 545 Laurel St | project propose horizontal extension of the (e) second flr of a single family residence. new addition to include new master bedroom & bathroom.Details
project propose horizontal extension of the (e) second flr of a single family residence. new addition to include new master bedroom & bathroom. | $50,000 |
| Jul 18, 2013 | Completed final sign-off Jan 2015 | 257 Collingwood St | revisions to pa# 2008-0605-3759/s1-change garage wood framing to slab on grade, add new beams at 2nd floor. change bedroom & bathroom layoutDetails
revisions to pa# 2008-0605-3759/s1-change garage wood framing to slab on grade, add new beams at 2nd floor. change bedroom & bathroom layout | $1,000 |
| Mar 25, 2013 | Completed final sign-off May 2014 | 143 Dwight St | to remodel kitchen & bathroom and upgrade wiring where needed and replace (6) windows on side and back not visible from street; kitchen- cabinet, counter, sink and appliances, bath: repl tub, sheetrock, toilet & sinkDetails
to remodel kitchen & bathroom and upgrade wiring where needed and replace (6) windows on side and back not visible from street; kitchen- cabinet, counter, sink and appliances, bath: repl tub, sheetrock, toilet & sink | $7,500 |
| Sep 24, 2012 | Completed final sign-off Oct 2012 | 1971 42nd Av | conform to nov #201117821. legalize rear deck and stair. single story 12'-6"x16'-0". remove unpermitted bathroom on 1st fl garage area. replace 5 front window in kind. wood casementDetails
conform to nov #201117821. legalize rear deck and stair. single story 12'-6"x16'-0". remove unpermitted bathroom on 1st fl garage area. replace 5 front window in kind. wood casement | $10,000 |
| Sep 21, 2012 | Never finaled filed Sep 2012, never issued | 2497 Pacific Av | remodel kitchen, guest bath and master bedroom, fill in main level alcove, 29 sq ft to add to kitchen. new rear deck and stairs. replace 2 exiting windows, replace 2 existing windows w/double french doors, replace eixsting french foor w/new.Details
remodel kitchen, guest bath and master bedroom, fill in main level alcove, 29 sq ft to add to kitchen. new rear deck and stairs. replace 2 exiting windows, replace 2 existing windows w/double french doors, replace eixsting french foor w/new. | $85,066 |
| Aug 27, 2012 | Completed final sign-off Oct 2012 | 1633 Dolores St | remodel kitchen and bathroom on 2nd floor 8x6Details
remodel kitchen and bathroom on 2nd floor 8x6 | $18,276 |
| Jun 28, 2012 | Completed final sign-off Aug 2012 | 2720 Bryant St | add sink and toilet in existing storage room next to bathroom and remodel existing bathrm, no new walls (all (n)lighting must comply with cec 150(k)Details
add sink and toilet in existing storage room next to bathroom and remodel existing bathrm, no new walls (all (n)lighting must comply with cec 150(k) | $9,000 |
| Feb 6, 2012 | Completed final sign-off May 2012 | 3100 Washington St | replace cabinetry in kitchen, vanity in bathroom and some new plugs and recessed light in kitchen.Details
replace cabinetry in kitchen, vanity in bathroom and some new plugs and recessed light in kitchen. | $7,500 |
| Aug 2, 2011 | Completed final sign-off Sep 2011 | 1285 Sanchez St | remodel one kitchen and one bathroom. non structural. all work in kind.Details
remodel one kitchen and one bathroom. non structural. all work in kind. | $15,000 |
| May 20, 2011 | Completed final sign-off Nov 2011 | 1734 Church St | t.i. demo (e) int. non struct partitions, mech fixtures, remove 1 bath w/all fixtures, upgrd (e) ada toilet rm only, remodel(e) fl slab where req'd for ada,new drains,new partitions,doors,casework ,lighting, plbg,elec,mechanical svc, no overnight accomodation. reframe (e) entry doorDetails
t.i. demo (e) int. non struct partitions, mech fixtures, remove 1 bath w/all fixtures, upgrd (e) ada toilet rm only, remodel(e) fl slab where req'd for ada,new drains,new partitions,doors,casework ,lighting, plbg,elec,mechanical svc, no overnight accomodation. reframe (e) entry door | $80,000 |
| May 17, 2011 | Completed final sign-off Apr 2012 | 208 07th Av | ground fl: replace portion of slab fl. convert (e) storage rm to study/guest rm. add full bath. relocate stair. enlarge 1 window/. 2nd fl: relocate stair. remodel kitch. add 1/2 bath. replace 2 walls w beams. replace window at rear and add balcony. 3rd fl; relocate kitch and bath. add laundr closetDetails
ground fl: replace portion of slab fl. convert (e) storage rm to study/guest rm. add full bath. relocate stair. enlarge 1 window/. 2nd fl: relocate stair. remodel kitch. add 1/2 bath. replace 2 walls w beams. replace window at rear and add balcony. 3rd fl; relocate kitch and bath. add laundr closet | $110,000 |
| Jan 4, 2011 | Completed final sign-off May 2011 | 659 12th Av | replace e windows with new. remove 1 wndow and 1 door. gr fl: enlarge storage rm in garge. remove 2nd stair to 1st fl.replace 2 walls w beams,remodel kitchen, dining, family rm, 1/2 bath. 3rd fl: replace 1 wall w/beam to expand mstr bdrm. relocate 1 non struct wall in front bedrms.rmdl baths.Details
replace e windows with new. remove 1 wndow and 1 door. gr fl: enlarge storage rm in garge. remove 2nd stair to 1st fl.replace 2 walls w beams,remodel kitchen, dining, family rm, 1/2 bath. 3rd fl: replace 1 wall w/beam to expand mstr bdrm. relocate 1 non struct wall in front bedrms.rmdl baths. | $90,000 |
| Apr 27, 2010 | Completed final sign-off Aug 2010 | 3534 Broderick St | remodel kitchen and bath. add new bath. replace existing windows with new marvin woodDetails
remodel kitchen and bath. add new bath. replace existing windows with new marvin wood | $15,000 |
| Apr 13, 2010 | Completed final sign-off Jun 2011 | 665 Myra Wy | remove non-bearing wall at upper floor, reconstruct of (e) stairs, new partial slab at ground floor & build in new bathroom, office & playroom at (e) storage space.Details
remove non-bearing wall at upper floor, reconstruct of (e) stairs, new partial slab at ground floor & build in new bathroom, office & playroom at (e) storage space. | $45,000 |
| Feb 17, 2010 | Completed final sign-off May 2010 | 307 Waller St | new bathroom on 3rd floor unit. replace (e) 7 windows with wood windowswork on 3rd floor.Details
new bathroom on 3rd floor unit. replace (e) 7 windows with wood windowswork on 3rd floor. | $17,500 |
| Feb 16, 2010 | Completed final sign-off Apr 2010 | 1432 Guerrero St | remodel kitchen and half bath. replace cabinetry counter top sink flooring. new electrical upgrade 10x10 . replace sheet rock sink vanity toilet 5x5 reuse extg appliances.Details
remodel kitchen and half bath. replace cabinetry counter top sink flooring. new electrical upgrade 10x10 . replace sheet rock sink vanity toilet 5x5 reuse extg appliances. | $18,275 |
| Dec 15, 2009 | Expired or cancelled expired Jul 2013 | 2013 Pine St | add shower to 1/2 bath @unit #2, no structural changes no added walls, no exterior changes, no window and no door work on this permitDetails
add shower to 1/2 bath @unit #2, no structural changes no added walls, no exterior changes, no window and no door work on this permit | $5,000 |
| Dec 9, 2009 | Completed final sign-off May 2010 | 41 Collins St | remodel 3 bathrooms, 1 kitchen & any dry rot repair. replace in kind, 15 windows, not visible from streetDetails
remodel 3 bathrooms, 1 kitchen & any dry rot repair. replace in kind, 15 windows, not visible from street | $30,000 |
| Mar 20, 2009 | Completed final sign-off May 2011 | 4390 Cesar Chavez St | remodel e area and convert to bedroom and remodel e bath at 2nd floor. install new furnace and water heater at garage. remove (e) 2/f to 1/f stairs & install (n) stairs to code.Details
remodel e area and convert to bedroom and remodel e bath at 2nd floor. install new furnace and water heater at garage. remove (e) 2/f to 1/f stairs & install (n) stairs to code. | $20,000 |
| Dec 15, 2008 | Completed final sign-off Feb 2009 | 703 15th Av | updated 2 kitchen, 2 bathrooms @ unit 703 - 707. replace kitchen cabinet,counter,sink. new tile, mixer and faucet in bathroom. no structural work.Details
updated 2 kitchen, 2 bathrooms @ unit 703 - 707. replace kitchen cabinet,counter,sink. new tile, mixer and faucet in bathroom. no structural work. | $22,000 |
| Oct 10, 2008 | Completed final sign-off Jun 2009 | 795 Darien Wy | kitchen and 3 and a half bath remodel on 2 floors changeing cabinets and countertops.Details
kitchen and 3 and a half bath remodel on 2 floors changeing cabinets and countertops. | $40,000 |
| Aug 4, 2008 | Completed final sign-off Oct 2008 | 278 Sanchez St | replace existing can light fixtures with new ones throughout unit, #3, repl trim throught unit, retile bathroom, install new cabinets,new shower valve & fixtures in bathrm, all interior work only, no doors/windows/walls under this permit , life safety work under separate permitsDetails
replace existing can light fixtures with new ones throughout unit, #3, repl trim throught unit, retile bathroom, install new cabinets,new shower valve & fixtures in bathrm, all interior work only, no doors/windows/walls under this permit , life safety work under separate permits | $10,000 |
| Jun 19, 2008 | Completed final sign-off Aug 2008 | 701 15th Av | work @ unit# 701 & # 705 only. updating fiixtures & finishes in 2 kitchens, 2 bathroom of each / both units.Details
work @ unit# 701 & # 705 only. updating fiixtures & finishes in 2 kitchens, 2 bathroom of each / both units. | $22,000 |
| Jan 29, 2008 | Completed final sign-off Feb 2008 | 2167 Hayes St | bathroom & kitchen remodel, replacing old fixtures and finishes with new. no structural changes, replace old furnace with new. some new lighting in kitchen & bath. provide min 50% of lighting wattage in kitchen in fluorescent lights. provide fluorescent light or occupancy sensor in bathroom.Details
bathroom & kitchen remodel, replacing old fixtures and finishes with new. no structural changes, replace old furnace with new. some new lighting in kitchen & bath. provide min 50% of lighting wattage in kitchen in fluorescent lights. provide fluorescent light or occupancy sensor in bathroom. | $11,800 |
| Nov 20, 2007 | Completed final sign-off Mar 2008 | 2249 Fulton St | remodel kitchen & 2 bathrooms in each unit (3) on the 2nd, 3rd & 45h floor of building. install cabinets & appliances. replace plumbing & electrical fixtures. replace 3 furnaces, 1 for each unit & needed ductwork.Details
remodel kitchen & 2 bathrooms in each unit (3) on the 2nd, 3rd & 45h floor of building. install cabinets & appliances. replace plumbing & electrical fixtures. replace 3 furnaces, 1 for each unit & needed ductwork. | $42,400 |
| Jul 2, 2007 | Completed final sign-off Sep 2007 | 3519 Moraga St | bathroom and kitchen remodel on 2nd floor. replace old items(counter/cabinets) with new. no significant or structural alterations. 50% of kchn lighting wattage to be fluorescent. bathroom lighting to be bluorescant or to be on occupant sensorDetails
bathroom and kitchen remodel on 2nd floor. replace old items(counter/cabinets) with new. no significant or structural alterations. 50% of kchn lighting wattage to be fluorescent. bathroom lighting to be bluorescant or to be on occupant sensor | $14,000 |
| Jun 19, 2006 | Completed final sign-off Aug 2006 | 102 Casitas Av | remodel of kitchen-new cabinets, electrical, remodel of three bathrooms & boards on deck less than 50%.Details
remodel of kitchen-new cabinets, electrical, remodel of three bathrooms & boards on deck less than 50%. | $25,000 |
| Feb 17, 2006 | Completed final sign-off Mar 2006 | 1538 Diamond St | kitchen & bathroom remodelings drawings referenced from revision to pa# 2006/01/27/3224. new beam added. place blocking & double studs bolow on ground floor.Details
kitchen & bathroom remodelings drawings referenced from revision to pa# 2006/01/27/3224. new beam added. place blocking & double studs bolow on ground floor. | |
| Jan 27, 2006 | Completed final sign-off Mar 2006 | 1538 Diamond St | remodel of kitchen , bathroom, sink, tub, vanity . repair old deck put in new french door in (e) opening new panel. electrical for kitchen & bath uvalue of door to be. 67Details
remodel of kitchen , bathroom, sink, tub, vanity . repair old deck put in new french door in (e) opening new panel. electrical for kitchen & bath uvalue of door to be. 67 | $15,000 |
| Sep 1, 2005 | Completed final sign-off Sep 2005 | 1005 Clayton St | remodel bath, tile tub and shower in 1005 claytonDetails
remodel bath, tile tub and shower in 1005 clayton | $7,500 |
| Aug 17, 2005 | Completed final sign-off Dec 2005 | 4911 17th St | kitchen remodel-cabinets, sink. bathroom remodel-toilet & sink. all non structural work.Details
kitchen remodel-cabinets, sink. bathroom remodel-toilet & sink. all non structural work. | $8,500 |
| Feb 8, 2005 | Completed final sign-off Jun 2005 | 491 23rd Av | remodel 2 baths, 2nd/3rd flr, new sheetrock in bathrooms only, plumbing, elec, tile, tub,fixtures.Details
remodel 2 baths, 2nd/3rd flr, new sheetrock in bathrooms only, plumbing, elec, tile, tub,fixtures. | $7,500 |