Block 1191, lot 027
2249 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1921
- Stories
- 3
- Units
- 3
- Rooms
- 7 bedrooms, 3 bathrooms
- Building
- 4,380 sq ft
- Lot
- 3,438 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 12, 2022 | Completed final sign-off Apr 2022 | 2249 Fulton St | new interior hand railing from front door to the stairs to the living area.add second handrail within unit (not common area). to comply with nov202184591.Details
new interior hand railing from front door to the stairs to the living area.add second handrail within unit (not common area). to comply with nov202184591. | $1,000 | |
| May 1, 2018 | Never finaled issued May 2018, no final | 2253 Fulton St | street spaceDetails
street space | ||
| Mar 20, 2018 | Completed final sign-off Dec 2018 | 2253 Fulton St | Talcon Builders | removal of 2nd flr wall to be replaced w/wppd beam and post. maher naDetails
removal of 2nd flr wall to be replaced w/wppd beam and post. maher na | $2,500 |
| Dec 28, 2012 | Never finaled issued Dec 2012, no final | 2249 Fulton St | street spaceDetails
street space | ||
| Nov 9, 2012 | Completed final sign-off Feb 2013 | 2249 Fulton St | repair dry rot and termite damage to stairs, (like for like).Details
repair dry rot and termite damage to stairs, (like for like). | $3,500 | |
| Oct 5, 2012 | Never finaled issued Oct 2012, no final | 2249 Fulton St | street space permitDetails
street space permit | ||
| Sep 4, 2012 | Completed final sign-off Feb 2013 | 2249 Fulton St | Kerley Construction Inc | revision to pa#201106017143, structural revision to moment frame, move location of column in garage, retrofit bay at front.Details
revision to pa#201106017143, structural revision to moment frame, move location of column in garage, retrofit bay at front. | $1,000 |
| Aug 21, 2012 | Completed final sign-off Feb 2013 | 2249 Fulton St | Gary Chan Plumbing | install new fire sprinkler system at garage level. total 16 heads. bldg permit 201106017143Details
install new fire sprinkler system at garage level. total 16 heads. bldg permit 201106017143 | $6,000 |
| Jun 13, 2012 | Never finaled issued Jun 2012, no final | 2249 Fulton St | street spaceDetails
street space | ||
| Jun 1, 2011 | Completed final sign-off Feb 2013 | 2249 Fulton St | Kerley Construction Inc | repair dryrot & termite damage to front entry stairs & at perimeter foundations, remove (e) 4x4 post in garage. replace with steel beams, grade beam & new concrete slab. expand garage into (e) lightwell.Details
repair dryrot & termite damage to front entry stairs & at perimeter foundations, remove (e) 4x4 post in garage. replace with steel beams, grade beam & new concrete slab. expand garage into (e) lightwell. | $20,000 |
| Jul 1, 2008 | Completed final sign-off Jul 2008 | 2249 Fulton St | Tom Lee Roofing Inc. | reroofing.Details
reroofing. | $12,950 |
| Apr 14, 2008 | Completed final sign-off May 2008 | 2249 Fulton St | modification to approval plan application 2008-0328-8306 change in foundation design.Details
modification to approval plan application 2008-0328-8306 change in foundation design. | ||
| Mar 28, 2008 | Completed final sign-off May 2008 | 2249 Fulton St | repair/replace existing foundation.Details
repair/replace existing foundation. | $20,000 | |
| Jan 7, 2008 | Never finaled issued Jan 2008, no final | 2249 Fulton St | street space permit only.Details
street space permit only. | ||
| Nov 20, 2007 | Completed final sign-off Mar 2008 | 2249 Fulton St | Hubert Penny | remodel kitchen & 2 bathrooms in each unit (3) on the 2nd, 3rd & 45h floor of building. install cabinets & appliances. replace plumbing & electrical fixtures. replace 3 furnaces, 1 for each unit & needed ductwork.Details
remodel kitchen & 2 bathrooms in each unit (3) on the 2nd, 3rd & 45h floor of building. install cabinets & appliances. replace plumbing & electrical fixtures. replace 3 furnaces, 1 for each unit & needed ductwork. | $42,400 |