65 permits since 2000: 53 completed, 3 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 11 completed, 2 never finaled. Typically 99 days from filing to permit and 743 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2024 | Completed final sign-off Jun 2025 | 636 Diamond St | revision to pa 202404109736 foundation structural revision due to existing conditions. replace interior stairDetails
revision to pa 202404109736 foundation structural revision due to existing conditions. replace interior stair | |
| Feb 5, 2024 | Completed final sign-off May 2024 | 805 Clayton St | revision to pa #202103307550. remove bath at basement and modify 1/2 bath to full at 1st fl. minor configuration change to stairs to basement. remove original basement level retaining wall. lower grade beam at basement line "e" and underpin constructed footings at perimeter walls of lower level br.Details
revision to pa #202103307550. remove bath at basement and modify 1/2 bath to full at 1st fl. minor configuration change to stairs to basement. remove original basement level retaining wall. lower grade beam at basement line "e" and underpin constructed footings at perimeter walls of lower level br. | |
| Mar 4, 2022 | Completed final sign-off Nov 2023 | 2154 Leavenworth St | to comply with nov202287128. revise pa202102124580: recifty north lightwell stasireway. reconstruction of (e) main entry staircase.Details
to comply with nov202287128. revise pa202102124580: recifty north lightwell stasireway. reconstruction of (e) main entry staircase. | $6,000 |
| Apr 18, 2019 | Completed final sign-off May 2024 | 805 Clayton St | revision to pa 2016-1020-0738 - eliminate basement level; eliminate car lift; eliminate 60 min rated skylight @ side passage; modify layout of unit 807, 1st floor; modify rear exit stair layoutDetails
revision to pa 2016-1020-0738 - eliminate basement level; eliminate car lift; eliminate 60 min rated skylight @ side passage; modify layout of unit 807, 1st floor; modify rear exit stair layout | |
| Dec 28, 2018 | Completed final sign-off Apr 2021 | 1435 05th Av | legalize 1st flr. 1st flr-enlarge garage opening, relocate doors, foundation work, (n) family rm. 2nd flr- (n) kitchen, power room finishes & enlarge opening between dining and kitchen. 3rd flr- (n) master bath finishes. (n) stair connecting 1st and 2nd flr.Details
legalize 1st flr. 1st flr-enlarge garage opening, relocate doors, foundation work, (n) family rm. 2nd flr- (n) kitchen, power room finishes & enlarge opening between dining and kitchen. 3rd flr- (n) master bath finishes. (n) stair connecting 1st and 2nd flr. | $90,000 |
| Nov 15, 2017 | Completed final sign-off Sep 2021 | 838 Page St | rear vertical & horizontal addition. 1st floor: guest & bathroom. 2nd floor: family & rear deck, 3rd floor: masterbedrm & bath, roof: skylights. (n) stairs connecting to 1st, 2nd & 3rd floorDetails
rear vertical & horizontal addition. 1st floor: guest & bathroom. 2nd floor: family & rear deck, 3rd floor: masterbedrm & bath, roof: skylights. (n) stairs connecting to 1st, 2nd & 3rd floor | $150,000 |
| Mar 1, 2017 | Completed final sign-off Jun 2019 | 1712 Castro St | board of appeals #16-161. (n) roof deck, (n) spiral stair access from 2nd fl & (n) sliding roof access skylight.Details
board of appeals #16-161. (n) roof deck, (n) spiral stair access from 2nd fl & (n) sliding roof access skylight. | |
| Oct 20, 2016 | Completed final sign-off Jun 2024 | 805 Clayton St | revision to site permit#201309066200-s 1) delete moving front facade back 6' (to remain as is). 2) add partial 4th floor in lieu of roof deck, 3) modify entry to unit 807, 4) add rear yard stair to grade, 5) interior layout modifications, 6) add rear deck @ 3rd level. fire sprinkler for entire bldg.Details
revision to site permit#201309066200-s 1) delete moving front facade back 6' (to remain as is). 2) add partial 4th floor in lieu of roof deck, 3) modify entry to unit 807, 4) add rear yard stair to grade, 5) interior layout modifications, 6) add rear deck @ 3rd level. fire sprinkler for entire bldg. | |
| Dec 4, 2014 | Never finaled issued Aug 2016, no final | 75 Buena Vista Tr | revision to permit #201403251602. deck @ 1st fl to be replaced, (n) stair w/ 1-hr wall & property line. unbuilt rood deck permitted to be removed from project. work pending variance case #20141152v. roof deck approved through permit 201403251602.Details
revision to permit #201403251602. deck @ 1st fl to be replaced, (n) stair w/ 1-hr wall & property line. unbuilt rood deck permitted to be removed from project. work pending variance case #20141152v. roof deck approved through permit 201403251602. | |
| Jun 27, 2014 | Completed final sign-off Jun 2019 | 1712 Castro St | (n) 226 s.f. roof deck, (n) spiral stair access from 2nd floor and (n) sliding roof deck access hatch skylight.Details
(n) 226 s.f. roof deck, (n) spiral stair access from 2nd floor and (n) sliding roof deck access hatch skylight. | $11,000 |
| Jan 25, 2013 | Never finaled issued Apr 2014, no final | 709 27th St | horiz. addition at front + rear + (n) 3rd story vertical addtion. at 1st flr: remodeled garage, (n) bath, (n) storage; 2nd flr: remodeled kitchen, living/dining rms, (n) w.c, deck,closets; 3rd flr: 3 (n) bedrms, 2 (n) baths, closets + deck. (n) interior stairs & (n) exterior spiral stairs. (n)Details
horiz. addition at front + rear + (n) 3rd story vertical addtion. at 1st flr: remodeled garage, (n) bath, (n) storage; 2nd flr: remodeled kitchen, living/dining rms, (n) w.c, deck,closets; 3rd flr: 3 (n) bedrms, 2 (n) baths, closets + deck. (n) interior stairs & (n) exterior spiral stairs. (n) | $410,000 |
| Nov 13, 2012 | Completed final sign-off Oct 2013 | 149 21st Av | interior renovation of single family dwelling. includes remodel of int non structural partitions, fixutes, and finishes. remodeled kitcheh, bats, and stairway. 2 new baths, and a finished space adjacent to garage. structural upgrades and titel 24Details
interior renovation of single family dwelling. includes remodel of int non structural partitions, fixutes, and finishes. remodeled kitcheh, bats, and stairway. 2 new baths, and a finished space adjacent to garage. structural upgrades and titel 24 | $250,000 |
| Oct 15, 2008 | Completed final sign-off Oct 2008 | 2822 Polk St | less than 50% repair to existing back staircase.Details
less than 50% repair to existing back staircase. | $5,000 |