Back to bathroom remodel contractors
Hive Builds Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Mar 2026
- Last 24 months
- 3 permits filed
65 permits since 2000: 53 completed, 3 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 87 days from filing to permit and 330 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2025 | In progress issued Oct 2025 | 563 Guerrero St | interior remodel of 2 (e) residential units. no change to building footprint or bedcount proposed. installation of (n) residential elevator. (n) kitchen & bathrooms. addition of half bath. (n) mep & windows for upper unit only. addition of (n) skylights.Details
interior remodel of 2 (e) residential units. no change to building footprint or bedcount proposed. installation of (n) residential elevator. (n) kitchen & bathrooms. addition of half bath. (n) mep & windows for upper unit only. addition of (n) skylights. | $250,000 |
| Apr 10, 2024 | Completed final sign-off Oct 2025 | 636 Diamond St | interior remodel @ basement to excavate to create (n) family room , laundry, storage , bathroom and office. (n) windows and door ( 1 window street facing). structual work and mep work will require seperate permits.Details
interior remodel @ basement to excavate to create (n) family room , laundry, storage , bathroom and office. (n) windows and door ( 1 window street facing). structual work and mep work will require seperate permits. | $420,000 |
| Feb 5, 2024 | Completed final sign-off May 2024 | 805 Clayton St | revision to pa #202103307550. remove bath at basement and modify 1/2 bath to full at 1st fl. minor configuration change to stairs to basement. remove original basement level retaining wall. lower grade beam at basement line "e" and underpin constructed footings at perimeter walls of lower level br.Details
revision to pa #202103307550. remove bath at basement and modify 1/2 bath to full at 1st fl. minor configuration change to stairs to basement. remove original basement level retaining wall. lower grade beam at basement line "e" and underpin constructed footings at perimeter walls of lower level br. | |
| Mar 5, 2021 | Completed final sign-off Apr 2022 | 2044 Great Hy | interiorize (e) tunnel entry. add new bathroom and den in (e) at 1/f garage space. new window and door at den. replace (e) windows in kind. new wood siding at front. remove (e) single siding at rear to uncover (e) redwood siding underneath.Details
interiorize (e) tunnel entry. add new bathroom and den in (e) at 1/f garage space. new window and door at den. replace (e) windows in kind. new wood siding at front. remove (e) single siding at rear to uncover (e) redwood siding underneath. | $55,000 |
| Feb 12, 2021 | Completed final sign-off Nov 2023 | 2154 Leavenworth St | interior remodel of 3rd floor residence. no change to sqft or lower levels. new kitchen and bathrooms w/ associated new plumbing, electrical and mechanical. addition of 480 sqft roofdeck. no vertical addition. access to roofdeck is existing.Details
interior remodel of 3rd floor residence. no change to sqft or lower levels. new kitchen and bathrooms w/ associated new plumbing, electrical and mechanical. addition of 480 sqft roofdeck. no vertical addition. access to roofdeck is existing. | $350,000 |
| Jun 21, 2019 | Expired or cancelled suspend Nov 2019 | 2828 Octavia St | new full bathroom in 3rd fl bedroom. ref pa #201707252933. no change to bldg envelope.Details
new full bathroom in 3rd fl bedroom. ref pa #201707252933. no change to bldg envelope. | $18,500 |
| Dec 28, 2018 | Completed final sign-off Apr 2021 | 1435 05th Av | legalize 1st flr. 1st flr-enlarge garage opening, relocate doors, foundation work, (n) family rm. 2nd flr- (n) kitchen, power room finishes & enlarge opening between dining and kitchen. 3rd flr- (n) master bath finishes. (n) stair connecting 1st and 2nd flr.Details
legalize 1st flr. 1st flr-enlarge garage opening, relocate doors, foundation work, (n) family rm. 2nd flr- (n) kitchen, power room finishes & enlarge opening between dining and kitchen. 3rd flr- (n) master bath finishes. (n) stair connecting 1st and 2nd flr. | $90,000 |
| Feb 6, 2018 | Completed final sign-off Jul 2019 | 77 Buena Vista Tr | interior remodl work & (n) exterior doors @ rear (east side) of bldg. remodel ktichen & bathroom, (n) gas fire place to replace wood burning. (n) ceiling framingDetails
interior remodl work & (n) exterior doors @ rear (east side) of bldg. remodel ktichen & bathroom, (n) gas fire place to replace wood burning. (n) ceiling framing | $156,000 |
| Nov 15, 2017 | Completed final sign-off Sep 2021 | 838 Page St | rear vertical & horizontal addition. 1st floor: guest & bathroom. 2nd floor: family & rear deck, 3rd floor: masterbedrm & bath, roof: skylights. (n) stairs connecting to 1st, 2nd & 3rd floorDetails
rear vertical & horizontal addition. 1st floor: guest & bathroom. 2nd floor: family & rear deck, 3rd floor: masterbedrm & bath, roof: skylights. (n) stairs connecting to 1st, 2nd & 3rd floor | $150,000 |
| Jul 25, 2017 | Completed final sign-off May 2020 | 2828 Octavia St | rear addition at 3/f, convert (e) rear deck to enclosed habitable space. new roof at rear. renovation (e) bathroom, enlarge (e) bedroom, new closets, new exterior doors and windows, new electrical & plumbing as required.Details
rear addition at 3/f, convert (e) rear deck to enclosed habitable space. new roof at rear. renovation (e) bathroom, enlarge (e) bedroom, new closets, new exterior doors and windows, new electrical & plumbing as required. | $130,000 |
| Aug 4, 2016 | Completed final sign-off Dec 2018 | 170 Park St | renovation of (e) 3rd flr office into bedroom with full bath including new roof. finishes & plumbing fixtures. plumbing for bathroom stubbed out in 2007 under separate perit. no work on (e) 1st & 2nd flrs and no change to (e) street facade. rear facade at 3rd flr to be modified.Details
renovation of (e) 3rd flr office into bedroom with full bath including new roof. finishes & plumbing fixtures. plumbing for bathroom stubbed out in 2007 under separate perit. no work on (e) 1st & 2nd flrs and no change to (e) street facade. rear facade at 3rd flr to be modified. | $90,000 |
| Jun 21, 2016 | Completed final sign-off Dec 2016 | 2124 Great Hy | this project involves the renovation of a kitchen & bathroom in the existing single family residence. the scope of work includes relocation/revising existing skylight in kitchen and bathrm;Details
this project involves the renovation of a kitchen & bathroom in the existing single family residence. the scope of work includes relocation/revising existing skylight in kitchen and bathrm; | $75,000 |
| Jun 2, 2015 | Completed final sign-off Dec 2015 | 3670 24th St | interior remodel extg bathroom, one new bathroom. add outlets/ltg. replace 2 windows in lightwell. no structural. no work to facade or street facing windows.Details
interior remodel extg bathroom, one new bathroom. add outlets/ltg. replace 2 windows in lightwell. no structural. no work to facade or street facing windows. | $60,000 |
| Sep 6, 2013 | Completed final sign-off Jun 2024 | 805 Clayton St | raise building to add garage. claim/condition behind new garage @ 1st level - unit 1. create new basement level = unit 1. 2nd & 3rd stories = unit 2. add roof deck for unit 2. unit 1 will be 1 kitchen, 1 dining, 1 living, 1.5 baths, 1 laundry, 2 bedrms. unit 2 will be: 1 kitchen, 1 dining, 1 family,Details
raise building to add garage. claim/condition behind new garage @ 1st level - unit 1. create new basement level = unit 1. 2nd & 3rd stories = unit 2. add roof deck for unit 2. unit 1 will be 1 kitchen, 1 dining, 1 living, 1.5 baths, 1 laundry, 2 bedrms. unit 2 will be: 1 kitchen, 1 dining, 1 family, | $450,000 |
| Sep 6, 2013 | Completed final sign-off May 2014 | 1231 19th St | renovate existing detached accessory use structure, no expansion beyond existing envelope, new full bathroom.Details
renovate existing detached accessory use structure, no expansion beyond existing envelope, new full bathroom. | $25,000 |
| Jan 25, 2013 | Never finaled issued Apr 2014, no final | 709 27th St | horiz. addition at front + rear + (n) 3rd story vertical addtion. at 1st flr: remodeled garage, (n) bath, (n) storage; 2nd flr: remodeled kitchen, living/dining rms, (n) w.c, deck,closets; 3rd flr: 3 (n) bedrms, 2 (n) baths, closets + deck. (n) interior stairs & (n) exterior spiral stairs. (n)Details
horiz. addition at front + rear + (n) 3rd story vertical addtion. at 1st flr: remodeled garage, (n) bath, (n) storage; 2nd flr: remodeled kitchen, living/dining rms, (n) w.c, deck,closets; 3rd flr: 3 (n) bedrms, 2 (n) baths, closets + deck. (n) interior stairs & (n) exterior spiral stairs. (n) | $410,000 |
| Nov 13, 2012 | Completed final sign-off Oct 2013 | 149 21st Av | interior renovation of single family dwelling. includes remodel of int non structural partitions, fixutes, and finishes. remodeled kitcheh, bats, and stairway. 2 new baths, and a finished space adjacent to garage. structural upgrades and titel 24Details
interior renovation of single family dwelling. includes remodel of int non structural partitions, fixutes, and finishes. remodeled kitcheh, bats, and stairway. 2 new baths, and a finished space adjacent to garage. structural upgrades and titel 24 | $250,000 |
| Sep 14, 2011 | Completed final sign-off Mar 2012 | 250 Texas St | #250a.1st fl. 190 sf addition in (e) grg inc. full bath, laundry, replace 4 windows, 1 ext .dr at side n rear. #250, 2nd fl, 35 sf addition in (e) lightwell. renovate (e) bart. replace 2 (e) windows at side n install 2 newskylightsDetails
#250a.1st fl. 190 sf addition in (e) grg inc. full bath, laundry, replace 4 windows, 1 ext .dr at side n rear. #250, 2nd fl, 35 sf addition in (e) lightwell. renovate (e) bart. replace 2 (e) windows at side n install 2 newskylights | $75,000 |
| Jul 12, 2010 | Completed final sign-off Dec 2010 | 218 Presidio Av | non structural renovation of 2 story condo. renovation and expansion of kitchen includes new hi-efficacy luminaries. renovation of adjacents bath (full) new finishes in power rm and master bath. all lighting on dimmers. 1 skylight to be replace with smaller.Details
non structural renovation of 2 story condo. renovation and expansion of kitchen includes new hi-efficacy luminaries. renovation of adjacents bath (full) new finishes in power rm and master bath. all lighting on dimmers. 1 skylight to be replace with smaller. | $140,000 |