Hive Builds Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Mar 2026
- Last 24 months
- 3 permits filed
65 permits since 2000: 53 completed, 3 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 8 completed, 1 never finaled. Typically 370 days from filing to permit and 450 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 19, 2018 | Completed final sign-off Apr 2021 | 1435 05th Av | horizontal rear addition. 1st floor - (n) family, laundry & mech room , rear balcony. 2nd floor - rear deck. (n) exterior connecting 1st floor to rear yard.Details
horizontal rear addition. 1st floor - (n) family, laundry & mech room , rear balcony. 2nd floor - rear deck. (n) exterior connecting 1st floor to rear yard. | $85,000 |
| Oct 12, 2018 | Completed final sign-off Jul 2024 | 403 28th St | remodel of single family home to consist of horizontal extension on all 3 levels & horizontal extension on 1st floor. (n) south deck, garage, garage door & entry. remodeled kitchen, (n) windows & doors. plumbing & electrical as needed. inclusion of a second unit on ground floor per 2021-000342cuaDetails
remodel of single family home to consist of horizontal extension on all 3 levels & horizontal extension on 1st floor. (n) south deck, garage, garage door & entry. remodeled kitchen, (n) windows & doors. plumbing & electrical as needed. inclusion of a second unit on ground floor per 2021-000342cua | $440,000 |
| Nov 15, 2017 | Completed final sign-off Sep 2021 | 838 Page St | rear vertical & horizontal addition. 1st floor: guest & bathroom. 2nd floor: family & rear deck, 3rd floor: masterbedrm & bath, roof: skylights. (n) stairs connecting to 1st, 2nd & 3rd floorDetails
rear vertical & horizontal addition. 1st floor: guest & bathroom. 2nd floor: family & rear deck, 3rd floor: masterbedrm & bath, roof: skylights. (n) stairs connecting to 1st, 2nd & 3rd floor | $150,000 |
| Jul 25, 2017 | Completed final sign-off May 2020 | 2828 Octavia St | rear addition at 3/f, convert (e) rear deck to enclosed habitable space. new roof at rear. renovation (e) bathroom, enlarge (e) bedroom, new closets, new exterior doors and windows, new electrical & plumbing as required.Details
rear addition at 3/f, convert (e) rear deck to enclosed habitable space. new roof at rear. renovation (e) bathroom, enlarge (e) bedroom, new closets, new exterior doors and windows, new electrical & plumbing as required. | $130,000 |
| Oct 20, 2016 | Completed final sign-off Jun 2024 | 805 Clayton St | revision to site permit#201309066200-s 1) delete moving front facade back 6' (to remain as is). 2) add partial 4th floor in lieu of roof deck, 3) modify entry to unit 807, 4) add rear yard stair to grade, 5) interior layout modifications, 6) add rear deck @ 3rd level. fire sprinkler for entire bldg.Details
revision to site permit#201309066200-s 1) delete moving front facade back 6' (to remain as is). 2) add partial 4th floor in lieu of roof deck, 3) modify entry to unit 807, 4) add rear yard stair to grade, 5) interior layout modifications, 6) add rear deck @ 3rd level. fire sprinkler for entire bldg. | |
| Jan 25, 2013 | Never finaled issued Apr 2014, no final | 709 27th St | horiz. addition at front + rear + (n) 3rd story vertical addtion. at 1st flr: remodeled garage, (n) bath, (n) storage; 2nd flr: remodeled kitchen, living/dining rms, (n) w.c, deck,closets; 3rd flr: 3 (n) bedrms, 2 (n) baths, closets + deck. (n) interior stairs & (n) exterior spiral stairs. (n)Details
horiz. addition at front + rear + (n) 3rd story vertical addtion. at 1st flr: remodeled garage, (n) bath, (n) storage; 2nd flr: remodeled kitchen, living/dining rms, (n) w.c, deck,closets; 3rd flr: 3 (n) bedrms, 2 (n) baths, closets + deck. (n) interior stairs & (n) exterior spiral stairs. (n) | $410,000 |
| Jul 20, 2010 | Completed final sign-off Sep 2010 | 4079 Mission St | replace dryrotted wood decking, guarrail, and joists as required in kind. provide add'l structural supportDetails
replace dryrotted wood decking, guarrail, and joists as required in kind. provide add'l structural support | $17,000 |
| Dec 21, 2009 | Completed final sign-off Jul 2010 | 266 Guerrero St | replace (e) wood deck with new wood deck. same size & same location.Details
replace (e) wood deck with new wood deck. same size & same location. | $18,000 |
| Dec 19, 2008 | Completed final sign-off Feb 2009 | 71 Beaver St | replace in kind, less than 50%, exterior deck at rear yard: new floor decking, new guardrail (upgrade spacing to code), new treads (all structure to remain). replace 7 wood windows w/vinyl insert windows at rear (not visible from street. 3 wood doors w/new wood doors at rear.Details
replace in kind, less than 50%, exterior deck at rear yard: new floor decking, new guardrail (upgrade spacing to code), new treads (all structure to remain). replace 7 wood windows w/vinyl insert windows at rear (not visible from street. 3 wood doors w/new wood doors at rear. | $20,000 |