Herling Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Dec 2025
- Last 24 months
- 2 permits filed
73 permits since 2000: 47 completed, 2 in progress, 19 never finaled, 5 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
9 stairs permits: 4 completed, 1 in progress, 4 never finaled. Typically 67 days from filing to permit and 586 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2024 | In progress issued Sep 2024 | 1524 Guerrero St | revision to 202302152014: interior stair layout change. bath layout change. kitchen layout change. added door at exit passageway. no exterior work, no plumbing fixture count changeDetails
revision to 202302152014: interior stair layout change. bath layout change. kitchen layout change. added door at exit passageway. no exterior work, no plumbing fixture count change | |
| Feb 15, 2023 | Never finaled issued Mar 2023, no final | 1524 Guerrero St | interior remodel of lower 2 floors, including kitchen and baths, new stair connecting 1/f and 2/f. new windows on all 3 levels, new hvac and electrical as required, 2 new skylights at 3/f.Details
interior remodel of lower 2 floors, including kitchen and baths, new stair connecting 1/f and 2/f. new windows on all 3 levels, new hvac and electrical as required, 2 new skylights at 3/f. | $394,000 |
| Jun 24, 2022 | Completed final sign-off Feb 2025 | 229 Bonview St | convert 575 sf of garage to conditioned space & replace int stair. replace foundation. demolish existing deck stair to upper deck. replace windows & doors @ rear. 3 new skylilghts. replace in-kind less than 50% of rear deck due to rot. replace in-kind front window due to dry-rotDetails
convert 575 sf of garage to conditioned space & replace int stair. replace foundation. demolish existing deck stair to upper deck. replace windows & doors @ rear. 3 new skylilghts. replace in-kind less than 50% of rear deck due to rot. replace in-kind front window due to dry-rot | $150,000 |
| Sep 4, 2015 | Never finaled issued Mar 2016, no final | 191 Moffitt St | (e) lower basement: provide (n) vestibule for stair to rear yard/(e)basement. (n) closet, (n) lower basement/(e) ground flr: (n) interior doors, move wall @ garage, expand (e) deck, (n) sliding glass door, (n) rear windows (e) second floor: remove wall @ livingdining rm, (n) rear sliding glass door.Details
(e) lower basement: provide (n) vestibule for stair to rear yard/(e)basement. (n) closet, (n) lower basement/(e) ground flr: (n) interior doors, move wall @ garage, expand (e) deck, (n) sliding glass door, (n) rear windows (e) second floor: remove wall @ livingdining rm, (n) rear sliding glass door. | $55,000 |
| Aug 13, 2015 | Completed final sign-off Jan 2020 | 177 08th Av | ground level: (n) family room, (n) bedroom, (n) bathroom, stair replacement. 2nd level: remodel kitchn, (n) rear deck, (n) powder room. 3rd level: remodel bedrooms & bathroom, (n) master bathroom, (n) laundry room, window replacements, infill (e) lightwells & add ground floor area below deck (515sf)Details
ground level: (n) family room, (n) bedroom, (n) bathroom, stair replacement. 2nd level: remodel kitchn, (n) rear deck, (n) powder room. 3rd level: remodel bedrooms & bathroom, (n) master bathroom, (n) laundry room, window replacements, infill (e) lightwells & add ground floor area below deck (515sf) | $285,000 |
| Nov 14, 2014 | Completed final sign-off Aug 2015 | 159 Commonwealth Av | add skylight and laylite at interior. main stair hall. no visible exterior work; maher n/aDetails
add skylight and laylite at interior. main stair hall. no visible exterior work; maher n/a | $20,000 |
| Jul 16, 2014 | Never finaled issued May 2015, no final | 566 Rhode Island St | 18 sqft, one story infill horizontal addition at rear of property. expanded (e) roof deck at level 2. interior remodel of kitchen & bathroom at level 1 . new stair & interior remodel at basement level. remediation of dry rot at front facade. cosmetic upgrades + replacement of windows and doors inDetails
18 sqft, one story infill horizontal addition at rear of property. expanded (e) roof deck at level 2. interior remodel of kitchen & bathroom at level 1 . new stair & interior remodel at basement level. remediation of dry rot at front facade. cosmetic upgrades + replacement of windows and doors in | $200,000 |
| Jul 8, 2014 | Never finaled issued Jul 2014, no final | 431 Eureka St | front entry stair repair less than 50% with same in-kind wood materialsDetails
front entry stair repair less than 50% with same in-kind wood materials | $4,000 |
| Jun 22, 2011 | Completed final sign-off Nov 2011 | 540 Hampshire St | barrier removal for (e) warehouse, upgrade (e) restrooms to ada at 2nd floor. provide handrails, stripe for stairs to 2nd floor. remodel (e) breakroom on 2nd floorDetails
barrier removal for (e) warehouse, upgrade (e) restrooms to ada at 2nd floor. provide handrails, stripe for stairs to 2nd floor. remodel (e) breakroom on 2nd floor | $30,000 |