Back to kitchen remodel contractors
Herling Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Dec 2025
- Last 24 months
- 2 permits filed
73 permits since 2000: 47 completed, 2 in progress, 19 never finaled, 5 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 7 completed, 1 in progress, 4 never finaled, 1 expired or cancelled. Typically 37 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2024 | In progress issued Sep 2024 | 1524 Guerrero St | revision to 202302152014: interior stair layout change. bath layout change. kitchen layout change. added door at exit passageway. no exterior work, no plumbing fixture count changeDetails
revision to 202302152014: interior stair layout change. bath layout change. kitchen layout change. added door at exit passageway. no exterior work, no plumbing fixture count change | |
| Feb 15, 2023 | Never finaled issued Mar 2023, no final | 1524 Guerrero St | interior remodel of lower 2 floors, including kitchen and baths, new stair connecting 1/f and 2/f. new windows on all 3 levels, new hvac and electrical as required, 2 new skylights at 3/f.Details
interior remodel of lower 2 floors, including kitchen and baths, new stair connecting 1/f and 2/f. new windows on all 3 levels, new hvac and electrical as required, 2 new skylights at 3/f. | $394,000 |
| Nov 24, 2021 | Completed final sign-off Jun 2022 | 2626 Union St | existing top fl. apartment - renovate (e) kitchen, alter ceiling at hall, bedroom, and kitchenDetails
existing top fl. apartment - renovate (e) kitchen, alter ceiling at hall, bedroom, and kitchen | $30,000 |
| Mar 5, 2020 | Never finaled issued Jul 2020, no final | 147 Baltimore Wy | kitchen & bathroom remodel w/window repair & skylight replacementsDetails
kitchen & bathroom remodel w/window repair & skylight replacements | $36,000 |
| Jun 17, 2019 | Completed final sign-off Nov 2019 | 638 Castro St | kitchen remodel, new wndow at rear and rear side, replace door, reduce size of e window. windows not visible from street.Details
kitchen remodel, new wndow at rear and rear side, replace door, reduce size of e window. windows not visible from street. | $20,000 |
| Jun 30, 2015 | Never finaled issued Oct 2015, no final | 191 Moffitt St | remodel kitchen and new master bathroom to replace extg master bathroom.Details
remodel kitchen and new master bathroom to replace extg master bathroom. | $35,000 |
| Dec 8, 2014 | Completed final sign-off May 2016 | 406 Connecticut St | kitchen remodel, replacement of kitchen windows and doors. in-fill of existing lightwell.Details
kitchen remodel, replacement of kitchen windows and doors. in-fill of existing lightwell. | $75,000 |
| Dec 5, 2014 | Completed final sign-off Sep 2015 | 2808 Fulton St | remodel existing kitchen and modify interior walls to create open living and dining area. no exterior workDetails
remodel existing kitchen and modify interior walls to create open living and dining area. no exterior work | $40,000 |
| Nov 17, 2014 | Completed final sign-off Sep 2015 | 167 Hancock St | remodel (e) bathroom & (e) kitchen @ (e) 1/f apartment. add laundry hookups, move water heater and furnace into existing closet, provide 1 hr. wall @ property line.Details
remodel (e) bathroom & (e) kitchen @ (e) 1/f apartment. add laundry hookups, move water heater and furnace into existing closet, provide 1 hr. wall @ property line. | $25,000 |
| Jul 16, 2014 | Never finaled issued May 2015, no final | 566 Rhode Island St | 18 sqft, one story infill horizontal addition at rear of property. expanded (e) roof deck at level 2. interior remodel of kitchen & bathroom at level 1 . new stair & interior remodel at basement level. remediation of dry rot at front facade. cosmetic upgrades + replacement of windows and doors inDetails
18 sqft, one story infill horizontal addition at rear of property. expanded (e) roof deck at level 2. interior remodel of kitchen & bathroom at level 1 . new stair & interior remodel at basement level. remediation of dry rot at front facade. cosmetic upgrades + replacement of windows and doors in | $200,000 |
| May 22, 2007 | Completed final sign-off Sep 2007 | 195 Downey St | none structural kitchen remodel (charge cabinets) in 195 downey only.Details
none structural kitchen remodel (charge cabinets) in 195 downey only. | $8,000 |
| Nov 28, 2006 | Expired or cancelled expired Aug 2011 | 830 Alabama St | unit b - kitchen/bath renovation. removing non bearing walls.Details
unit b - kitchen/bath renovation. removing non bearing walls. | $25,000 |
| Sep 29, 2006 | Completed final sign-off Dec 2006 | 1450 Hayes St | remodel kitchen. new cabinets, countertops. add dishwasher. replace stove, sink, new lighting flourescent only.Details
remodel kitchen. new cabinets, countertops. add dishwasher. replace stove, sink, new lighting flourescent only. | $25,000 |